Steve & Nancy Riffe
Work Logs Found: 1433
Category Work Time: 2653 Hours
 Date
Hours
Work Log Summary

Details

 01-16-2019
0.01
Paint by GLO Aircraft Painting-52F
       

 01-09-2019
0.01
Before paint pics
       

 01-04-2018
4.00
Finish lower intersection fairings
Details
       

 12-09-2017
1.00
Wheel pants installed
Details
     

 12-07-2017
4.00
Finally done with pin holes!
Details
       

 11-30-2017
3.00
Pin hole progress!
Details
       

 11-27-2017
2.00
Pin hole mayhem continures!
Details
       

 11-17-2017
3.00
Worked on filling pin holes
Details
     

 11-13-2017
2.00
Installed nutplates
Details
       

 11-07-2017
2.00
Wheel pants-intersection fairings-2
Details
       

 11-06-2017
2.00
Wheel pant/intersection fairing-1
Details
       

 11-02-2017
3.00
Fitting pants together, cut L. air dam
Details
       

 10-31-2017
2.00
Begin lower intersection fairings
Details
       

 10-18-2017
2.00
Adjust left wheel pant
Details
       

 10-05-2017
3.00
C/S pants for #8 screws, trim for tire clearance
Details
       

 10-04-2017
4.00
L. pant--install nut plates, c/s for tinnermans
Details
       

 10-03-2017
4.00
R. pant-add nutplates, rivet U808 bracket
Details
       

 10-02-2017
4.00
Add glass & flox inside pants
Details
       

 09-29-2017
5.00
Drilled pants to U807 brackets
Details
       

 09-28-2017
5.00
Drilled pants to U808 brackets
Details
       

 09-04-2017
3.00
Cut pants for gear leg
Details
       

 06-17-2017
0.00
Canopy buzz fixed
Details

 06-16-2017
1.00
Glued felt strips to canopy skirt
Details
       

 05-30-2017
0.00
Airworthiness Inspection
Details
     

 05-26-2017
0.50
New data plate, xponder check
Details
     

 05-10-2017
4.00

Details
       

 05-08-2017
1.00
Rub spot on upper cowl
Details
     

 05-06-2017
1.00
Resolve xponder, began dis-assembly
Details
       

 05-05-2017
0.10
Taxi test, brake check
Details
       

 05-04-2017
3.00
Wig-wag, trim, flap setup, brake line work
Details
       

 05-03-2017
3.00
Fuel tank calibration-2
Details
     

 05-02-2017
4.00
Fuel tank calibration-1
Details
       

 05-01-2017
3.00
Dynon calibrations-1
Details
       

 04-20-2017
4.00
Measurements for cg
Details
       

 04-19-2017
0.10
Weighing the plane-2
Details
       

 04-19-2017
4.00
Weighing the plane-1
Details
       

 04-18-2017
2.00
Install Transponder & b.u. battery
Details
       

 04-14-2017
1.00
Swapped clecos for screws
Details
     

 04-11-2017
2.00
Install engine cowl, drain r. fuel tank
Details
     

 04-10-2017
2.00
Engine run 3
Details
       

 04-08-2017
1.00
2nd Engine Run
Details

 04-06-2017
1.00
Intersection fairings-final
Details
     

 04-04-2017
2.00
Instersection fairings-11, clean canopy
Details
       

 04-03-2017
2.00
Intersection fairings-10, Crow belts-rear
Details
       

 03-31-2017
2.00
Intersection Fairings-9, Crow belts, fuel sender
Details
       

 03-27-2017
2.00
Intersection fairings-8
Details
       

 03-25-2017
1.00
Troubleshoot fuel pressure, test ELT
Details

 03-24-2017
1.00
Complete log books, ELT registration
Details

 03-23-2017
2.00
Intersection fairings-7, r. wing tip primer
Details
       

 03-22-2017
2.00
Intersection fairings-6, tail wheel springs
Details
       

 03-21-2017
2.00
Intersection fairings-5
Details
     

 03-20-2017
2.00
Intersection fairings-4
Details
       

 03-18-2017
3.00
First Engine Start!
Details
       

 03-17-2017
2.00
Intersection fairings-3
Details
       

 03-16-2017
2.00
Intersection fairings-3
Details
       

 03-15-2017
0.00
FAA registration complete
Details

 03-14-2017
3.00
Intersection fairings-2, red cube bracket
Details
       

 03-13-2017
2.00
Intersection fairings-1
Details
       

 03-11-2017
1.00
Remove canopy plastic sheeting
Details
     

 03-10-2017
3.00
Work on loose R. wing tip
Details
       

 03-10-2017
0.10
More pics of wing tip--see prev. post
Details
       

 03-09-2017
3.00
Adjust ailerons, install floors & seats
Details
       

 03-07-2017
4.00
Roll servo, snorkel, intersection fairings
Details
       

 03-06-2017
4.00
Registration forms, roll servo, L.. wing root gap
Details

 03-02-2017
4.00
A mostly unproductive day
Details
     

 02-28-2017
1.00
Empenage fairing, Dynon install, gas caps
Details
       

 02-27-2017
3.00
L. wing root gap seals, safety oil sender
Details
       

 02-25-2017
1.00
Adjust elevator trim
Details
       

 02-24-2017
4.00
Data plate, landing lights, gap seal
Details
       

 02-23-2017
2.00
Wing root fairing--rubber channel
Details
     

