Date
|
Hours
|
Work Log Summary
|
Details
|
12-06-2014
|
40.00
|
Complete booth, spray sample
|
Details
|
|
|
11-26-2014
|
25.00
|
|
Details
|
|
|
11-13-2014
|
4.00
|
|
Details
|
|
|
11-12-2014
|
5.00
|
|
Details
|
|
|
11-11-2014
|
4.00
|
|
Details
|
|
|
11-10-2014
|
4.00
|
|
Details
|
|
|
11-09-2014
|
3.00
|
|
Details
|
|
|
11-08-2014
|
20.00
|
Catch up
|
Details
|
|
|
03-06-2014
|
4.50
|
Radio fixed, design TCW trim, misc.
|
Details
|
|
|
03-05-2014
|
3.00
|
Radio troubleshooting
|
Details
|
|
|
03-04-2014
|
4.00
|
Troublshooting radio
|
Details
|
|
|
03-03-2014
|
4.00
|
Cmplete tank vent repair
|
Details
|
|
|
03-02-2014
|
4.50
|
@#$%%$% tank vent
|
Details
|
|
|
03-01-2014
|
2.00
|
Wing tank vent nut, design
|
Details
|
|
|
02-28-2014
|
3.50
|
Flight, ID issues
|
Details
|
|
|
02-26-2014
|
2.00
|
Checks, vent leak
|
Details
|
|
|
02-25-2014
|
4.50
|
First and second flight
|
Details
|
|
|
02-24-2014
|
3.00
|
Waiting, misc things, checklist, landing checklist
|
Details
|
|
|
02-23-2014
|
6.00
|
Flight with Mike Seager
|
Details
|
|
|
02-22-2014
|
3.00
|
Final assembly
|
Details
|
|
|
02-21-2014
|
3.00
|
Details
|
Details
|
|
|
02-20-2014
|
3.00
|
Complete punch list, prep inside cowl
|
Details
|
|
|
02-19-2014
|
2.00
|
plug, seats
|
Details
|
|
|
02-18-2014
|
2.00
|
Put back more things
|
Details
|
|
|
02-17-2014
|
2.00
|
Put it back together
|
Details
|
|
|
02-16-2014
|
4.00
|
99.99% an airplane
|
Details
|
|
|
02-15-2014
|
3.00
|
Paper, DAR
|
Details
|
|
|
02-14-2014
|
2.50
|
EFIS settings, paperwork
|
Details
|
|
|
02-13-2014
|
4.00
|
Run motor, chase issues
|
Details
|
|
|
02-12-2014
|
4.00
|
Calivrate fuel tank levels, misc. details
|
Details
|
|
|
02-11-2014
|
3.00
|
Paperwork, oil, spin motor
|
Details
|
|
|
02-10-2014
|
4.00
|
Lower cowl baffle seal, paper, program
|
Details
|
|
|
02-09-2014
|
3.00
|
Magneto, nutplates, cowl-plenum
|
Details
|
|
|
02-08-2014
|
3.50
|
Weight and Balance, misc items
|
Details
|
|
|
02-07-2014
|
2.00
|
Paperwork, set up for W&B, SNOW
|
Details
|
|
|
02-06-2014
|
3.00
|
Fuel in the tank, screws
|
Details
|
|
|
02-05-2014
|
4.00
|
Decals, mag cooler
|
Details
|
|
|
02-04-2014
|
3.50
|
Wing walk, tail fairing, oil
|
Details
|
|
|
02-03-2014
|
4.00
|
Tail fairing, wing walks
|
Details
|
|
|
02-02-2014
|
4.50
|
Tail fairing and reorganize hanger
|
Details
|
|
|
02-01-2014
|
5.00
|
Tail fairing
|
Details
|
|
|
01-31-2014
|
3.50
|
Tail strobe/run lt, fues/fin fairing
|
Details
|
|
|
01-30-2014
|
4.00
|
Put on tail, N number, insurance, DAR
|
Details
|
|
|
01-29-2014
|
4.50
|
Installing stabr and fin
|
Details
|
|
|
01-28-2014
|
4.50
|
Gap covers, vent
|
Details
|
|
|
01-27-2014
|
4.00
|
Gap covers, nutplates
|
Details
|
|
|
01-26-2014
|
2.50
|
Wing/fues gap fillers
|
Details
|
|
|
01-25-2014
|
4.00
|
Trouble shoot, wing fairings
|
Details
|
|
|
01-24-2014
|
5.00
|
Mr Fixit, wires
|
Details
|
|
|
01-23-2014
|
4.00
|
Ailerons
|
Details
|
|
|
01-22-2014
|
5.00
|
Flaps, fuel line, fuel level, ailerons
|
Details
|
|
|
01-21-2014
|
4.50
|
Attachments
|
Details
|
|
|
01-20-2014
|
5.00
|
Fuel tank test WINGS ON
|
Details
|
|
|
01-19-2014
|
4.00
|
Fuel line, put in Pitot and fuel level senders
|
Details
|
|
|
01-18-2014
|
4.00
|
Wing mount, fues stuff.
|
Details
|
|
|
01-17-2014
|
4.00
|
Cowling, clean up and plan for wings
|
Details
|
|
|
01-16-2014
|
3.50
|
Spinner, check FWF, cowl final fitting
|
Details
|
|
|
01-15-2014
|
5.00
|
Decals, panel final, motor ground
|
Details
|
|
|
01-14-2014
|
2.50
|
Panel lables
|
Details
|
|
|
01-13-2014
|
4.50
|
Rugs, seats, seat belts, belt holder
|
Details
|
|
|
01-12-2014
|
4.00
|
Rugs, seat belts
|
Details
|
|
|
01-11-2014
|
3.50
|
Rugs, registration, brake fluid
|
Details
|
|
|
01-10-2014
|
3.00
|
Rugs
|
Details
|
|
|
01-09-2014
|
3.50
|
Rear panel, charger cord, rugs
|
Details
|
|
|
01-08-2014
|
4.50
|
Control sticks, side panels
|
Details
|
|
|
01-07-2014
|
5.00
|
Seat pans, seat heater wire, front panels, cup hol
|
Details
|
|
|
01-06-2014
|
4.50
|
Cover plate, com antenna, steps
|
Details
|
|
|
01-05-2014
|
5.00
|
Final assembly inside.
