KitLog pro

Powered By Kitlog Pro v2.0

Bruces Web Site
' style=
Date:  9-6-2013
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Landing gear prep, ELT

Continued on landing gear perperation. All bolts are fitted, main gear brake anchor is installed and front wheel is on and ready. Checked all the bolts for proper fit and size. Don't want to have the AC up in the air while doing something I could do now.

ELT and glass polish arrived from ACSl Polished out all the glass that I had scratched while doing the window fiberglass surrounds.

Started trying to locate ELT. Best location would be under the stab but there might be a clearance issue with the elevator pushrod. Will continue tomorrow.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.