Date:  3-27-2013
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Main battery lead and master

Completed installation and wiring of the battery leads to the starter SV, wires to the battery and ground. Using a temporary battery for testing. Included the #12 wire that goes from a fuse on the battery lead to the Ebus switch and wired it in.

Can short the master wire to ground and the click sounds like an airplane!

Started preparing the panel area for wires by running a 1/16 X 1/4 flat steel piece along the wire run that will pick up all the switches. Wires will be attached with hemporary straps to it until they are self supporting. Started with the #8 main line from the starter SV on the batt side that runs across the ship to the fuse panel. Figured out the service loop necessary to get the fuse panel to fold down to access the two Skyview hubs. Will make similar wire guides to get the run organized.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.