|
Details
|
|
|
01-04-2014
|
4.00
|
Seats, vents
|
Details
|
|
|
01-03-2014
|
3.50
|
Front seats
|
Details
|
|
|
01-02-2014
|
3.50
|
Seat heaters, seats
|
Details
|
|
|
01-01-2014
|
4.00
|
Panel lables, seats
|
Details
|
|
|
12-31-2013
|
4.50
|
Firewall sheilds, oil quick drain, Filter air box,
|
Details
|
|
|
12-30-2013
|
5.00
|
Cowl/baffle, firewhall shields
|
Details
|
|
|
12-29-2013
|
4.50
|
Top cowl/plenum baffles, baffle pin retention
|
Details
|
|
|
12-28-2013
|
4.00
|
Plenum
|
Details
|
|
|
12-27-2013
|
3.00
|
Cowl/baffle strips. Seats from Flightline arrived
|
Details
|
|
|
12-26-2013
|
3.00
|
Cowling lower inlet baffle material
|
Details
|
|
|
12-23-2013
|
4.00
|
Seal baffles, rear seat well carpet
|
Details
|
|
|
12-22-2013
|
4.00
|
Light Speed, plug wires and baffles
|
Details
|
|
|
12-21-2013
|
4.00
|
Light Speed Ignition
|
Details
|
|
|
12-20-2013
|
4.00
|
Light Speed ignition
|
Details
|
|
|
12-19-2013
|
4.00
|
Baffles, air hoses, governor, etc.
|
Details
|
|
|
12-18-2013
|
4.50
|
Baffle detail out
|
Details
|
|
|
12-17-2013
|
5.00
|
Hinges on plenum, install bafffles, torque prop
|
Details
|
|
|
12-16-2013
|
4.00
|
Paint baffles and plenum
|
Details
|
|
|
12-15-2013
|
3.50
|
Plenum, baffles, top cowl oil door
|
Details
|
|
|
12-14-2013
|
1.50
|
Plenum, baffles
|
Details
|
|
|
12-13-2013
|
2.00
|
Plenum,
|
Details
|
|
|
12-12-2013
|
3.00
|
Spinner, complete
|
Details
|
|
|
12-11-2013
|
4.50
|
Exhaust, cabin heat, fuel lines and spinner
|
Details
|
|
|
12-10-2013
|
4.00
|
Exhaust system
|
Details
|
|
|
12-09-2013
|
4.00
|
Strap down wires
|
Details
|
|
|
12-08-2013
|
5.00
|
Rt. side EGT, CHT, Mag, alternator and oil temp wi
|
Details
|
|
|
12-07-2013
|
4.00
|
Hootk EGT, CHTs.
|
Details
|
|
|
12-06-2013
|
4.00
|
Exhaust system right side, EGT, CHT and other wire
|
Details
|
|
|
12-05-2013
|
4.50
|
EGT, CHT probes, left side exhaust, wire runs
|
Details
|
|
|
12-04-2013
|
5.00
|
Wire run brackets, Light Speed pickup, starter cab
|
Details
|
|
|
12-03-2013
|
3.50
|
Oil door, electrical supports
|
Details
|
|
|
12-02-2013
|
4.00
|
Seats, fix Skyview radio mount, cowl
|
Details
|
|
|
12-01-2013
|
5.00
|
Plenum finish, seats, seat rail support
|
Details
|
|
|
11-30-2013
|
4.00
|
Plenum prep, misc
|
Details
|
|
|
11-29-2013
|
4.00
|
Plenum oil filler, mounts and fill CF
|
Details
|
|
|
11-28-2013
|
3.50
|
Plenum oil filler isolator, air filter
|
Details
|
|
|
11-27-2013
|
4.50
|
Plenum oil access, cowl oil door
|
Details
|
|
|
11-26-2013
|
4.00
|
Plenum hinges
|
Details
|
|
|
11-25-2013
|
3.50
|
Plenum side hinges
|
Details
|
|
|
11-24-2013
|
4.00
|
Plenum, trim, clean up. Start plenum mount
|
Details
|
|
|
11-23-2013
|
5.00
|
Plenum, redo front
|
Details
|
|
|
11-22-2013
|
4.00
|
Plenum, pull and start trimming
|
Details
|
|
|
11-21-2013
|
4.00
|
Lay up plenum, wires FWF
|
Details
|
|
|
11-20-2013
|
4.00
|
Plenum, exhaust system EGT
|
Details
|
|
|
11-19-2013
|
5.00
|
Hoses, EGTs, plenum
|
Details
|
|
|
11-18-2013
|
4.50
|
Engine controls, plumbing
|
Details
|
|
|
11-17-2013
|
4.00
|
Bottom cowl fit fix, baffle tension rods controls
|
Details
|
|
|
11-16-2013
|
3.50
|
Lower cowl
|
Details
|
|
|
11-15-2013
|
3.00
|
Bottom cowl
|
Details
|
|
|
11-14-2013
|
5.00
|
Baffles
|
Details
|
|
|
11-13-2013
|
4.00
|
Air filter, baffles
|
Details
|
|
|
11-12-2013
|
4.50
|
Baffles, preliminary trim
|
Details
|
|
|
11-11-2013
|
5.00
|
Front baffles
|
Details
|
|
|
11-10-2013
|
3.50
|
Front baffles
|
Details
|
|
|
11-09-2013
|
1.00
|
Air intake trim, front baffles
|
Details
|
|
|
11-08-2013
|
5.00
|
Front baffles again
|
Details
|
|
|
11-07-2013
|
3.00
|
Baffle, rear and intake fiberglass
|
Details
|
|
|
11-06-2013
|
5.00
|
Air box, inlet
|
Details
|
|
|
11-05-2013
|
26.00
|
Catch up, baffles, air box
|
Details
|
|
|
10-29-2013
|
2.00
|
Front baflels
|
Details
|
|
|
10-28-2013
|
1.50
|
Aerosport pin covers
|
Details
|
|
|
10-27-2013
|
4.50
|
Cowling, top side hinges, Aerosport pin cover
|
Details
|
|
|
10-26-2013
|
3.50
|
Cowling side hinges
|
Details
|
|
|
10-14-2013
|
4.50
|
Cowl installation
|
Details
|
|
|
10-13-2013
|
10.00
|
Cowl bottom, trim sides
|
Details
|
|
|
10-12-2013
|
3.50
|
Top cowl
|
Details
|
|
|
10-11-2013
|
2.00
|
Prop
|
Details
|
|
|
10-10-2013
|
1.00
|
Light Speed pickup adjust
|
Details
|
|
|
10-09-2013
|
3.00
|
Cowl, Light Speed plugs
|
Details
|
|
|
10-08-2013
|
4.00
|
Alternator, cowl trim
|
Details
|
|
|
10-07-2013
|
4.50
|
Spinner
|
Details
|
|
|
10-06-2013
|
3.50
|
Front baffles, Light Speed pickup
|
Details
|
|
|
10-05-2013
|
3.00
|
Front baffles
|
Details
|
|
|
09-30-2013
|
4.50
|
Baffles
|
Details
|
|
|
09-29-2013
|
4.50
|
Alternator, LIghtspeed, baffels
|
Details
|
|
|
09-28-2013
|
5.00
|
Hang engine, put on th ings
|
Details
|
|
|
09-27-2013
|
5.00
|
Go get engine, prop and motor mounts
|
Details
|
|
|
09-26-2013
|
5.00
|
Dynon Radio, prop spinner, no engine
|
Details
|
|
|
09-25-2013
|
4.50
|
