KitLog pro

Powered By Kitlog Pro v2.0

Bruces Web Site
' style=
Date:  12-3-2013
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Oil door, electrical supports

Worked on the oil door. Drilled in hinge, cut and trimmed door to fit opening after working on the edges of the opening to get them square and deep enoguh. Cut in the Hartzel latch on the door. Glued on the foam and glassed the inside. Put it on the cowling with some wieghts that will hipefully let it set up without the twist that came with the door.

Sanded the plenum down, ready for finishing on the outside and inside.

Laid out six brackets that will go on the oil pan bolts and then be supports for the wiring to the EGT, ELT, starter wire, alternator wires and Light Speed cable wire bundles.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.