KitLog pro

Powered By Kitlog Pro v2.0

Bruces Web Site
' style=
Date:  10-12-2012
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Conduit, baggage floor

Installed conduit. Tied down with tie wraps and silicon glue at possible wear points. Took pictures before cutting wraps so they can be seen.

Installed baggage floor and installed all pop rivets. Started riveting nutplates.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.