KitLog pro

Powered By Kitlog Pro v2.0

Bruces Web Site
' style=
Date:  1-29-2014
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Installing stabr and fin

Moved stab and fin to the rear of the aricraft. Removed the remaining blue covering and cleaned up the surfaces. Built a set of bushings to center a .008 wire to check the allignment of the control surface rod ends. Adjusted the rudder middle by 1 turn and the elveators were Ok as is.

Bolted the stab to the aircraft. Installed the trim system and pulled the cables thru the stab. Bolted it down.

Installed the fin and put in all bolts and started tightening them.

This thing is almost finished, will talk to AOPA about insurance tomorrow. Engine run next week. First log entry with real work was 5/8/2012, so about 1 year and 9 months to build.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.