| Date 
 | Hours 
 | Work Log Summary 
  
 | Details 
  
 | 
		
	| 12-28-2013 
 | 2.00 
 | DAR N913BC APPROVAL 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 12-26-2013 
 | 1.50 
 | Completed prep for inspection 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 12-25-2013 
 | 2.50 
 | Repaired cowl 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 12-23-2013 
 | 2.00 
 | Prep for inspection.  Fuel tank removal. 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 12-15-2013 
 | 1.00 
 | Performed another fuel flow test 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 12-15-2013 
 | 2.50 
 | Misc Final PA items 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 12-08-2013 
 | 2.00 
 | Balanced carbs 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 12-07-2013 
 | 1.50 
 | Repitched prop and began carb sync 
 |  | 
	|     | 
	| 
 | 
	
	| 12-01-2013 
 | 1.00 
 | Ran engine, check ignition modules 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 12-01-2013 
 | 2.50 
 | Calibrated Fuel System 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 11-24-2013 
 | 1.00 
 | Completed weighing aircraft 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 11-23-2013 
 | 3.00 
 | Attached fairings, cowl and began W&B 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 11-17-2013 
 | 6.00 
 | Worked on items to get ready for weight and balanc 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 11-11-2013 
 | 3.00 
 | Installed interior carpet, sidewalls 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 11-10-2013 
 | 5.00 
 | Began installing interior kit in order to do weigh 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 11-09-2013 
 | 4.50 
 | Ran Engine, began other tests 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 10-29-2013 
 | 2.00 
 | Oil purged engne 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 10-26-2013 
 | 3.00 
 | Test run engine 3X 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 10-26-2013 
 | 2.50 
 | Finished tidying up hanger 
 |  | 
	|       | 
	| 
 | 
	
	| 10-26-2013 
 | 2.00 
 | Adjusted right stabilator aft skin to better align 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 10-25-2013 
 | 0.25 
 | Reinstalled Wings after panels, seatbelts attached 
 |  | 
	|       | 
	| 
 | 
	
	| 10-25-2013 
 | 2.50 
 | Moved Hanger 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 10-25-2013 
 | 4.00 
 | Installed center channel panel and seat belts 
 |  | 
	|     | 
	| 
 | 
	
	| 10-21-2013 
 | 1.00 
 | Checked rocker arms after engine test run 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 10-20-2013 
 | 2.50 
 | Test Run Engine 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 10-20-2013 
 | 3.00 
 | Fabricated tool for propeller pitch measures 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 10-19-2013 
 | 1.50 
 | Added coolant and air filters to engine 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 10-06-2013 
 | 4.50 
 | Fuel System Test 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 10-06-2013 
 | 0.50 
 | AST alignment 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-29-2013 
 | 1.00 
 | Reinstalled the upper fuselage 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 09-29-2013 
 | 1.50 
 | Rechecked torques, spark plug gaps 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 09-29-2013 
 | 2.00 
 | Added FTS and installed fuel filler tube 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-29-2013 
 | 0.50 
 | Added FTC to firewall wire opening 
 |  | 
	|      | 
	| 
 | 
	
	| 09-28-2013 
 | 5.00 
 | 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 09-27-2013 
 | 1.50 
 | Reinstalled ELT to aircraft and tested 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-22-2013 
 | 3.00 
 | Trimmed flapperons and wing skins 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-15-2013 
 | 1.25 
 | Purged oil into engine 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 09-15-2013 
 | 2.50 
 | Bled brake lines 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-14-2013 
 | 3.25 
 | Updated S/W and other misc steps 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-02-2013 
 | 0.50 
 | Loaded latest S/W and began configuration 
 |  | 
	|     | 
	| 
 | 
	
	| 09-02-2013 
 | 2.00 
 | Began to add warnings & placards to aircraft 
 |  | 
	|       | 
	| 
 | 
	
	| 09-02-2013 
 | 1.00 
 | Attached spinner, cleaned up hanger took pictures 
 |  | 
	|     | 
	| 
 | 
	
	| 08-30-2013 
 | 0.25 
 | Temp Wired Oil Cooler to engine for test firing. 
 |  | 
	|     | 
	| 
 | 
	
	| 08-30-2013 
 | 3.00 
 | Installed rear window into aircraft 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-30-2013 
 | 0.25 
 | Completed SB 13-08-08 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-30-2013 
 | 0.75 
 | Added air to tires and cleaned up shop 
 |  | 
	|     | 
	| 
 | 
	