 02-22-2017
1.00
Apply N numbers, ground R. wing tip
Details
       

 02-21-2017
3.00
Wire left wing tip-nav/strobe & antenna
Details
       

 02-17-2017
3.00
Nav/strobe wiring at wing tips
Details
       

 02-14-2017
1.00
Install HID landing light bulbs
Details

 02-13-2017
3.00
Fuel sender wires, adjust flaps
Details
       

 02-11-2017
2.00
Installed com antennas, trim springs
Details
     

 02-10-2017
4.00
Rig ailerons, install mid cabin covers
Details
       

 02-09-2017
3.00
Trim wires, rudder install, avionics install
Details
       

 02-08-2017
2.00
Added engine oil, start wing tip wiring
Details
     

 02-07-2017
1.00
Install quick drain oil plug
Details
       

 02-06-2017
3.00
Misc items
Details
       

 02-03-2017
2.00
Landing lights, instruments, rudder horn
Details
       

 02-01-2017
1.00
Install quick drain oil plug
Details
       

 01-30-2017
2.00
Nav/strobe, roll servo wiring
Details
       

 01-27-2017
3.00
Pulled wires to wing tips
Details
       

 01-26-2017
4.00
Attach aileron controls, flap pushrods, pull wires
Details
       

 01-23-2017
2.00
Install flap hinge pins
Details
       

 01-21-2017
2.00
Finish Aileron, AOA/Pitot line,fuell vent install
Details
       

 01-20-2017
2.00
Safety wire tank brackets,AOA & Pitot lines
Details
       

 01-19-2017
2.00
Torque rear spar bolts, add screws to lower skin
Details
     

 01-18-2017
3.00
Torque wing bolts
Details
       

 01-17-2017
4.00
Final wing bolt install
Details
       

 01-16-2017
3.00
Fuel system check
Details
       

 01-10-2017
1.00
Finished VS install, prep for fuel flow
Details
       

 01-03-2017
1.00
Sloshed l. tank, install Andair fuel valve handle
Details
     

 01-02-2017
2.00
Checked R fuel tank for trash
Details
       

 01-01-2017
1.00
Install VS, torque fuel lines
Details
       

 12-31-2016
2.00
Elevator install, connect fuel lines
Details
       

 12-30-2016
1.00
Install wings with temp bolts
Details
       

 12-26-2016
0.50
Install HS
Details
       

 12-17-2016
1.50
Move Fuse to Hangar
Details
       

 12-16-2016
0.50
Wheel pants-5
Details
       

 12-09-2016
4.00
Wheel pants-4
Details
       

 12-07-2016
0.00
Raised plane-weight off the wheels
Details
       

 12-05-2016
1.00
Wheel pants-3
Details
     

 12-03-2016
3.00
Wheel pants-2
Details
       

 12-02-2016
2.00
Wheel pants-1
Details
       

 11-27-2016
1.00
Primer touch up on cowl
Details
       

 11-26-2016
2.00
Added filler for upper/lower transition
Details
       

 11-22-2016
2.00
Baggage Door Strut
Details
       

 11-21-2016
2.00
Added cotter pins, installed stick boot, paint gap
Details
       

 11-19-2016
2.00
Install seats & storage pouch
Details
       

 11-18-2016
2.90
Install panels and labels-final
Details
       

 11-18-2016
0.10
Finished applying decals
Details
       

 11-16-2016
2.00
Installed panels with velcro
Details
       

 11-14-2016
1.00
Seats & Panels arrived!
Details
       

 11-12-2016
2.00
Test ELT for position reporting
Details
       

 11-11-2016
2.00
Glare shield dress up, powered up the Skyview
Details
       

 11-10-2016
2.00
Finished wiring dimmers
Details
       

 11-09-2016
1.00
Wire run for dimmers
Details
     

 11-07-2016
1.00
Pics of labels
Details
       

 11-07-2016
5.00
Glare shield LED lighting
Details
       

 11-05-2016
2.00
Tank attach nutplates, panel labels, indirect wiri
Details
       

 11-03-2016
1.00
Rear baggage floor install final
Details
       

 11-01-2016
1.00
Begin rear baggage floor instal
Details
       

 10-31-2016
4.00
Install left & right floorboards
Details
       

 10-30-2016
2.00
Reroute AOA & Pitot lines
Details
       

 10-29-2016
3.00
Final AOA & Pitot lines, install flooring
Details
       

 10-28-2016
1.00
ELT-antenna whip re-do
Details
       

 10-26-2016
3.00
Latch blocks final
Details
       

 10-24-2016
1.00
Finishing up wiring ELT
Details
       

 10-23-2016
1.00
Baggage Door Redux-9
Details
       

 10-22-2016
3.00
Finish ELT antenna, wire mini din plug
Details
       

 10-19-2016
3.00
Baggage Door Redux-8
Details

 10-18-2016
1.00
Mount ELT Antenna
Details
       

 10-15-2016
0.50
Baggage Door Hinge-Rivet
Details
       

 10-14-2016
0.50
Purchased ELT
Details
     

 10-13-2016
2.00
Baggage Door Redux-7
Details
       

 10-12-2016
2.00
Baggage Door Redux-6
Details
       

 10-07-2016
2.00
Baggage Door Redux-5
Details
       

 10-06-2016
2.00
Baggage Door Redux-4
Details
       

 10-04-2016
1.00
Baggage Door Redux-3
Details
     

 10-03-2016
3.00