Cowl mounts, ELT, Dynon radio
|
Details
|
|
|
09-24-2013
|
4.00
|
Skybolt brackets
|
Details
|
|
|
09-23-2013
|
1.00
|
Skybolt mounts
|
Details
|
|
|
09-22-2013
|
4.00
|
Cowl mount hinges, skybolt
|
Details
|
|
|
09-21-2013
|
4.00
|
Fairings complete
|
Details
|
|
|
09-20-2013
|
3.00
|
Wheel fairings
|
Details
|
|
|
09-19-2013
|
3.00
|
Nose fairing
|
Details
|
|
|
09-18-2013
|
4.00
|
fairings, nose fairing
|
Details
|
|
|
09-17-2013
|
5.00
|
Wheel fairings, nose gear fairing
|
Details
|
|
|
09-16-2013
|
3.00
|
Wheel farings
|
Details
|
|
|
09-15-2013
|
5.00
|
Wheel fairings
|
Details
|
|
|
09-14-2013
|
1.50
|
FAiorings
|
Details
|
|
|
09-13-2013
|
3.50
|
Gear fairings
|
Details
|
|
|
09-12-2013
|
3.50
|
Wheel and strut fairings
|
Details
|
|
|
09-11-2013
|
5.00
|
Wheelpants
|
Details
|
|
|
09-10-2013
|
4.00
|
Landing gear fairings
|
Details
|
|
|
09-09-2013
|
3.50
|
Brakes and brake lines
|
Details
|
|
|
09-08-2013
|
5.00
|
On its feet, landing gear
|
Details
|
|
|
09-07-2013
|
4.50
|
ELT mount and wire
|
Details
|
|
|
09-06-2013
|
4.00
|
Landing gear prep, ELT
|
Details
|
|
|
09-05-2013
|
45.00
|
Landing gear, wheels
|
Details
|
|
|
09-04-2013
|
4.00
|
Motor mount, fuel lines, wheels
|
Details
|
|
|
09-03-2013
|
4.50
|
Finish wire pressures sensors, throttle, mix and p
|
Details
|
|
|
09-02-2013
|
3.60
|
Fix windows, engine instruments
|
Details
|
|
|
09-01-2013
|
4.00
|
Uncover windows, door seal, Zolatone touch up
|
Details
|
|
|
08-31-2013
|
5.00
|
Primer over all
|
Details
|
|
|
08-30-2013
|
5.00
|
Sand epoxy, prep for epoxy
|
Details
|
|
|
08-29-2013
|
5.00
|
Sand cabin top, epoxy
|
Details
|
|
|
08-27-2013
|
5.00
|
Fill and sand cabin top
|
Details
|
|
|
08-26-2013
|
4.00
|
Sand cabin top, fill resin
|
Details
|
|
|
08-25-2013
|
3.50
|
Filler at door/cabin interface
|
Details
|
|
|
08-24-2013
|
4.00
|
Fill cabin/door, Lightspeed ignition, oil & fuel P
|
Details
|
|
|
08-23-2013
|
4.50
|
SAnding, fitting doors (again)
|
Details
|
|
|
08-22-2013
|
4.00
|
Pick up prop, glass ar0und cabin top
|
Details
|
|
|
08-15-2013
|
3.50
|
Sand glass, cleanup
|
Details
|
|
|
08-14-2013
|
4.00
|
Fiberglass cabin top/skin joints
|
Details
|
|
|
08-13-2013
|
5.00
|
Rivet top skin, vent controls, door alarms
|
Details
|
|
|
08-12-2013
|
4.50
|
Windshield fairing, firewall forward kit, vent con
|
Details
|
|
|
08-11-2013
|
3.00
|
Filler on windshield fairing, door switches
|
Details
|
|
|
08-10-2013
|
2.00
|
Tour, left door, sand fairing some
|
Details
|
|
|
08-09-2013
|
4.00
|
Windshield fairng
|
Details
|
|
|
08-08-2013
|
4.00
|
Glue windshield, epoxy edge of windshield
|
Details
|
|
|
08-07-2013
|
4.50
|
Front windshield, edge trim, inst. lights
|
Details
|
|
|
08-06-2013
|
5.00
|
Detail out battery area, put on rear skin for rive
|
Details
|
|
|
08-05-2013
|
4.00
|
Reinstall panel, ADHARS OAT probes, brace
|
Details
|
|
|
08-04-2013
|
4.00
|
Wire GPS, reinstall hub
|
Details
|
|
|
08-03-2013
|
4.00
|
Front cabin brace, GPS receiver and wiring
|
Details
|
|
|
08-02-2013
|
3.00
|
Ultrasuade glare shield, rear skin
|
Details
|
|
|
08-01-2013
|
4.50
|
Windshield trim, glare shield
|
Details
|
|
|
07-31-2013
|
5.00
|
Reassemble left door, windshield
|
Details
|
|
|
07-30-2013
|
4.50
|
Bolt and flox cabin top
|
Details
|
|
|
07-29-2013
|
4.00
|
Insulation, rivet top cover
|
Details
|
|
|
07-28-2013
|
4.50
|
Rug templaes, cabin top
|
Details
|
|
|
07-27-2013
|
3.50
|
Put in interior, rug patterns
|
Details
|
|
|
07-26-2013
|
4.00
|
Paint interior with Zolatone
|
Details
|
|
|
07-25-2013
|
6.00
|
Prep interior for Zolatone, prime
|
Details
|
|
|
07-23-2013
|
4.50
|
Zoalatone interior parts, start masking fues.
|
Details
|
|
|
07-22-2013
|
5.00
|
Primer parts for Zolatone
|
Details
|
|
|
07-21-2013
|
3.50
|
Paint interior cabin and doors
|
Details
|
|
|
07-20-2013
|
3.50
|
Mask cabin top and doors, prime
|
Details
|
|
|
07-19-2013
|
4.50
|
Zolatone and Urethane
|
Details
|
|
|
07-18-2013
|
5.00
|
Zolatone, rivet forward skin
|
Details
|
|
|
07-16-2013
|
4.00
|
More minor details inside
|
Details
|
|
|
07-15-2013
|
2.00
|
Get interior paint ordered, set up for rivet
|
Details
|
|
|
07-14-2013
|
4.00
|
Build supports for rivet bucker, cleco front skin
|
Details
|
|
|
07-13-2013
|
4.00
|
Nutplates for Aersport interior
|
Details
|
|
|
07-11-2013
|
2.50
|
Rear seat vents
|
Details
|
|
|
07-10-2013
|
4.00
|
Aerosport interior panels
|
Details
|
|
|
07-09-2013
|
2.50
|
Fitting Aerosport interion panels
|
Details
|
|
|
07-08-2013
|
4.50
|
Sand window frames, front sheet metal
|
Details
|
|
|
07-07-2013
|
6.00
|
Sand window fiberglass trim, fill
|
Details
|
|
|
07-06-2013
|
6.00
|
Fiberglass around windows
|
Details
|
|
|
07-01-2013
|
3.50
|
Glue in door windows
|
Details
|
|
|
06-30-2013
|
2.00
|
Rear window fiberglass prep, left door window
|
Details
|
|
|
06-29-2013
|
1.50
|
Strip tape and plan next steps
|
Details
|
|
|
06-28-2013
|
3.50
|
Glue in rear windows!