	| 08-18-2013 
 | 3.00 
 | Reattached turtle deck window to the fuselage 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-17-2013 
 | 2.00 
 | Removed vinyl from fuselage 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-10-2013 
 | 3.75 
 | Installed flaperon control hardware 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 08-10-2013 
 | 0.50 
 | Corrected connector wiring for the pulse lighting 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 08-10-2013 
 | 1.50 
 | Began to remove turtle deck window 
 |  | 
	|     | 
	| 
 | 
	
	| 08-09-2013 
 | 3.50 
 | Matched drilled flaperon torque tubes 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 07-28-2013 
 | 1.00 
 | Misc work in hanger 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 07-28-2013 
 | 1.50 
 | Completed stabilator cable install 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 07-28-2013 
 | 0.50 
 | Attached flapperons to wings 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 07-27-2013 
 | 4.00 
 | Fit wings and temporarily installed them 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 07-26-2013 
 | 3.00 
 | Installed stabilator cables 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 07-14-2013 
 | 1.00 
 | Finished AST assemblies install and trim servo att 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 07-13-2013 
 | 0.75 
 | Rudder fully installed with cables 
 |  | 
	|      | 
	| 
 | 
	
	| 07-13-2013 
 | 1.50 
 | Installed stabilator to tailcone. 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 07-13-2013 
 | 1.00 
 | Installed Control Horns & Counter balance to stabi 
 |  | 
	|     | 
	| 
 | 
	
	| 07-13-2013 
 | 0.75 
 | Finished attachment of rudder to aircraft 
 |  | 
	|     | 
	| 
 | 
	
	| 07-12-2013 
 | 1.00 
 | Reattached spinner and propeller 
 |  | 
	|     | 
	| 
 | 
	
	| 07-12-2013 
 | 1.00 
 | Attached V-stabilator to aircraft 
 |  | 
	|     | 
	| 
 | 
	
	| 07-07-2013 
 | 2.50 
 | Finished fabrication of spacer 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 07-06-2013 
 | 2.50 
 | Began fabrication of propeller spacer 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 07-05-2013 
 | 1.00 
 | Removed propeller spinner from aircraft 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 07-05-2013 
 | 2.50 
 | Organized and cleaned hanger 
 |  | 
	|     | 
	| 
 | 
	
	| 07-04-2013 
 | 1.00 
 | Began organizing hanger 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 06-29-2013 
 | 4.00 
 | Moved fuselage to Hanger 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 06-25-2013 
 | 1.50 
 | Fabricated wood frame chocks for aircraft move 
 |  | 
	|     | 
	| 
 | 
	
	| 06-24-2013 
 | 1.50 
 | Sanded aft edge of spinner 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 06-21-2013 
 | 1.00 
 | Began sanding spinner backplate 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 06-17-2013 
 | 1.50 
 | Reinstalled pushrods 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 06-15-2013 
 | 1.50 
 | Installed tubing for AOA option later 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 06-15-2013 
 | 3.00 
 | Installed most of throttle and choke cables 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 06-15-2013 
 | 1.00 
 | Begain reinstalling h/w to center channel per plan 
 |  | 
	|     | 
	| 
 | 
	
	| 06-15-2013 
 | 0.50 
 | Added tie wraps to antenna cable in tail 
 |  | 
	|       | 
	| 
 | 
	
	| 06-14-2013 
 | 2.50 
 | Installed most of ADS-B antenna in tailcone 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 06-13-2013 
 | 2.00 
 | Removed center channel hardware 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 06-11-2013 
 | 1.50 
 | Re-attached rudder petals and wire guard 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 06-10-2013 
 | 1.75 
 | Removed Rudder Petals, fed antenna cable 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 06-09-2013 
 | 1.50 
 | Installed Blasttube and Regulator Cooling Shroud 
 |  | 
	|       | 
	| 
 | 
	
	| 06-09-2013 
 | 2.00 
 | Finished install of oil cooler and repaired sensor 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 06-08-2013 
 | 1.00 
 | Installed oil hoses up to step 6. 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 06-08-2013 
 | 0.25 
 | Epoxy glued lable to inside of lower cowl 
 |  | 
	|      | 
	| 
 | 
	
