Brief Description: Paint panel, wire ampmeter, gen. fues link.
Primer turned out almost perfect. Sanded a couple of places where some light sanding marks showed. Mixed panel paint and painted. It is a urethane so needs good ventilation. I opened the RV door partially and the hanger man door to get some cross flow. The wind picked up quite a bit and blew dust on the new paint. Looks like tomorrow will be a sand and repaint day if it cures enough in the hanger bathroom (curing room).
Worked on firewall where the ampmeter, alternatorr fuseable link and starter solenoid come together. Made a couple of brass buss bars to connect the hot end. Made a couple of #26 wire fuseable links for the ampmeter pickups and the #8 that feeds the aircraft. Also made one end of the alternator cable. Put it all together and tied off.