|
Details
|
|
|
06-27-2013
|
4.00
|
Prep rear windows, left door, hinge nutplates
|
Details
|
|
|
06-26-2013
|
4.00
|
Trim windows, test caulk method, set up window
|
Details
|
|
|
06-25-2013
|
3.00
|
Sand, fill, door mechanism cover, Aerosport interi
|
Details
|
|
|
06-24-2013
|
4.00
|
Cabin cover fill, door remove hardware, hinge pock
|
Details
|
|
|
06-23-2013
|
4.00
|
Filler, sand doors, filler, door strut bracket
|
Details
|
|
|
06-22-2013
|
3.50
|
Door hinge area, filler top
|
Details
|
|
|
06-21-2013
|
2.00
|
Filler
|
Details
|
|
|
06-20-2013
|
4.00
|
Fill cabin top, vents in console and glue
|
Details
|
|
|
06-19-2013
|
4.50
|
Sand and fill cabin top, sand overhead console
|
Details
|
|
|
06-18-2013
|
4.00
|
Cabin top prep, doors
|
Details
|
|
|
06-16-2013
|
4.50
|
Clean up, cabin windows
|
Details
|
|
|
06-15-2013
|
4.00
|
Last of the avionics for a time
|
Details
|
|
|
06-14-2013
|
3.00
|
Rivet vents, OAT probes, replace molex
|
Details
|
|
|
06-13-2013
|
3.50
|
Cut rear vents, glue in vents, insulation
|
Details
|
|
|
06-12-2013
|
2.50
|
Firewall cable penetration, insulation, rear NAC
|
Details
|
|
|
06-11-2013
|
3.50
|
Wing root wire, tiops, firewall penetration, vents
|
Details
|
|
|
06-10-2013
|
4.00
|
Csk mount holes in wingtip, wire wingtips, rt. win
|
Details
|
|
|
06-09-2013
|
2.00
|
Dimpled wingtip attach holes, tied wire down
|
Details
|
|
|
06-08-2013
|
4.00
|
Aileron trim, pitot heat
|
Details
|
|
|
06-06-2013
|
4.00
|
Heated Pitot
|
Details
|
|
|
06-05-2013
|
4.00
|
Wingtip, strobe/taxi light wires
|
Details
|
|
|
06-04-2013
|
1.50
|
Drill for tip lights, misc.
|
Details
|
|
|
06-03-2013
|
4.50
|
Wire Light Speed, fan, lace
|
Details
|
|
|
06-02-2013
|
3.00
|
EMS extra thermocouples, wire add, Light Speed
|
Details
|
|
|
06-01-2013
|
5.50
|
Mount Light Speed, cooling fan, wire holes
|
Details
|
|
|
05-30-2013
|
4.50
|
Wing tips, aileron servo wire/mount etc.
|
Details
|
|
|
05-29-2013
|
3.50
|
Wingtip run/taxi lights, wires
|
Details
|
|
|
05-28-2013
|
4.50
|
Wingtips
|
Details
|
|
|
05-26-2013
|
3.50
|
Motor mount, MM/fues ground, oil cooler mount
|
Details
|
|
|
05-25-2013
|
6.00
|
Firewall insulation, motor mount
|
Details
|
|
|
05-23-2013
|
3.50
|
Cables, tailcone wires, battery area, firewall ins
|
Details
|
|
|
05-22-2013
|
4.00
|
Wiring near complete, glove box door
|
Details
|
|
|
05-21-2013
|
3.00
|
Cables and clamps
|
Details
|
|
|
05-19-2013
|
5.00
|
Lacing wire, brackets and cable supports
|
Details
|
|
|
05-18-2013
|
4.50
|
Lacing wire, flap drive, EMS wires, Skyview Conn.
|
Details
|
|
|
05-17-2013
|
5.00
|
Lacing wire, cable clamps
|
Details
|
|
|
05-16-2013
|
3.00
|
Lacing wires, ground buss, flap actuator
|
Details
|
|
|
05-15-2013
|
4.00
|
Tunnel, console and lacing wire
|
Details
|
|
|
05-14-2013
|
4.50
|
Final wires, tie wires, test, cig. lighter plug
|
Details
|
|
|
05-11-2013
|
2.00
|
Testing , wires for PAR00EX entertainment
|
Details
|
|
|
05-10-2013
|
2.50
|
Last wires??, testing
|
Details
|
|
|
05-09-2013
|
4.00
|
Testing list, alt air SV, Light Speed Ignition
|
Details
|
|
|
05-08-2013
|
4.50
|
Com Antenna, testing ... main battery
|
Details
|
|
|
05-07-2013
|
3.00
|
Antenna doublers, antenna wire
|
Details
|
|
|
05-06-2013
|
3.50
|
Transponder and ADSB
|
Details
|
|
|
05-05-2013
|
3.50
|
Turn on the TVs!
|
Details
|
|
|
05-04-2013
|
3.00
|
Main wire cables, build and test
|
Details
|
|
|
05-03-2013
|
2.50
|
Panel wires/plug, firewall forward power wires, ma
|
Details
|
|
|
05-02-2013
|
4.00
|
Front panel jack, radio cut-out and wire panel
|
Details
|
|
|
05-01-2013
|
3.00
|
Rt. under seat terminal board wire
|
Details
|
|
|
04-30-2013
|
4.50
|
Mount termainal boards/stick connectors, wire trim
|
Details
|
|
|
04-29-2013
|
2.00
|
Left side wires to wing
|
Details
|
|
|
04-28-2013
|
2.50
|
AP servo/strobe/run light wires to wing
|
Details
|
|
|
04-27-2013
|
5.00
|
Complete tunnel, holes for TC wires and others, mi
|
Details
|
|
|
04-26-2013
|
4.00
|
Modify center tunnel cover, mount console
|
Details
|
|
|
04-25-2013
|
3.00
|
Center console, mount pilot and passenger jacks
|
Details
|
|
|
04-24-2013
|
4.00
|
Tie down wire in tunnel, built pilot/copilot jack
|
Details
|
|
|
04-23-2013
|
4.00
|
Flap position indicator, wires in tunnel, EMS wire
|
Details
|
|
|
04-22-2013
|
4.50
|
PAR100EX radio wire, flaps, clamps, misc.
