KitLog pro

Powered By Kitlog Pro v2.0

Bruces Web Site
' style=
Date:  4-7-2013
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Design Skyview cable lengths, build cables

Put both Skyview displays into panel and connected up the harnesses. Locked them in place at their termination point and removed each display to determine if there was enough service loop to disconnect the cables from the display easily. Measured length of optimum cable for the main, main UPS and main backup battery wires. Did the same for the network cables between the EMS and first display, the display - display and display to hub cables. Will end up cutting one end off of the purchased network cables to make the best length. Panel sure is simple, I like it.

Made the Transponder and ADSB receive cables and the end of the power cable to my Skyview hub cab. Made up one end of a antenna cable and decided that the transponder and ADSB receiver need to be mounted lower to reduce the radius of the antenna bend to avoid the tunnel top. Should be easy, just mark the center line of the holes and make a drill guide to locate the new hole vertically from the existing.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.