KitLog pro

Powered By Kitlog Pro v2.0

Bruces Web Site
' style=
Date:  11-29-2013
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Plenum oil filler, mounts and fill CF

Cut hole in bottom of oil filler box and removed the foam. Cut the top out and removed the rest of the foam. Trimmed the top. Put on and verified all is well. With some baffle material on the bottom, it will seal the filler and have almost no air loss. A lot of work.

Made the two front inner brackets to hold the plenum and drilled holes for the plenum/front baffle joint.

Mixed two batches of micro and started filling on the plenum top. Plenty of work to do on it, I am not a great glass fabricator, but you can fix almost anything with enough work. Ten days on the plenum, I have to believe it will be worth it!
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.