|
Details
|
|
|
04-21-2013
|
5.00
|
PAR cables, Dynon Radio cables, misc wires
|
Details
|
|
|
04-20-2013
|
4.50
|
Re-do intercom harness
|
Details
|
|
|
04-19-2013
|
3.50
|
PAR100EX wiring
|
Details
|
|
|
04-18-2013
|
5.00
|
Glove box, Alt air SV, PAR100EX cable
|
Details
|
|
|
04-16-2013
|
4.50
|
Mechanical work, flaps, rivet
|
Details
|
|
|
04-15-2013
|
3.50
|
Pull wires, flap system
|
Details
|
|
|
04-14-2013
|
3.50
|
EMS gnd/pwr distribution buss
|
Details
|
|
|
04-12-2013
|
4.50
|
Wired door alert, misc pwr termninal board, order
|
Details
|
|
|
04-11-2013
|
3.50
|
Clean-up, Instrument lights
|
Details
|
|
|
04-10-2013
|
4.00
|
Strobe/run lts wire, wing connections, AOA, pitot
|
Details
|
|
|
04-09-2013
|
3.00
|
Wigwag circuit, glove box, wires
|
Details
|
|
|
04-08-2013
|
3.50
|
Move trans and ADSB rec, remove cabin top
|
Details
|
|
|
04-07-2013
|
3.50
|
Design Skyview cable lengths, build cables
|
Details
|
|
|
04-06-2013
|
4.00
|
Transceiver mount, pull out and in #2 cable, test
|
Details
|
|
|
04-05-2013
|
1.50
|
Transceiver mount
|
Details
|
|
|
04-04-2013
|
3.00
|
Radio trays, Skyview Hub
|
Details
|
|
|
04-03-2013
|
4.00
|
ADHARS and elev servo wire
|
Details
|
|
|
04-01-2013
|
3.00
|
Correct schematics, elevator trim, tail light/stro
|
Details
|
|
|
03-31-2013
|
3.00
|
Wiring switches
|
Details
|
|
|
03-29-2013
|
2.00
|
Finish fuse panel wire, one Dsub
|
Details
|
|
|
03-28-2013
|
5.00
|
Power circuits and fuse panels
|
Details
|
|
|
03-27-2013
|
4.00
|
Main battery lead and master
|
Details
|
|
|
03-26-2013
|
3.50
|
Bit of wire and insulation
|
Details
|
|
|
03-25-2013
|
4.50
|
Mount flap control, ADSB, Trans and T.B
|
Details
|
|
|
03-24-2013
|
4.50
|
Antenna, mount trnasponder and ADSB rec.
|
Details
|
|
|
03-22-2013
|
4.50
|
Rivet forward upper fues, switches, wire design
|
Details
|
|
|
03-21-2013
|
3.00
|
Paint panel again, upper fues rivet
|
Details
|
|
|
03-20-2013
|
3.50
|
Paint panel, wire ampmeter, gen. fues link.
|
Details
|
|
|
03-19-2013
|
4.00
|
Prime panel, disassy, mount amp and fues link
|
Details
|
|
|
03-18-2013
|
4.00
|
Mounting things
|
Details
|
|
|
03-17-2013
|
4.00
|
Mount system hub, Skyview hub, ADHARS
|
Details
|
|
|
03-16-2013
|
4.00
|
Mounting things
|
Details
|
|
|
03-15-2013
|
2.50
|
Glove box, ADHARS mount, misc
|
Details
|
|
|
03-14-2013
|
0.00
|
Glider annual
|
Details
|
|
|
03-11-2013
|
4.50
|
Sub bulkhead brace, PC board
|
Details
|
|
|
03-10-2013
|
4.50
|
Front panel radio frame
|
Details
|
|
|
03-09-2013
|
0.50
|
Fuse doors, radio stack
|
Details
|
|
|
03-08-2013
|
4.00
|
Fuse panel, front panel
|
Details
|
|
|
03-07-2013
|
4.50
|
Fuse panel
|
Details
|
|
|
03-06-2013
|
4.50
|
Fuse doors, DYNON!
|
Details
|
|
|
03-05-2013
|
1.00
|
Fuse doors in panel
|
Details
|
|
|
03-04-2013
|
4.50
|
Cut out Instrument Panel
|
Details
|
|
|
03-03-2013
|
4.00
|
Panel design, layout and details
|
Details
|
|
|
03-02-2013
|
2.50
|
Panel layout
|
Details
|
|
|
03-01-2013
|
3.50
|
#2 wire, master, starter relays, Inst panel
|
Details
|
|
|
02-28-2013
|
4.00
|
Left door, struts, clean-up
|
Details
|
|
|
02-27-2013
|
4.50
|
Avionics, doors
|
Details
|
|
|
02-25-2013
|
4.00
|
Schematics
|
Details
|
|
|
02-24-2013
|
3.00
|
Schematics
|
Details
|
|
|
02-23-2013
|
2.00
|
Wire schematics
|
Details
|
|
|
02-22-2013
|
4.00
|
Design and order
|
Details
|
|
|
02-21-2013
|
4.00
|
Hub design, controls, wiring schematics
|
Details
|
|
|
02-20-2013
|
3.50
|
|
Details
|
|
|
02-19-2013
|
4.00
|
Schematics, shop and #2 wire
|
Details
|
|
|
02-17-2013
|
2.50
|
Pilot and co stick wire
|
Details
|
|
|
02-16-2013
|
3.50
|
Ray Allen stick grips, overhead
|
Details
|
|
|
02-15-2013
|
4.00
|
Nutplates, lights, vents
|
Details
|
|
|
02-14-2013
|
3.00
|
Prepare for nutplates
|
Details
|
|
|
02-13-2013
|
4.50
|
Seal area shaped, overhead console
|
Details
|
|
|
02-12-2013
|
4.00
|
Sand and fill seal
|
Details
|
|
|
02-11-2013
|
3.00
|
Work on seal mount
|
Details
|
|
|
02-10-2013
|
3.00
|
What else, doors, set seal gap
|
Details
|
|
|
02-09-2013
|
2.00
|
More glass buildup
|
Details
|
|
|
02-08-2013
|
2.50
|
Doors, buildup gutters
|
Details
|
|
|
02-07-2013
|
4.00
|
Doors, doors, doors ....
