KitLog pro

Powered By Kitlog Pro v2.0

Bruces Web Site
' style=
Date:  9-11-2012
Number of Hours:  4.00
Manual Reference:  
Brief Description:  

Deburred and edged the two front skins. Primed longerons.

Started on tubing. Temporarly installed brake fittings and ran the two easy pieces from the L.G fitting to the tunnel. Started on the long run from the firewall to the tunnel by bending a model out of heavy tie wire. Nice to do something aside from sheet metal.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.