Brief Description: Firewall sheilds, oil quick drain, Filter air box,
Mixed fireproofing and then installed all the firewall shields. Took two batches because of the quick set up time. Put in sheet metal screws in all.
Installed oil quick drain and saftied. Final installed filter air box including safety wire and star washers on the internal bolts. Put in filter and bolts.
Firewall forward is finished, needs a complete going over and a couple of very minor jobs.
Tomorrow start on the interior. Made a list of all the lables I will need.