KitLog pro

Powered By Kitlog Pro v2.0

Bruces Web Site
' style=
Date:  5-9-2013
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Testing list, alt air SV, Light Speed Ignition

Made a list of devices that have been installed, tested and calibrated either with just guess numbers or real. Wired the alt air solenoid valve and tested, both stick switches, elevator autopilot servo, and prelim. calibration onthe flap position indicator.

Ran wires to the Light Speed ignition location, rt. wing taxi light, both side fuel level senders and alternator field. Time to go thru the list of devices firewall forward and make sure the wires are there. Also review the wire bundles behind the panel and see what is missing. Then it is time to start lacing up everything and installing a bunch of cable clamps.

Photo 2 is the map on the 7"display showing several aircraft being tracked by the system. To show, they must have their own ADSB out display. More than I figured except it seemed there were a bunch over the hills acting like military practicing something. Four or five aircraft staying in a reasonably small area at about the same altitude.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.