|
Details
|
|
|
02-06-2013
|
4.00
|
Fit right door, sand left gutter down, glass
|
Details
|
|
|
02-05-2013
|
2.50
|
Hang right door, sand left to fit again
|
Details
|
|
|
02-04-2013
|
4.00
|
Lock, hang right door
|
Details
|
|
|
02-03-2013
|
3.50
|
Right door/ locks
|
Details
|
|
|
02-02-2013
|
2.50
|
Right door latch
|
Details
|
|
|
02-01-2013
|
2.50
|
Lock, start right door
|
Details
|
|
|
01-31-2013
|
4.50
|
Left door, almost complete
|
Details
|
|
|
01-30-2013
|
4.00
|
Assemble door system
|
Details
|
|
|
01-29-2013
|
3.00
|
Hinge right door, start on latches
|
Details
|
|
|
01-28-2013
|
2.50
|
Right door, fit start hinges
|
Details
|
|
|
01-27-2013
|
0.50
|
Catch-up day
|
Details
|
|
|
01-26-2013
|
4.00
|
Hinge left door
|
Details
|
|
|
01-25-2013
|
4.50
|
Left door, fit
|
Details
|
|
|
01-24-2013
|
3.50
|
Trim right door
|
Details
|
|
|
01-23-2013
|
4.00
|
Trim left door, remove right
|
Details
|
|
|
01-22-2013
|
4.00
|
Glue rt. door, latches, trim left
|
Details
|
|
|
01-21-2013
|
4.50
|
Glue up left door, door handles
|
Details
|
|
|
01-20-2013
|
4.00
|
Wingtip, fues doors prep
|
Details
|
|
|
01-19-2013
|
3.00
|
Door strut reinforcement, door latch, wingtip
|
Details
|
|
|
01-18-2013
|
3.50
|
Fit doors, door latch
|
Details
|
|
|
01-17-2013
|
4.00
|
Trim cabin top, fit doors
|
Details
|
|
|
01-16-2013
|
1.50
|
Trim glass
|
Details
|
|
|
01-15-2013
|
2.50
|
Study and decision time
|
Details
|
|
|
01-14-2013
|
4.00
|
Pick up finishing kit
|
Details
|
|
|
01-13-2013
|
3.00
|
Aerosport air inlets, set up shop
|
Details
|
|
|
01-12-2013
|
2.00
|
Aersport overhead
|
Details
|
|
|
01-11-2013
|
4.50
|
Finish rudder, static sys., overhead vent
|
Details
|
|
|
01-10-2013
|
4.00
|
Rudder tip, bottom, fues platform
|
Details
|
|
|
01-09-2013
|
4.00
|
Finish stab/elevator fiberglass, rudder glass
|
Details
|
|
|
01-08-2013
|
2.50
|
Stab and elevator tips
|
Details
|
|
|
01-07-2013
|
2.00
|
Stab tips, sand and glass
|
Details
|
|
|
01-06-2013
|
3.50
|
Elevator tips
|
Details
|
|
|
01-05-2013
|
3.50
|
Design Avionics MIxer
|
Details
|
|
|
01-04-2013
|
2.00
|
Satb/elevator tips
|
Details
|
|
|
01-03-2013
|
3.50
|
Elevator fiberglass
|
Details
|
|
|
01-02-2013
|
3.00
|
Tail fiberglass
|
Details
|
|
|
01-01-2013
|
4.00
|
Wingtips
|
Details
|
|
|
12-31-2012
|
3.00
|
Wingtips
|
Details
|
|
|
12-30-2012
|
3.00
|
Left wingtip, make it work
|
Details
|
|
|
12-29-2012
|
1.50
|
Wingtips
|
Details
|
|
|
12-28-2012
|
3.50
|
Cover plates
|
Details
|
|
|
12-27-2012
|
4.00
|
Left aileron actuation, wires and tubes
|
Details
|
|
|
12-24-2012
|
4.00
|
Aileron actuation
|
Details
|
|
|
12-23-2012
|
4.00
|
Pushrods and aileron drivers
|
Details
|
|
|
12-22-2012
|
5.00
|
Nutplates, pushrods
|
Details
|
|
|
12-21-2012
|
4.00
|
Left wing bottom skin
|
Details
|
|
|
12-20-2012
|
4.50
|
Finish left bottom, start right bottom skin
|
Details
|
|
|
12-19-2012
|
3.50
|
Rivet (and dent) bottom wing skin
|
Details
|
|
|
12-18-2012
|
4.50
|
Dimple left wing, rivet ail/flap fairings
|
Details
|
|
|
12-17-2012
|
4.50
|
Debur, dimple, edge, day 2
|
Details
|
|
|
12-16-2012
|
4.50
|
Edge, debur and dimple, day 1
|
Details
|
|
|
12-15-2012
|
4.00
|
Drill wing skins
|
Details
|
|
|
12-14-2012
|
4.00
|
Aileron trim, wire holes
|
Details
|
|
|
12-13-2012
|
2.50
|
Set up and start
|
Details
|
|
|
11-20-2012
|
1.50
|
Clean up cabin top, install temp.
|
Details
|
|
|
11-19-2012
|
4.00
|
Canopy cover backup strips
|
Details
|
|
|
11-18-2012
|
3.50
|
Drilled out canopy cover, trim more
|
Details
|
|
|
11-17-2012
|
4.00
|
Cabin cover off, on, drill holes
|
Details
|
|
|
11-16-2012
|
4.00
|
Cabin top off and on
|
Details
|
|
|
11-15-2012
|
4.00
|
Trin cabin cover
|
Details
|
|
|
11-14-2012
|
2.00
|
Cabin Cover
|
Details
|
|
|
11-13-2012
|
1.50
|
Cabin top
|
Details
|
|
|
11-12-2012
|
4.00
|
Rear seats
|
Details
|
|
|
11-11-2012
|
3.00
|
Flap system and rear seats
|
Details
|
|
|
11-10-2012
|
2.00
|
Flap drive
|
Details
|
|
|
11-09-2012
|
4.50
|
Brake lines, pushrods, flap drive
|
Details
|
|
|
11-08-2012
|
4.50
|
Install rudder pedals, cable
|
Details
|
|
|
11-07-2012
|
3.00
|
Stick and misc.
|
Details
|
|
|
11-06-2012
|
4.00
|
Controls, pushrods, sticks
|
Details
|
|
|
11-05-2012
|
2.50
|
Rudder cable
|
Details
|
|
|
11-04-2012
|
5.00
|
Rudder pedals and assembly
|
Details
|
|
|
11-03-2012
|
2.00
|
Fuel system, rudder pedals
|
Details
|
|
|
11-02-2012
|
5.50
|
Temp floors, plumbing
|
Details
|
|
|
11-01-2012
|
3.50
|
Interior panels, plumbing
|
Details
|
|
|
10-31-2012
|
5.00
|
Interior panels and covers
|
Details
|
|
|
10-30-2012
|
3.50
|
Passenger floor and seat area
|
Details
|
|
|
10-29-2012
|
3.50
|
Passenger floor boards
|
Details
|
|
|
10-17-2012
|
3.00
|
Baggage door, passenger floor
|
Details
|
|
|
10-16-2012
|
4.00
|
Baggage door, hang door
|
Details
|
|
|
10-15-2012
|
4.00
|
Baggage area and door
|
Details
|
|
|
10-14-2012
|
3.00
|
Baggage area nutplates.