	| 06-08-2013 
 | 1.50 
 | Added seals to cowl vent 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 06-07-2013 
 | 2.50 
 | Wet sanded cowl and removed tape 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 06-07-2013 
 | 1.00 
 | Added epoxy/flox to lower cowl gap 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 06-04-2013 
 | 2.50 
 | Moved wings from storage to Hanger 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 06-02-2013 
 | 0.25 
 | Primed / debured / painted F-00002 Cooling Shroud 
 |  | 
	|     | 
	| 
 | 
	
	| 06-02-2013 
 | 1.50 
 | Moved tail parts to rented hanger 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 06-02-2013 
 | 2.00 
 | Epoxy/floxed cooling and interface ducts to cowl 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 06-01-2013 
 | 4.50 
 | Fit the cooling duct to the lower cowl 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 06-01-2013 
 | 1.00 
 | Cut tailpipe 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 05-31-2013 
 | 2.50 
 | Installed oil cooler to cooler duct 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 05-30-2013 
 | 3.00 
 | Completed install of heater door control cable 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-29-2013 
 | 1.50 
 | Began installing heater door control cable 
 |  | 
	|      | 
	| 
 | 
	
	| 05-28-2013 
 | 2.00 
 | Installed heat exchanger and hoses 
 |  | 
	|       | 
	| 
 | 
	
	| 05-26-2013 
 | 1.25 
 | Completed oil cooler assembly 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-25-2013 
 | 5.00 
 | Installed overflow bottle and began working on coo 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-24-2013 
 | 6.00 
 | Installed cooling door and oil tank 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-22-2013 
 | 0.50 
 | Installed springs into coolant hoses 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-22-2013 
 | 1.00 
 | Installed EGT probes 
 |  | 
	|       | 
	| 
 | 
	
	| 05-21-2013 
 | 2.50 
 | Completed most of muffler install 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-19-2013 
 | 0.50 
 | Installed ADS-B box and brackets to SL40 rack 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 05-18-2013 
 | 3.00 
 | Completed spinner install 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-16-2013 
 | 2.00 
 | Fabricated and primed back plates for spinner 
 |  | 
	|     | 
	| 
 | 
	
	| 05-14-2013 
 | 2.00 
 | Aligned spinner and fabricated gap fillers 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-13-2013 
 | 2.00 
 | Attached Hub and Propeller 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-12-2013 
 | 1.50 
 | Organized tools and cleaned up workshop 
 |  | 
	|     | 
	| 
 | 
	
	| 05-12-2013 
 | 2.00 
 | Completed prep of the spinner 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-12-2013 
 | 1.50 
 | Cleaned up workshop and organized tools 
 |  | 
	|     | 
	| 
 | 
	
	| 05-11-2013 
 | 0.50 
 | Replaced exisiting oil fitting with new one 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 05-11-2013 
 | 25.00 
 | Completed install of the pitot tube 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-10-2013 
 | 1.00 
 | Installed Fuel Drain tube and hose to engine 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-07-2013 
 | 2.50 
 | Added additional electical connections to engine 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-06-2013 
 | 2.50 
 | Began connecting fuel lines & wiring to engine 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-05-2013 
 | 2.00 
 | Mounted Engine 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-05-2013 
 | 3.50 
 | Finished stiffener install. 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-05-2013 
 | 1.00 
 | Began working on ADS-B install 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 05-04-2013 
 | 1.00 
 | Riveted firwall brace and cut F-1202N-R & L 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-03-2013 
 | 1.00 
 | Match drilled firewall brace 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 05-02-2013 
 | 2.75 
 | Began Stiffener Retrofit install 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-01-2013 
 | 0.75 
 | Inventoried ADS-B Kit from Vans 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-01-2013 
 | 1.50 
 | Installed chain hoist in garage 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 04-29-2013 
 | 1.50 
 | Sanded and final epoxed the canopy fairing. 
 |  | 
	|     | 
	| 
 | 
	
	| 04-29-2013 
 | 0.25 
 | Completed step and read ahead in plans 
 |  | 
	|     | 
	| 
 | 
	
	| 04-28-2013 
 | 1.00 
 | Sanded fairings and put them in temp storage 
 |  | 
	|     | 
	| 
 | 
	
