KitLog pro

Powered By Kitlog Pro v2.0

Bruces Web Site
' style=
Date:  5-14-2013
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Final wires, tie wires, test, cig. lighter plug

After two days off moving 11 cy of topsoil it was geat to get back to the airplane.

Pulled the last wires, to the cig. lighter aux power plug in the console. Hopefully these are the end.

Tested and verified all the wires to the wing plugs on both sides. Tied the wires in the controll area and tunnel. Added the cig. lighter plug to the console and put on a 2 pin plug.

Decided I would complete the firewall before doing the cabin top. Will order the insulation from ACS and the oil cooler mount from Vans. It is included in the firewall forward kit, but it is worth the $37 to be able to reach the rivets from the outside to install it.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.