Baggage Door Redux-2
Details
       

 10-02-2016
1.00
Baggage Door Redux-1
Details
       

 10-01-2016
1.00
Cowling foil-2
Details
       

 09-30-2016
2.00
Cowling foil-1
Details
       

 09-28-2016
1.00
Ran tubing between windscreen and glareshield
Details
       

 09-26-2016
3.00
Prop tracking, safety wire prop bolts
Details
       

 09-24-2016
1.00
Ran ELT wiring
Details

 09-21-2016
3.00
Finished Wiring Seat Heaters
Details
       

 09-18-2016
2.00
Rear Heated Seat wiring-1
Details
       

 09-15-2016
4.00
Pink be gone! Cowling finished!
Details
       

 09-14-2016
4.00
Upper cowl done-lower needs final primer
Details
       

 09-10-2016
3.00
Upper-final sanding primer applied
Details
       

 09-09-2016
6.00
More cowling work
Details
       

 09-05-2016
5.00
Sanding glass on upper cowling
Details

 09-04-2016
3.00
Cowling work--continues
Details
     

 09-03-2016
4.00
Removed sanding primer from upper cowl
Details
       

 08-31-2016
4.00
Fix depressions in tips
Details
       

 08-28-2016
3.00
Finished glassing dowels inside tips
Details
       

 08-27-2016
3.00
Apply sanding primer to upper, resin to lower
Details
       

 08-26-2016
3.00
Glass dowel rods in tips-1
Details
       

 08-25-2016
2.00
Apply resin/acetone mix to cowlings
Details
       

 08-24-2016
3.00
Finish oil door, more cowl work
Details
       

 08-23-2016
3.00
Oil door fitting, continue cowl work
Details
       

 08-22-2016
2.00
Rivet Left Flap fairing
Details
       

 08-20-2016
2.00
Rivet R. Flap Fairing
Details
       

 08-19-2016
1.00
Cowl work-10, oil door hinge
Details
       

 08-18-2016
2.00
Cowl work-9, oil filler door work
Details
       

 08-16-2016
3.00
Cowl work-8
Details
       

 08-15-2016
3.00
Cowl work-7
Details

 08-14-2016
2.00
Cowl work-6
Details
       

 08-13-2016
3.00
Oil door-latches
Details
       

 08-13-2016
3.00
Cowl work 5
Details

 08-11-2016
4.00
Cowl work-4
Details

 08-10-2016
6.00
More cowling work-3
Details
     

 08-07-2016
3.00
Sanding & filling cowl-2
Details
       

 08-05-2016
5.00
Still filling & sanding cowlings
Details
       

 08-02-2016
2.00
Sanding upper & lower cowling
Details
       

 07-31-2016
2.00
Hinge pin cover work
Details
       

 07-28-2016
1.00
Glass around pin covers, rivet oil door hinge
Details
       

 07-27-2016
1.00
Fit hinge pins
Details
       

 07-26-2016
1.00
Rivet hinge to left side of cowl
Details
       

 07-25-2016
1.00
Rivet right hinge to upper cowl
Details
       

 07-23-2016
3.00
Baffle seals, oil door, hinge prep
Details
       

 07-17-2016
3.00
Oil door--hinge attachment
Details
       

 07-16-2016
3.00
Install scat tube, torque prop bolts,seal baffles
Details
       

 07-15-2016
3.00
Run plug wires
Details
       

 07-13-2016
1.00
GPS antenna wiring
Details
       

 07-12-2016
1.00
Oil filler door-1
Details
       

 07-11-2016
1.00
Dipstick tube-Install and Safety Wire
Details
       

 07-08-2016
1.00
Sniffle valve-done
Details
     

 07-07-2016
2.00
Sniffle valve-1
Details
       

 07-06-2016
4.00
Fuel pump overflow line
Details
       

 07-05-2016
5.00
Finish lower attach plates
Details
       

 07-04-2016
2.00
Work on lower cowl mounting plates
Details
       

 07-03-2016
2.00
More hi temp paint inside cowlings
Details
       

 07-02-2016
4.00
GPS antenna shelf--finish
Details
       

 07-01-2016
2.00
Lower cowling hinges, GPS antenna mount
Details
       

 07-01-2016
3.00
Lower cowling hinges, GPS antenna mount
Details
       

 07-01-2016
2.00
GPS mount
Details
       

 06-30-2016
3.00
Prep lower cowl for hnge rivets
Details
       

 06-29-2016
5.00
Resin to cowl interior, install nutplates for nose
Details
       

 06-28-2016
4.00
Epoxy cowl, begin GPS antenna mount
Details
       

 06-27-2016
6.00
Cowl inlet seals, GPS shelf
Details
       

 06-15-2016
3.00
CHT/EGT wiring-left side
Details
       

 06-14-2016
3.00
EGT/CHT wires connected-R. side
Details
       

 06-14-2016
1.00
Alternator blast tube
Details
       

 06-14-2016
2.00
Alternate air door
Details
       

 06-07-2016
3.00
Install prop, safety wire front backing plate
Details
       

 06-06-2016
3.00
Rivet nutplates to spinner backing plate
Details
       

 06-05-2016
1.00
Finish gap filler plates
Details
       

 06-04-2016
3.00
Drill spinner backing plates for nutplates
Details
       

 06-01-2016
3.00
Fab spinner gap plates
Details
       

 05-26-2016
3.00
Set spinner/blade clearance
Details
       

 05-24-2016
3.00
RIvet sides and rear seals to baffles