|
Details
|
|
|
10-13-2012
|
3.50
|
Baggage area and closeout
|
Details
|
|
|
10-12-2012
|
4.00
|
Conduit, baggage floor
|
Details
|
|
|
10-11-2012
|
4.50
|
Insulation, conduit
|
Details
|
|
|
10-10-2012
|
4.00
|
Debur, dimple, nutplates, design
|
Details
|
|
|
10-09-2012
|
5.00
|
Access ports in baggage area
|
Details
|
|
|
10-08-2012
|
5.50
|
Baggage area. foors, frame
|
Details
|
|
|
10-07-2012
|
5.00
|
Rivet together sections
|
Details
|
|
|
10-06-2012
|
5.50
|
Complete dimple, reassy front and rear fues
|
Details
|
|
|
10-05-2012
|
4.50
|
Drilling fues join, debur
|
Details
|
|
|
10-04-2012
|
6.00
|
Forward skin, the big join
|
Details
|
|
|
10-03-2012
|
4.00
|
Inst. panel, forward skins
|
Details
|
|
|
10-02-2012
|
5.50
|
Front top skin, instrument panel
|
Details
|
|
|
10-01-2012
|
5.50
|
Finish all side section, steps, instrument panel a
|
Details
|
|
|
09-30-2012
|
6.00
|
Floor, L.G mounts and rivet
|
Details
|
|
|
09-30-2012
|
6.00
|
Floor, L.G mounts and rivet
|
Details
|
|
|
09-29-2012
|
4.00
|
Floor boards and landing gear mount
|
Details
|
|
|
09-28-2012
|
2.50
|
Rivet floorboard
|
Details
|
|
|
09-27-2012
|
5.00
|
Rivet, insulation, fire proofing, floorboards.
|
Details
|
|
|
09-25-2012
|
5.00
|
Front bottom rivets
|
Details
|
|
|
09-24-2012
|
2.50
|
Left rear skin
|
Details
|
|
|
09-23-2012
|
1.50
|
Rivet rear skin
|
Details
|
|
|
09-22-2012
|
0.50
|
Right rear skin, rivet
|
Details
|
|
|
09-21-2012
|
1.50
|
Rivet right rear
|
Details
|
|
|
09-20-2012
|
4.50
|
Skins on and start rivet
|
Details
|
|
|
09-19-2012
|
3.50
|
Substructure and prep
|
Details
|
|
|
09-18-2012
|
5.00
|
Dimple skins, assemble
|
Details
|
|
|
09-17-2012
|
4.50
|
Plumbing, insulation and skins
|
Details
|
|
|
09-14-2012
|
4.00
|
Insulation and step mount
|
Details
|
|
|
09-13-2012
|
5.00
|
Plumbing and Insulation
|
Details
|
|
|
09-12-2012
|
4.50
|
Tubing, brake and fuel
|
Details
|
|
|
09-11-2012
|
4.00
|
|
Details
|
|
|
09-10-2012
|
4.50
|
Debur, csk and dimple
|
Details
|
|
|
09-09-2012
|
5.50
|
|
Details
|
|
|
09-08-2012
|
1.00
|
Debur, etc
|
Details
|
|
|
09-07-2012
|
5.00
|
Drill out structrue
|
Details
|
|
|
09-06-2012
|
4.50
|
Drill side skins
|
Details
|
|
|
09-05-2012
|
4.50
|
Forward skins, bend and cleco
|
Details
|
|
|
09-04-2012
|
0.50
|
Minor things
|
Details
|
|
|
09-03-2012
|
2.00
|
Right side rear skin
|
Details
|
|
|
09-02-2012
|
1.50
|
Rear skin drill
|
Details
|
|
|
09-01-2012
|
5.00
|
Rear skins
|
Details
|
|
|
08-31-2012
|
1.50
|
Rear sking
|
Details
|
|
|
08-30-2012
|
5.00
|
Rolling rear skin
|
Details
|
|
|
08-29-2012
|
6.00
|
Longerons!
|
Details
|
|
|
08-28-2012
|
6.00
|
Gear mount and finish section
|
Details
|
|
|
08-27-2012
|
5.00
|
Rivet front and mid sections, floor pans and assem
|
Details
|
|
|
08-26-2012
|
2.50
|
Set pans and seat rail support
|
Details
|
|
|
08-25-2012
|
6.00
|
Seat pans
|
Details
|
|
|
08-24-2012
|
3.00
|
Assemble front and rear bottom sections
|
Details
|
|
|
08-23-2012
|
2.00
|
|
Details
|
|
|
08-20-2012
|
3.00
|
Dimple skin, rivet
|
Details
|
|
|
08-19-2012
|
6.00
|
Debur, edge and dimple
|
Details
|
|
|
08-18-2012
|
3.00
|
Drilling and start taking removing pieces.
|
Details
|
|
|
08-17-2012
|
4.00
|
Asseble front and mid sections
|
Details
|
|
|
08-16-2012
|
4.50
|
Rivet rear bottom, spacers for spar
|
Details
|
|
|
08-15-2012
|
2.50
|
Forward fues bottom, loaded rivets in rear section
|
Details
|
|
|
08-14-2012
|
1.00
|
Forward Section
|
Details
|
|
|
08-13-2012
|
3.00
|
Forward assembly, rivet rear part
|
Details
|
|
|
08-12-2012
|
3.00
|
Cleco together forward section
|
Details
|
|
|
08-11-2012
|
3.00
|
Assemble and drill frame
|
Details
|
|
|
08-10-2012
|
3.00
|
Building seat anchors
|
Details
|
|
|
08-08-2012
|
1.00
|
Finish firewall section
|
Details
|
|
|
08-07-2012
|
5.00
|
Firewall and fues center ribs
|
Details
|
|
|
08-06-2012
|
3.00
|
Riveting firewall and building ribs
|
Details
|
|
|
08-05-2012
|
3.00
|
Firewall, countersink and rivet start
|
Details
|
|
|
08-04-2012
|
3.00
|
Firewall dimple, deburr and csk.
|
Details
|
|
|
08-03-2012
|
3.00
|
Firewall assemble
|
Details
|
|
|
08-02-2012
|
4.00
|
Dimple and reassy
|
Details
|
|
|
08-01-2012
|
3.00
|
Debur and dimple
|
Details
|
|
|
07-31-2012
|
4.00
|
Aft bottom skins
|
Details
|
|
|
07-30-2012
|
4.50
|
Bottom Skins
|
Details
|
|
|
07-28-2012
|
4.00
|
Seat and bagage ribs
|
Details
|
|
|
07-27-2012
|
1.50
|
Riveting seat ribs
|
Details
|
|
|
07-26-2012
|
3.00
|
Rest seat ribs
|
Details
|
|
|
07-25-2012
|
6.00
|
Start assembly
|
Details
|
|
|
07-24-2012
|
5.00
|
Forward spar bulkhead
|
Details
|
|
|
07-23-2012
|
3.00
|
Seat ribs
|
Details
|
|
|
07-22-2012
|
6.00
|
Bulkheads
|
Details
|
|
|
07-21-2012
|
4.00
|
Aft spar bulkhead
|
Details
|
|
|
07-20-2012
|
4.50
|
Main spar bulkheads
|
Details
|
|
|
07-19-2012
|
4.00
|
Organize Parts
|
Details
|
|
|
07-18-2012
|
5.00
|
COMPLETE! (except damn fiberglass)
|
Details
|
|
|
07-17-2012
|
5.00
|
Rudder, pushrod, trim and washers
|
Details
|
|
|
07-16-2012
|
4.15
|
Remount elev, fin, elevators
|
Details
|
|
|
07-15-2012
|
3.50
|
Elevator pivots, holes, mount stab
|
Details
|
|
|
07-14-2012
|
0.50
|
Elevator fit to stab
|
Details
|
|
|
07-13-2012
|
5.00
|
Trim system, elevator mount
|
Details
|
|
|
07-12-2012
|
4.00
|
Trim tabs completed, Start elevator trim sys.
