Date:  4-6-2013
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Transceiver mount, pull out and in #2 cable, test

Photo 1 shows the transceiver mount clecoed to the skin. Is about 1/4" inside the panel that goes over that area.

Realized a few days ago that I had pulled the #2 battery cable thru the wrong hole on the first former behind the firewall. Though I could work around it, but all the wire runs would end up crossing the cable, so decided to fix it. Should have unsoldered the lug at the starter solenoid and pulled it back, but decided to disconnect at the battery and pull that way because the lug would fit thru the conduit. Mistake. It did fit, but was a struggle. Ended up taking most of 2.5 hours to pull it and put it back in, redo the master wire and Ebus alternate wire that had to be cut and pulled back with it. At least it is right now.

Tested the power plug to the Skhview hub, was Ok. Made up the elevator AP servo network plug. Tomorrow put in the panel and Skyviews and determine the length needed for the two major connectors. One should be Ok as is for length, the other is too short and 25 wires must be replaced. The provided Skyview display cable is only 2', needs to be about 3.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.