KitLog pro

Powered By Kitlog Pro v2.0

Bruces Web Site
' style=
Date:  11-21-2013
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Lay up plenum, wires FWF

Cut out three pieces of carbon fiber 32 X 35" for the plunum. Laminated three layers with resin and then laid out paper template and cut to shape. Moved the whole thing into the cabin top mold and put in the correct position and then removed the wax paper from the bottom layer. Used some lead weight sacks to push the carbon into the areas around the inlets. Removed most of the inner wax paper and put down release tape over the area where the oil filler access box will be located.

Wrapped the thing in blankets and put my 1960's hair dryer hose under the blankets and left it to cure overight.

Started laying out the wire runs in the engine compartment.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.