|
Details
|
|
|
07-11-2012
|
5.50
|
Tailcone, COMPLETION!
|
Details
|
|
|
07-11-2012
|
5.50
|
COMPLETE! (except damn fiberglass)
|
Details
|
|
|
07-10-2012
|
4.00
|
Tailcone, conduit and top skins install and start
|
Details
|
|
|
07-09-2012
|
2.00
|
Tailcone, rivet tailplate
|
Details
|
|
|
07-08-2012
|
5.00
|
Tailcone, complete rivet side skins
|
Details
|
|
|
07-07-2012
|
1.50
|
Tailcone, riveting
|
Details
|
|
|
07-05-2012
|
1.00
|
Tailcone, rivet side
|
Details
|
|
|
07-04-2012
|
3.00
|
Tailcone, rivet other side
|
Details
|
|
|
07-03-2012
|
3.00
|
Tailcone, side stiffeners rivet
|
Details
|
|
|
07-02-2012
|
5.00
|
Tailcone Start assy, back rivet bottom
|
Details
|
|
|
06-30-2012
|
3.00
|
Tailcone, dimple
|
Details
|
|
|
06-29-2012
|
5.00
|
Tailcone, complete debur, built battery mount, bel
|
Details
|
|
|
06-28-2012
|
4.50
|
Tailcone, debur
|
Details
|
|
|
06-27-2012
|
3.50
|
Tailcone, belt anchors, Avery Statics, disassy all
|
Details
|
|
|
06-26-2012
|
6.50
|
Tialcone, top skins, tailplate drill
|
Details
|
|
|
06-25-2012
|
6.00
|
Tailcone, driling bottom stiffeners, sides, longer
|
Details
|
|
|
06-24-2012
|
5.00
|
Trim tabs, blue in ribs, Tailcone, longeron, assem
|
Details
|
|
|
06-23-2012
|
1.50
|
Trim tabs, rivet spar on bottom
|
Details
|
|
|
06-22-2012
|
6.00
|
Tailcone, drill out bulkheads, stiffeners cut
|
Details
|
|
|
06-21-2012
|
6.00
|
Elevator, completed left. Drill out, debur and di
|
Details
|
|
|
06-20-2012
|
0.00
|
Went Soaring
|
Details
|
|
|
06-19-2012
|
4.00
|
Elevator glued. Bending trim tabs
|
Details
|
|
|
06-18-2012
|
4.50
|
Elevators, complete right, rivet left
|
Details
|
|
|
06-17-2012
|
3.00
|
Elevator, debur and dimple left elevator
|
Details
|
|
|
06-16-2012
|
5.00
|
Elevator rivet and glue. Start trim tabs
|
Details
|
|
|
06-15-2012
|
6.00
|
Tailcone, cleaning up parts
|
Details
|
|
|
06-15-2012
|
3.00
|
Elevators, debur and dimple left
|
Details
|
|
|
06-14-2012
|
5.00
|
Elevators, rivet right, drill out left
|
Details
|
|
|
06-13-2012
|
5.50
|
Elevator, debur and dimple right
|
Details
|
|
|
06-12-2012
|
6.00
|
Elevator, drilled out right, debur
|
Details
|
|
|
06-11-2012
|
6.00
|
Elevators, start assembly and drilling
|
Details
|
|
|
06-10-2012
|
1.00
|
Elevator, detailing parts
|
Details
|
|
|
06-09-2012
|
2.00
|
Elev, cleaning up parts
|
Details
|
|
|
06-08-2012
|
4.00
|
Stab, completed riveting our
|
Details
|
|
|
06-07-2012
|
4.50
|
Stab, riveting skins, spar
|
Details
|
|
|
06-06-2012
|
1.20
|
Stab main spar install
|
Details
|
|
|
06-05-2012
|
4.50
|
Fin completed. Stab rivets
|
Details
|
|
|
06-04-2012
|
4.00
|
Rudder completion
|
Details
|
|
|
06-02-2012
|
1.00
|
Stab skin to spar rivets
|
Details
|
|
|
06-01-2012
|
1.50
|
Stab front ribs rivet
|
Details
|
|
|
05-31-2012
|
2.50
|
Stab rivet front spar, start ribs
|
Details
|
|
|
05-30-2012
|
4.00
|
Stab complete debur and dimple
|
Details
|
|
|
05-29-2012
|
2.50
|
Stab debur and dimple
|
Details
|
|
|
05-28-2012
|
1.50
|
Stab, debur
|
Details
|
|
|
05-27-2012
|
5.00
|
Rivet rudder, complete stab drilling
|
Details
|
|
|
05-26-2012
|
3.00
|
Stab drill skins fir front ribs
|
Details
|
|
|
05-25-2012
|
2.50
|
Stab drill skins
|
Details
|
|
|
05-24-2012
|
2.50
|
Stab ribs
|
Details
|
|
|
05-23-2012
|
5.00
|
Stab spar
|
Details
|
|
|
05-22-2012
|
4.50
|
Rudde closer, Start stab
|
Details
|
|
|
05-21-2012
|
3.50
|
Rudder ready to close
|
Details
|
|
|
05-20-2012
|
4.00
|
Rudder debur and dimple
|
Details
|
|
|
05-19-2012
|
1.00
|
Rudder drill
|
Details
|
|
|
05-18-2012
|
2.50
|
Rudder start
|
Details
|
|
|
05-15-2012
|
2.00
|
Fin assembly
|
Details
|
|
|
05-14-2012
|
4.00
|
Fin assembly
|
Details
|
|
|
05-14-2012
|
1.00
|
Dimpler table
|
Details
|
|
|
05-13-2012
|
6.00
|
Fin dimple
|
Details
|
|
|
05-12-2012
|
4.00
|
Fin
|
Details
|
|
|
05-11-2012
|
4.00
|
Emp start
|
Details
|
|
|
05-10-2012
|
1.50
|
START!
|
Details
|
|
|
05-10-2012
|
1.00
|
Bandsaw
|
Details
|
|
|
05-09-2012
|
2.00
|
Organize
|
Details
|
|
|
05-08-2012
|
2.00
|
Setting up parts bins
|
Details
|
|
|
04-08-2012
|
6.00
|
Inventory wing and fues kits
|
Details
|
|
|
04-06-2012
|
5.00
|
Pick up fues and wing
|
Details
|
|
|
04-05-2012
|
3.00
|
Wing Stand
|
Details
|
|
|
03-30-2012
|
3.00
|
Inventory tail kit
|
Details
|
|
|
03-29-2012
|
3.00
|
Pick up tail kit
|
Details
|
|