KitLog pro

Powered By Kitlog Pro v2.0

Bruces Web Site
' style=
Date:  6-14-2013
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Rivet vents, OAT probes, replace molex

Put two rivets in each vent. Drilled holes and mounted OAT probes in the rear vents for the ADHARS. Need to get new plugs, the wires are about 10' long and need to be about 16".

Parts got here from Stein, so replaced all the molex connectors with good AMPs. No photo,

Its about time to remove all the avionics and go back to fiberglass and such.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.