Details
       

 05-23-2016
3.00
Lower ramp seals-2
Details
       

 05-19-2016
1.00
Lower cowl ramp seals-1
Details
       

 05-18-2016
5.00
Front baffle seals-2
Details
       

 05-09-2016
3.00
Front baffle seals-1
Details
       

 05-07-2016
3.00
Side bafflle seals
Details
       

 05-02-2016
3.00
Rear baffle seals
Details
       

 05-01-2016
2.00
Blast tubes for mags
Details
       

 04-29-2016
2.00
L. side bension rods installed
Details
       

 04-28-2016
2.00
R. side tension rods finished
Details
       

 04-25-2016
1.00
Add stiffener to #3, start tension rods
Details
       

 04-24-2016
1.00
Install #1 baffle assembly
Details
       

 04-23-2016
3.00
Finish snorkel
Details
       

 04-22-2016
2.00
#2 baffle assembly-final riveting
Details
       

 04-21-2016
4.00
Snorkel and #2 baffle work-5
Details
       

 04-19-2016
3.00
Snorkel and #2 baffle work-4
Details
       

 04-18-2016
4.00
Snorkel and #2 baffle work-3
Details
       

 04-17-2016
2.00
Snrokel and #2 baffle work-2
Details
       

 04-16-2016
3.00
Snorkle and #2 baffle work-1
Details
       

 04-15-2016
2.00
Replace rivet on #1 baffle, start air filter insta
Details
       

 04-14-2016
4.00
Rivet #1 baffle assembly
Details
       

 04-13-2016
3.00
Final trim front baffles
Details
       

 04-11-2016
2.00
Final trim fwd. side baffles
Details
       

 04-10-2016
2.00
Install upper air ramps, trim baffles
Details
       

 04-01-2016
1.00
Install #3 baffle, trim r. air ramp
Details
       

 03-31-2016
4.00
Install oil cooler, rivet #3 baffle assembly
Details
       

 03-30-2016
4.00
#4 baffle riveting-final
Details
       

 03-29-2016
3.00
#4 Baffle riveting-2
Details
       

 03-28-2016
4.00
#4 Baffle riveting-1
Details
       

 03-26-2016
4.00
Oil cooler mounting-6
Details
       

 03-25-2016
3.00
Oil cooler mounting-5
Details
       

 03-24-2016
2.00
Clips for forward baffle to ramps
Details
       

 03-23-2016
1.00
R side conical gussett
Details
     

 03-21-2016
4.00
Oil cooler mounting-4, start conical gussets
Details
       

 03-19-2016
4.00
Oil cooler mounting-3
Details
       

 03-18-2016
2.00
Oil cooler mounting-2
Details
       

 03-17-2016
4.00
Oil cooler mounting-1
Details
       

 03-16-2016
5.00
Trim front baffles
Details
       

 03-15-2016
4.00
Rivet horizontal hinges-lower cowling
Details
       

 03-14-2016
3.00
Start front baffles
Details
       

 03-12-2016
1.00
Prep horizontal hinges for riveting
Details
       

 03-10-2016
3.00
Doubler for #3 baffle
Details
     

 03-09-2016
4.00
FAB work & paper clip marking
Details
       

 03-08-2016
3.00
FAB snorkel fitting-2
Details
       

 03-07-2016
6.00
Trimming baffles-2
Details
       

 03-05-2016
4.00
Trimming baffles-1
Details
       

 03-03-2016
4.00
R. baffle/ L. FAB work
Details
       

 03-02-2016
4.00
Baffled by inlet ramps!
Details
       

 03-01-2016
4.00
Fitting lower cowl to fwd. baffles
Details
       

 02-29-2016
3.00
FAB snorkle fitting-1
Details
       

 02-27-2016
3.00
Cowling nose and hinge pin covers
Details
       

 02-26-2016
1.00
Cowling nose work-4
Details
       

 02-26-2016
4.00
Baffles #4, #3 & side plates
Details
       

 02-25-2016
1.00
Cowling Nose Work-3
Details
       

 02-25-2016
4.00
#3 Baffle install-1
Details
       

 02-24-2016
2.00
Re-do of CB-1008B stiffener
Details
       

 02-24-2016
2.00
Cowling nose work-2
Details
       

 02-23-2016
3.00
Cowling noes work-1
Details
       

 02-21-2016
3.00
Re-do vertical hinges, work on face of cowl
Details
       

 02-20-2016
2.00
R. side cowling mis-match
Details
       

 02-19-2016
2.00
L. side cowling mis-match
Details
       

 02-18-2016
3.00
Rivet long hinge-upper cowl, fab retainer
Details
       

 02-17-2016
2.00
Rivet upper cowl short hinge
Details
       

 02-16-2016
3.00
More fitting upper cowl-vertical hinge issue
Details

 02-15-2016
5.00
Rivet vertical hinges-skin side
Details
       

 02-13-2016
4.00
Drill upper horizontal hinges
Details
       

 02-13-2016
3.00
Drill lower horizontal hinge
Details
       

 02-09-2016
2.00
Trimmed cowlings--horizontal fittment
Details
       

 02-08-2016
3.00
Drill lower cowl vertical hinges
Details
       

 02-07-2016
3.00
Rivet lower hinges, drill vertical hinges
Details
       

 02-05-2016
4.00
Fit lower cowl to bottom, drilled lower hinges
Details
       

 02-04-2016
3.00
Fabbed upper shim strips, sanded for 1/16"gap
Details
       

 02-03-2016
4.00
Fab lower hinges, trim lower cowl aft
Details
       

 01-31-2016
3.00