	| 04-28-2013 
 | 1.50 
 | Sanded and added another coat of epoxy 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 04-28-2013 
 | 0.50 
 | Installed WH-RV12 Ignition Harness to modules 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 04-28-2013 
 | 0.45 
 | Drilled 3/8" hole in both gas struts 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 04-26-2013 
 | 1.00 
 | Removed wheel fairings 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 04-23-2013 
 | 1.50 
 | Clamp block assembly 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 04-22-2013 
 | 1.25 
 | Installed L & R Drip Pans under carburetor 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 04-21-2013 
 | 2.50 
 | Rotated headset Jacks from L to R 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 04-21-2013 
 | 0.50 
 | Installed Oil Tank Mount Bracket 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 04-21-2013 
 | 2.00 
 | Drilled holes in lower firewall for the engine att 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 04-20-2013 
 | 1.25 
 | Installed Manifolds and attached ignition module 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 04-18-2013 
 | 0.25 
 | Worked on avionics control module 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 04-18-2013 
 | 0.50 
 | Began prep on oil tank brace 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 04-18-2013 
 | 1.25 
 | Added RTV to cooling shroud and reattached cooling 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 04-14-2013 
 | 4.00 
 | Worked on fine tuning Skyview adjustments 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 04-14-2013 
 | 2.50 
 | Completed more engine prep 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 04-13-2013 
 | 3.00 
 | Trim speed adjustment and began working on Skyview 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 04-13-2013 
 | 0.25 
 | Removed crackcase allen screw 
 |  | 
	|      | 
	| 
 | 
	
	| 04-13-2013 
 | 0.75 
 | Finished fitting shroud and removed coolant hoses 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 04-10-2013 
 | 0.75 
 | Installed replacement starter relay 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 04-10-2013 
 | 1.50 
 | Completed fitting of cooling shroud 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 04-08-2013 
 | 2.75 
 | Continued to work on engine 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 04-08-2013 
 | 0.25 
 | Another coat on part of canopy 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 04-07-2013 
 | 1.50 
 | Removed several items from engine per plans 
 |  | 
	|       | 
	| 
 | 
	
	| 04-07-2013 
 | 1.00 
 | Prepared canopy for another coat of black epoxy 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 04-06-2013 
 | 2.50 
 | Began working on Rotax engine 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 04-03-2013 
 | 3.00 
 | Installed various wire connectors in firewall area 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 04-02-2013 
 | 2.75 
 | Installed several firewall forward wire harnesses 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 04-01-2013 
 | 3.00 
 | Begain installing firewall wiring 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-31-2013 
 | 1.00 
 | Inventoried and partially fabricated towbar 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 03-31-2013 
 | 5.00 
 | Finished inventory of the engine kit 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-30-2013 
 | 0.45 
 | Continued unpacking engine kit crate 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-29-2013 
 | 1.50 
 | Began unpacking engine kit crate 
 |  | 
	|       | 
	| 
 | 
	
	| 03-20-2013 
 | 1.50 
 | Sanded canopy to prep for next epoxy coat 
 |  | 
	|     | 
	| 
 | 
	
	| 03-17-2013 
 | 3.50 
 | Installed ELT into fuselage 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-17-2013 
 | 1.50 
 | Installed ADHRS to tailcone bracket 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-17-2013 
 | 1.50 
 | Cleared around shop and vaccumed interior of fusel 
 |  | 
	|     | 
	| 
 | 
	
	| 03-13-2013 
 | 1.50 
 | Misc 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 03-12-2013 
 | 2.00 
 | Installed the GPS antenna 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-11-2013 
 | 1.50 
 | Installed battery into ELT interior warning 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 03-10-2013 
 | 3.00 
 | Partially installed ELT H/W 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-09-2013 
 | 5.00 
 | Installed most of SkyView Avionics 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-07-2013 
 | 3.00 
 | Began installing Avionics 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-06-2013 
 | 2.00 
 | Inventory of Avionics Shipment 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 02-24-2013 
 | 0.50 
 | Drilled out and epoxyed right side fairing 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 02-24-2013 
 | 2.50 
 | Applied fuel tank sealant to firewall 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 02-24-2013 
 | 0.50 
 | Adjusted fit of left fairing front/rear halves 
 |  | 
	|     | 
	| 
 | 
	
