KitLog pro

Powered By Kitlog Pro v2.0

Steve & Nancy Riffe
' style=
Date:  1-10-2017
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Finished VS install, prep for fuel flow

Received my latest care package—including bolts needed for the VS. I installed the lower 3 bolts that attach the VS to the fuse. Although the plans call for -6 bolts here, I used -7 for the two upper and a -6 for the bottom bolt. I could only feel 1 thread on the upper bolts using the hardware called for in the drawings, so went with the next longer bolt. Now I’ve got a couple threads showing. I tightened (torqued) the 9 bolts and marked with torque seal. Next, I removed the upper and lower cowling, then loosened the fuel line to the engine driven pump. I will connect this to some clear tubing in order to check output of the electrical pump.
' style=

VS install completed

VS install completed

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.