Drill & cleco aft part of top cowling
Details
       

 01-30-2016
4.00
Trim aft part of top cowl
Details
       

 01-28-2016
3.00
Matching front of upper & lower cowling-1
Details
       

 01-27-2016
2.00
Fitting top cowl-1
Details
       

 01-25-2016
4.00
Drilled spinner to backing plates
Details
       

 01-24-2016
2.00
Installed the prop!
Details
       

 01-23-2016
1.00
Trimming spinner for prop
Details
       

 01-22-2016
3.00
Install backing plate, begin spinner mount
Details
       

 01-21-2016
1.00
Got prop out of box.
Details
       

 01-20-2016
1.00
Cleaned up & installed tips
Details
     

 01-19-2016
2.00
Bonded backing strips for plexi covers
Details
       

 01-19-2016
2.00
Added wires to Molex connectors
Details
       

 01-18-2016
2.00
Backing strips for lens cover-Right
Details
       

 01-17-2016
3.00
Backing strips for lens cover-Left
Details
       

 01-16-2016
2.00
Installed nav light-right tip
Details
     

 01-15-2016
3.00
Finish L. lens cover, mount nav light
Details
       

 01-14-2016
2.00
Wing tip lens covers-3
Details
       

 01-13-2016
1.00
Mark spinner and cut for blades
Details
       

 01-09-2016
1.00
C/S fuse holes for flap fairing
Details
     

 01-08-2016
1.00
Primered wing root fairings
Details

 01-07-2016
3.00
Closed hole for step
Details
       

 01-05-2016
5.00
Wing tip lens covers-2
Details
       

 01-04-2016
4.00
Wing tip lens covers-1
Details
       

 01-03-2016
1.00
Glassed in Archer NAV antenna
Details
       

 01-02-2016
1.00
Rivet W-412 tip ribs
Details
       

 01-01-2016
2.00
Rivet p3 hinges to fiberglass tips-3
Details
       

 12-31-2015
3.00
Modify Archer antenna
Details
       

 12-30-2015
5.00
Rivet p3 hinges to fiberglass tips-2
Details
       

 12-29-2015
3.00
Rivet p3 hinges to fiberglass tips-1
Details
       

 12-28-2015
3.00
Riveting p4 hinges to wings-2
Details
       

 12-27-2015
4.00
Riveting p4 hinges to wings-1
Details
       

 12-26-2015
2.00
C/S r. tip, primered p3 hinges
Details
       

 12-24-2015
2.00
C/S L. tip, rivet nutplates, dimple wing skins
Details
       

 12-22-2015
3.00
Remove flanges from tips
Details
       

 12-20-2015
1.00
L.wing tip-hinge pin retainer clips
Details
     

 12-18-2015
2.00
Modify rib for left tip
Details
       

 12-17-2015
3.00
Fab pin retainer-R. tip
Details
       

 12-16-2015
4.00
R. tip rib installation
Details
       

 12-14-2015
3.00
Glassed inside or R. tip, drilled L. tip
Details
       

 12-13-2015
1.00
Added some resin to r. tip to hold shape
Details
     

 12-12-2015
3.00
Re-drilled R tip, split the trailing edge
Details
       

 12-11-2015
2.00
Drill P4 hinges to L. wing
Details
       

 12-10-2015
4.00
Glassed holes on R. tip, drilled hinge L. skin
Details
       

 12-09-2015
3.00
Fitting L & R tips-3
Details
       

 12-08-2015
1.00
Finish L. wing fuel vent
Details
       

 12-07-2015
1.00
L. vent line install
Details
       

 12-06-2015
2.00
R. & L. wing vent tube installation
Details
       

 12-05-2015
4.00
R.wing coiled vent tube
Details
       

 12-04-2015
2.00
Finished nutplates, began fitting tip
Details
       

 12-03-2015
1.00
Roll servo install-2
Details
     

 12-02-2015
1.00
Roll servo install-1
Details
       

 12-01-2015
4.00
Install nutplates-wing root fairings-4, slot tab
Details
       

 11-30-2015
0.50
Slot tank tab,flare fuel line, install grommets
Details
       

 11-30-2015
4.50
Install nutplates, slot tank tab, flare fuel line
Details
       

 11-29-2015
3.00
Install nutplates for wing root fairings-3
Details
     

 11-28-2015
5.00
Install nutplates for wing root fairings-2
Details
       

 11-27-2015
4.00
Install nutplates for wing root fairings-1
Details
       

 11-25-2015
4.00
Drill for nutplates, machine c/s wing root
Details
       

 11-23-2015
1.00
Begin roll servo install-1
Details
       

 11-21-2015
2.00
Primered fuse, install tank brackets
Details
       

 11-20-2015
2.00
Dimple holes, add wiring holes, prep R. fuel line
Details
       

 11-18-2015
2.00
Drilled for lower wing nutplate attachments
Details
       

 11-17-2015
2.00
Deburr wing & fuse-match drill tank attach bracket
Details
       

 11-16-2015
4.00
Trimmed R. flap, removed wings
Details
       

 11-14-2015
3.00
Trim L. inboard lower flap skin
Details
       

 11-13-2015
5.00
Install R. flap fairing, trim R. wing fairing
Details
       

 11-12-2015
4.00
Trimmed L fwd fairing, match drilled flap fairing
Details
       

 11-11-2015
3.00
L.& R. flap pushrod installation