	| 02-09-2013 
 | 4.00 
 | Completed Installation of Main Wheel Fairings 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 02-02-2013 
 | 4.00 
 | Trimmed and attached both main wheel fairings 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 01-30-2013 
 | 1.25 
 | Attached Right Wheel Fairing 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 01-20-2013 
 | 2.00 
 | Fit left wheel pant to gear leg 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 01-17-2013 
 | 3.00 
 | Installed brake lines along gear legs 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 01-10-2013 
 | 0.00 
 | Purchased tool bench 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 01-07-2013 
 | 1.50 
 | Torqued all the center channel bolts 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 01-06-2013 
 | 5.00 
 | Re-attached main gear legs to center fuselage 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 12-30-2012 
 | 3.75 
 | Match drilled outboard attach wear plates 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 12-29-2012 
 | 3.25 
 | Added bevels to U-1202 and deburred U-1202C/D wear 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 12-28-2012 
 | 4.50 
 | Riveted brackets & skin doublers to fuselage 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 12-26-2012 
 | 5.75 
 | Completed steps 21 to 29 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 12-25-2012 
 | 2.00 
 | Completed steps 13-20 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 12-24-2012 
 | 1.00 
 | Completed Step 12 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 12-21-2012 
 | 0.50 
 | Tapped main gear fairing attach plates 
 |  | 
	|     | 
	| 
 | 
	
	| 12-21-2012 
 | 0.50 
 | Misc. shop cleanup 
 |  | 
	|     | 
	| 
 | 
	
	| 12-21-2012 
 | 2.50 
 | Finalized canopy install 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 12-21-2012 
 | 1.50 
 | Began work on SB 12-11-09 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 12-20-2012 
 | 6.50 
 | Completed Nose Wheel Fairing 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 12-18-2012 
 | 3.00 
 | Additional work on nose wheel fairing 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 12-17-2012 
 | 1.50 
 | Riveted nose wheel fairing 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 12-17-2012 
 | 1.00 
 | Inventoried SB parts for side skin stiffening 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 12-16-2012 
 | 2.25 
 | Epoxy and riveted splice strip to nose wheel fairi 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 12-16-2012 
 | 1.00 
 | Began work on hinge for gear leg fairing 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 12-16-2012 
 | 2.75 
 | Added H/W to nose fork and fitted nose leg fairing 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 12-15-2012 
 | 2.25 
 | Fitted nose wheel fairing halves and worked on spl 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 12-13-2012 
 | 2.00 
 | Wet and dry sanded fairing - removed tape 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 12-10-2012 
 | 1.50 
 | Added epoxy coat to fairing 
 |  | 
	|     | 
	| 
 | 
	
	| 12-09-2012 
 | 3.50 
 | Trimmed, sanded and fitting of nose wheel fairing 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 12-09-2012 
 | 1.25 
 | Filled canopy attach holes with epoxy/flox 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 12-08-2012 
 | 0.50 
 | Workshop Cleanup 
 |  | 
	|     | 
	| 
 | 
	
	| 12-08-2012 
 | 4.50 
 | Trimmed Canopy Fairing 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 12-04-2012 
 | 1.00 
 | Sanded and added another epoxy coat 
 |  | 
	|     | 
	| 
 | 
	
	| 12-04-2012 
 | 1.50 
 | Added nutplates to wheel pant brackets 
 |  | 
	|      | 
	| 
 | 
	
	| 11-30-2012 
 | 1.50 
 | Sanded and added another epoxy coat 
 |  | 
	|     | 
	| 
 | 
	
	| 11-28-2012 
 | 1.50 
 | Sanded then added epoxy layer to fairing 
 |  | 
	|       | 
	| 
 | 
	
	| 11-24-2012 
 | 2.50 
 | Sanded fairing and added epoxy/micro balloon mixtu 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 11-24-2012 
 | 3.25 
 | Continued to work on main wheel pants 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 11-22-2012 
 | 2.00 
 | Began work on wheel fairings 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 11-22-2012 
 | 0.25 
 | Added more epoxy to aft edge of canopy 
 |  | 
	|      | 
	| 
 | 
	
	| 11-21-2012 
 | 2.50 
 | Sanded and added epoxy coat to fairing 
 |  | 
	|       | 
	| 
 | 
	
	| 11-11-2012 
 | 1.00 
 | Sanded canopy fairing 
 |  | 
	|     | 
	| 
 | 
	
	| 11-03-2012 
 | 3.50 
 | Layup of top fairing 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 10-29-2012 
 | 1.50 
 | Light sanding of first stage of fairing layup 
 |  | 
	|       | 
	| 
 | 
	
