Assembled front and rear sections. Checked spar width, same all sides top and bottom. Clecoed everything together and started drilling. Set it up to spars were off the table and accessable from underneath. The lifting table was modified with 8" lifters and 4' long supports to get it up to elevation and support the width of the fues.