Riveted baggage area side panel in place. Insalled baggage are closeout pieces and drilled for nutplates. Installed about18 nutplates to hold it in.
Got to love nutplates to build a Vans AC. I can't imagine building one without a nutplate drilling jig. The ones on the baggage closeout do not have the rivet holes prepunched.