KitLog pro

Powered By Kitlog Pro v2.0

Bruces Web Site
' style=
Date:  7-12-2012
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Trim tabs completed, Start elevator trim sys.

Completed trim tabs to close out stab construction section.

Started on elevator trim system before doing stab installation. Need to set up a table that can vary height as needed. Looking at a Harbor Freight hydraulic lift table. With mods it may be the answer.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.