KitLog pro

Powered By Kitlog Pro v2.0

Bruces Web Site
' style=
Date:  4-3-2013
Number of Hours:  4.00
Manual Reference:  
Brief Description:  ADHARS and elev servo wire

Went to work on the ship yesterday and my back went into spasm. Barely made it into the house. Did something on Sat with the glider disassy. Spent the day with a hot pad, but got the taxes done.

The UPS guy delivered the PAR100EX and wire harness from Stein. Photo 3, harness would have taken me at least 12 or more hours. Geat thing. Figured where to mount the remote transceiver.

Pulled the ADHARS network and elevator servo wire bundles up to the front of the A.C. The Skyview network cable was about 3' too long, so I cut off the end that had the pins crimped on and saved it for another short network cable. Installed pins and Dsub connetors with covers on the aft end of the cables and figured the routing/tiedowns for both. Tied the AP cable for the length it is out of conduit.

Before I can do the AP network plug up front I need about 3' of 3/8 heat shrink rather than the usual tie. Ordered from Vans, should be here Thursday A.M..
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.