Details
       

 11-10-2015
5.00
Install and trim flaps
Details
       

 11-09-2015
0.10
Install L. & R. wing root fairings--more pics
Details
       

 11-09-2015
5.00
Install L. & R. wing root fairings
Details
       

 11-08-2015
3.00
Completed L. F-83-1 tank attach bracket
Details
       

 11-07-2015
3.00
Rebuild r. tank bracket F-863-1
Details
     

 11-05-2015
5.00
Install ailerons-set travel limits
Details
       

 11-04-2015
4.00
Finished L. tank attach bracket, started aileron i
Details
       

 11-03-2015
3.00
L. tank attach bracket
Details
       

 11-02-2015
2.00
Drill lower fuse skin to wing skin
Details
       

 11-01-2015
1.00
Drilled R. rear spar attachment
Details
     

 10-31-2015
3.00
Drilled L. rear spar stub
Details
       

 10-23-2015
0.10
Wing alignment-more pics
       

 10-23-2015
2.00
Wing alignment
Details
       

 10-18-2015
0.10
More wing install pics
Details
       

 10-17-2015
1.00
Installed the wings!
Details
       

 10-16-2015
1.00
Final prep for wing install
Details
       

 10-14-2015
1.00
R. tip hinge fab-4
Details
       

 10-13-2015
1.00
Windscreen fairing-25
Details
     

 10-13-2015
3.00
More prep for wing install
Details
       

 10-11-2015
4.00
Windscreen fairing-24
Details
       

 10-11-2015
2.00
R. tip hinge fab-3
Details
       

 10-10-2015
3.00
R. tip hinge fab-2
Details
       

 10-09-2015
3.00
R tip hinge fab-1
Details
       

 10-08-2015
2.00
Windscreen fairing-23
Details
       

 10-06-2015
3.00
Wing tip install-right side
Details
       

 10-04-2015
1.00
Made spacer block to set incidence
Details
       

 10-03-2015
2.00
Match drill wing to tip-left side
Details
       

 10-02-2015
2.00
Wing tip install-1 part 2 0f 2-left side
Details
     

 10-02-2015
4.00
Windscreen fairing-23 Part 1 of 2
Details
       

 10-01-2015
1.00
Wing Install-prep drill guides
Details
       

 09-30-2015
1.00
Windscreen fairing-22
Details
     

 09-26-2015
3.00
Windscreen fairing-21
Details
       

 09-24-2015
7.00
Windscreen fairing-20
Details
       

 09-21-2015
4.00
Windscreen fairing-19
Details
       

 09-08-2015
2.00
Windscreen fairing-18
Details
       

 09-07-2015
1.50
Windscreen fairing-17
Details
       

 09-06-2015
0.50
Engine-preservation
Details
       

 09-05-2015
4.00
Windscreen fairing-16
Details
       

 09-01-2015
4.00
Windscreen fairing-15
Details
       

 08-29-2015
5.00
Windscreen fairing-14
Details
       

 08-25-2015
4.00
Windscreen fairing-13
Details
       

 08-23-2015
4.00
Windscreen fairing-12
Details
       

 08-21-2015
5.00
Windscreen fairing-11
Details
       

 08-15-2015
3.00
Windscreen fairing-10
Details
       

 08-14-2015
1.00
Windscreen fairing-9
Details
       

 08-13-2015
5.00
Windscreen fairing-8
Details
       

 08-11-2015
2.00
Windscreen fairing-7
Details
       

 08-10-2015
4.00
Windscreen fairing-6
Details
       

 08-09-2015
4.00
Windscreen fairing-5
Details
       

 08-08-2015
4.00
Windscreen fairing-4
Details
       

 08-07-2015
5.00
Windscreen fairing-3
Details
       

 08-06-2015
3.00
Windscreen fairing-2
Details
       

 08-06-2015
1.00
Baggage door-rivet inside skin/ribs
Details
       

 08-05-2015
4.00
Windscreen fairing-1
Details
       

 08-04-2015
2.00
Prep for Windscreen fairing
Details
       

 08-03-2015
1.00
Baggage door install
Details
       

 08-02-2015
2.00
Tape windscreen
Details
       

 07-31-2015
3.00
Sikaflex windscreen-1
Details
       

 07-27-2015
2.00
Fitting windscreen-3
Details
       

 07-25-2015
3.00
Fitting windscreen-2
Details
       

 07-24-2015
4.00
Fitting windscreen-1
Details
       

 07-21-2015
5.50
Drill & cleco windscreen to rollbar
Details
       

 07-19-2015
0.50
Glareshield paint-2
Details
       

 07-18-2015
2.00
Glareshield paint
Details
     

 07-17-2015
3.00
Rivet F-821-1 top forward skin-7
Details
       

 07-16-2015
4.00
Rivet F-821-1 top forward skin-6
Details
       

 07-15-2015
4.00
Rivet F-821-1 top forward skin-5
Details
       

 07-14-2015
4.00
Rivet F-821-1 top forward skin-4
Details
       

 07-13-2015
3.00
RIvet F-821-1 top forward skin-3
Details
       

 07-12-2015
1.00
Rivet F-821-1 top forward skin-2
Details
       

 07-11-2015
3.00
Rivet F-821-1 top forward skin-1
Details
       

 07-10-2015
2.00
Cleco on top fwd. skin
Details
       

 07-09-2015
4.00
Install inst subpanel, rivet bulkhead cap
Details
       

 07-08-2015
5.00
Label instrument panel
Details
       

 07-05-2015
1.00
Paint panel-1
Details
       

 07-04-2015
2.00
Final radio check, nutplates for Dynon screen
Details
       

 07-03-2015
2.00
Troubleshoot co-pilot radio problems
Details
     

 07-01-2015
2.00
Filled left brake line--again
Details
       

 06-30-2015
2.00
Brake leak-left side
Details
       

 06-29-2015
1.00
Alternate air cable
Details
       

 06-27-2015
1.00
Radio issues
Details
       

 06-25-2015
4.00
Fresh air scat tube, NAV connector for GTN
Details
       

 06-24-2015
3.00
Installed some firesleeves, begin config on VP-X
Details
       

 06-23-2015
3.00
Cooling/Defrost fan install
Details
       

 06-22-2015
4.00
Scat tube-heat muff to cabin
Details
       

 06-21-2015
2.00
Ran taxi & landing light wires
Details
       

 06-20-2015
3.00
Rivet baggage hinge support, wire red cube
Details
       

 06-19-2015
3.00
Rivet Support Ribs to Top Skin
Details
       

 06-17-2015
3.00
Fit baggage floor, prepped top forward skin
Details
       

 06-15-2015
3.00
Fuel lines for red cube
Details
       

 06-12-2015
1.00
Remove top skin, squeeze iin a few rivets
Details
     

 06-11-2015
1.00
Temp install top skin, bubbles in brake line
Details
       

 06-10-2015
1.00
Add nut plates for r. brake line
Details

 06-09-2015
5.00
Upper cowl attach, more brake bubbles
Details
       

 06-08-2015
4.00
Fill brake lines
Details
       

 06-07-2015
3.00
More brake bleed prep, start upper cowl hinge
Details
       

 06-05-2015
4.00
Test fuel system
Details
       

 06-02-2015
5.00
Rivet doubler plates
Details
       

 06-01-2015
3.00
Air test brake system
Details
       

 05-30-2015
5.00
Torque exhaust nuts, run lower plug wires
Details
       

 05-29-2015
3.00
Firewall pass thru
Details
       

 05-28-2015
2.00
Drilled pipes to #30 for probes
Details
       

 05-27-2015
4.00
Drill holes for EGT probes
Details
       

 05-26-2015
5.00
Exhast hangars-2, heat muff
Details
       

 05-24-2015
5.00
Exhaust hangars-1
Details
       

 05-22-2015
4.00
Exhaust install
Details
       

 05-21-2015
3.00
Adel clamp fun!
Details
       

 05-20-2015
3.00
Temp sensor wire, connect mags to switches
Details
       

 05-19-2015
2.00
R. Mag wiring
Details
       

 05-18-2015
4.00
Shunt wiring, L mag wiring
Details
       

 05-17-2015
3.00
ANL wire to contactor, Transducer connections
Details
       

 05-09-2015
4.00
Oil & fuel pressure sensors connected
Details
       

 05-08-2015
2.00
MAP sensor wire connection
Details
       

 05-07-2015
1.00
EMS module-remove extra wires
Details
       

 05-06-2015
4.00
EMS wire run, plastic brake line-misc
Details
       

 05-04-2015
2.00
MAP, shunt & ANL mounted to F/W
Details
       

 05-03-2015
3.00
MAP sensor, shunt, ANL mounting
Details
       

 05-01-2015
1.00
MAP Sensor-restrictor
Details
       

 04-30-2015
3.00
Temp sensor,begin ANL & shunt doubler
Details
       

 04-29-2015
1.00
Transducor manifold, alternator wire
Details
       

 04-28-2015
1.00
Engine ground strap
Details
       

 04-27-2015
4.00
EMS terminate network cable, secure wires to F/W
Details
       

 04-26-2015
2.00
EMS mounting & wire run
Details
       

 04-25-2015
2.00
Spinner backplate-final
Details
       

 04-24-2015
4.00
Spinner backplate-2
Details
       

 04-23-2015
3.00
Preparing spinner backplate
Details
       

 04-22-2015
4.00
Starter cable install
Details
       

 04-20-2015
2.00
Control cable install--done!
Details
       

 04-19-2015
2.00
Attach throttle cable and governor cable
Details
       

 04-18-2015
3.00
Throttle quadrant-final install
Details
       

 04-17-2015
2.00
Riveted left F-804N-1 Bulkhead cap
Details
       

 04-15-2015
3.00
Alternate air door on FAB
Details
       

 04-13-2015
4.00
More throttle quadrant, start FAB
Details
       

 04-12-2015
4.00
Quadrant & cable install, governor work
Details
       

 04-10-2015
3.00
Alternator, control cable install-1
Details
       

 04-09-2015
5.00
Connected breather tube, all fuel lines
Details
       

 04-08-2015
6.00
Mount fuel servo, mixture & throttle brackets
Details
       

 04-07-2015
2.00
Cotter pins for engine mount nuts
Details
       

 04-06-2015
4.00
Hang that engine!
Details
       

 04-02-2015
2.00
Prep engine for install
Details
       

 04-01-2015
4.00
Re-route plastic brake lines
Details
       

 03-30-2015
2.00
Wired panel lights/GTN antenna connection
Details
       

 03-28-2015
0.00
Moved wings to new home
Details
       

 03-27-2015
2.00
Engine has arrived!
Details
       

 03-21-2015
2.00
Wires for boost pump light
Details
       

 03-18-2015
1.00
Starter contactor wiring
Details
       

 03-16-2015
1.00
Starter contactot wiring
Details
     

 03-14-2015
1.00
Pneumatic lines-A/S and Alt.
Details
       

 03-13-2015
2.00
Termporary install of EMS module
Details
       

 03-12-2015
2.00
Mount for EMS module
Details
       

 03-05-2015
2.00
Distribution Hub-3
Details
       

 03-04-2015
2.00
Distribution Hub-2
Details
       

 03-03-2015
2.00
Distribution hub-1
Details
       

 02-24-2015
0.10
Prop arrives!
Details
       

 02-23-2015
2.00
Connect GTN650 to ARINC-429
Details
       

 02-20-2015
1.00
Connect D-1000 to VP-X
Details
       

 02-18-2015
3.00
Wire USB to Dynon connector, add resistor-xponder
Details
       

 02-17-2015
2.00
USB cable for Dynon Screen
Details
       

 02-16-2015
3.00
Connected dimmer wire, changed some VP-X wires
Details
       

 02-12-2015
2.00
Failsafe warinig audio connected
Details
       

 02-11-2015
3.00
D-1000 power & xponder wiring
Details
       

 02-09-2015
3.00
Dynon screen wire run-1
Details
       

 02-07-2015
4.00
Finished up power & ground wiring from the radio s
Details
       

 02-06-2015
0.00
Engine/prop ordered
Details

 01-30-2015
1.00
Finish wiring mic/phones
Details
       

 01-28-2015
1.50
Prepped mic/phone cables
Details
       

 01-25-2015
0.50
Terminated antenna cable for A-210
Details
     

 01-24-2015
1.00
Termination of mic/phone wires
Details
     

 01-23-2015
1.00
Replace ground tabs, begin mic/phone wiring
Details
       

 01-19-2015
1.00
Install F/W pass thru for wires
Details
       

 01-16-2015
2.00
Installed round guages, work on radio stack
Details
       

 01-10-2015
2.00
Mounting round guages
Details
       

 01-08-2015
1.00
Cut panel for round guages
Details
       

 01-07-2015
2.00
More panel prep for backup guage mounting
Details
       

 12-29-2014
1.00
Laid out & marked for 3 round guages
Details
       

 12-28-2014
2.00
Finished nut plate holes
Details
       

 12-27-2014
2.00
Drill holes to mount Dynon
Details
       

 12-24-2014
2.00
Cut panel for Dynon Screen
Details
       

 12-23-2014
1.50
Make ready to cut panel for Dynon
Details
       

 12-21-2014
0.50
Prep for Dynon Skyview mount
Details
       

 12-20-2014
0.10
Move to Dallas area
Details
       

 07-20-2014
3.00
Radio tray rear support-final
Details
       

 06-30-2014
1.00
Radio tray rear support-4
Details
       

 06-29-2014
2.00
Radio tray rear support-3
Details
       

 06-28-2014
2.00
Radio tray rear support-2
Details
       

 06-26-2014
1.00
Radio tray rear support-1
Details
       

 06-24-2014
2.00
Fitting trays to panel-3
Details
       

 06-22-2014
2.00
Fitting trays to panel-2
Details
       

 06-21-2014
3.00
Fitting trays to panel
Details
       

 06-15-2014
2.00
Filing panel cut-out
Details
       

 06-14-2014
3.00
Cut panel for radio stack
Details
       

 06-13-2014
1.00
Recieved Avionics!
Details
       

 05-16-2014
1.00
Radio Stack Mounting-1
Details
       

 05-10-2014
2.00
Template for Radio Stack-2
Details
       

 03-28-2014
1.00
Template for Radio Stack-1
Details
       

 03-16-2014
2.00
Empennage Fairing-Final
Details
       

 03-15-2014
2.00
Empennage Fairing-24
Details
       

 03-13-2014
1.00
Empennage Fairing-23
Details
       

 03-12-2014
1.00
Empannage Fairing-22
Details
       

 03-11-2014
1.00
Empannage Fairing-21
Details
       

 03-10-2014
2.00
Empennage Fairing-20
Details

 03-06-2014
1.00
Empennage Fairing-19
Details
     

 03-04-2014
1.00
Empennage Fairing-18
Details
       

 02-27-2014
1.00
Empennage Fairing-17
Details
       

 02-23-2014
1.00
Empennage Fairing-16
Details
       

 02-19-2014
2.00
Empennage Fairing-15
Details
     

 02-16-2014
2.00
Empennage Fairing-14
Details

 02-15-2014
2.00
Empennage Fairing-13
Details
       

 02-14-2014
1.00
Empennage Fairing-12
Details
       

 02-08-2014
2.00
Empennage Attach-11
Details
       

 01-27-2014
0.50
Empennage Attach-10
Details
     

 01-26-2014
1.00
Empennage Attach-9
Details
       

 01-14-2014
0.50
Empennage Attach-8
Details
     

 01-12-2014
2.00
Empennage Fairing-7
Details
       

 01-11-2014
2.00
Empennage Attach-6
Details
       

 01-08-2014
0.50
Empennage Fairing-5
Details
       

 01-07-2014
1.50
Empennage Fairing-4
Details
       

 01-06-2014
1.00
Empennage Fairing-3
Details
       

 01-05-2014
0.50
Empennage Fairing-2
Details
     

 01-04-2014
1.00
Empennage Fairing-1
Details
       

 12-30-2013
0.50
Prep to Bleed Brakes
Details
       

 12-22-2013
1.00
Torque engine mount bolts, add firebarrier sealant
Details