	| 10-28-2012 
 | 3.25 
 | Began layup of canopy fairing left and right sides 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 10-25-2012 
 | 1.00 
 | Cut glass for side fairings 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 10-24-2012 
 | 1.25 
 | Final Fairing Surface Prep 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 10-23-2012 
 | 1.50 
 | Sanded fairing foam and taped template outline 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 10-21-2012 
 | 1.25 
 | Expoxy glued foam fillers to L/R canopy frame 
 |  | 
	|       | 
	| 
 | 
	
	| 10-21-2012 
 | 1.75 
 | Cut glass strips and other canopy fairing prep 
 |  | 
	|       | 
	| 
 | 
	
	| 10-17-2012 
 | 1.25 
 | Canopy foam prep and fitting 
 |  | 
	|       | 
	| 
 | 
	
	| 10-14-2012 
 | 0.50 
 | Shop cleanup 
 |  | 
	|     | 
	| 
 | 
	
	| 10-14-2012 
 | 1.50 
 | Finished install of rudder petal hardware 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 10-14-2012 
 | 1.25 
 | Began work on canopy skirt 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 10-13-2012 
 | 3.75 
 | Fit and installed rudder cables 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 10-07-2012 
 | 1.00 
 | Installed pulleys for stabiliator cables 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 10-07-2012 
 | 4.00 
 | Install rudder cable & built rigging stop 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 10-02-2012 
 | 0.50 
 | Removed cowl and tapped remaining nutplates 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 10-02-2012 
 | 1.50 
 | Organized parts for control parts install 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 10-01-2012 
 | 0.25 
 | Drilled trim servo linkage hole into lower tailcon 
 |  | 
	|     | 
	| 
 | 
	
	| 10-01-2012 
 | 2.00 
 | Completed oil door assembly 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-30-2012 
 | 5.75 
 | Mostly completed tailcone fairing 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-29-2012 
 | 0.50 
 | Temporarily added V.stab to the tailcone 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-29-2012 
 | 2.50 
 | Riveted nutplates and cut lower fairing 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 09-29-2012 
 | 1.75 
 | Countersunk tabs 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-28-2012 
 | 1.50 
 | Match drilled tabs to fairing 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-27-2012 
 | 0.50 
 | Riveted bottom flange of F-1211 to tailcone skins 
 |  | 
	|     | 
	| 
 | 
	
	| 09-27-2012 
 | 1.50 
 | Attach fitting of tail fairing to tailcone 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-25-2012 
 | 1.50 
 | Unpacked seats/interior kit 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-25-2012 
 | 0.50 
 | Reinstalled top cowl 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-24-2012 
 | 1.50 
 | Installed close out door 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-24-2012 
 | 1.00 
 | Cut oil door opening 
 |  | 
	|      | 
	| 
 | 
	
	| 09-23-2012 
 | 1.00 
 | Misc workshop cleanup and organizing 
 |  | 
	|     | 
	| 
 | 
	
	| 09-23-2012 
 | 3.00 
 | Countersinking then hinge riveting to cowls 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-23-2012 
 | 1.50 
 | Added nutplates to front of lower cowl. 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-22-2012 
 | 5.00 
 | Cowl hinge drilling and fitting onto fuselage 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-22-2012 
 | 1.50 
 | Countersinking of cowl #40 holes 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-20-2012 
 | 2.50 
 | Fit Lower Cowl to Fuselage 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-18-2012 
 | 2.00 
 | Fabricated and marked cowl hinges 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-15-2012 
 | 1.50 
 | Riveted canopy skirt to canopy 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-15-2012 
 | 1.50 
 | Installed D-Handle to canopy frame 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 09-15-2012 
 | 1.50 
 | Fabricated hinges and bent hinge pins 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-15-2012 
 | 1.00 
 | Added C-1214 Latch Block and trimmed it 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 09-14-2012 
 | 4.00 
 | Attached canopy to frame 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-13-2012 
 | 1.50 
 | Cowl trimming and work on hinge pins 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-12-2012 
 | 2.00 
 | More upper/lower cowl sanding 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-11-2012 
 | 2.00 
 | Began sanding the cowl pieces 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 09-10-2012 
 | 1.50 
 | Began cowl trim and sanding 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-08-2012 
 | 0.30 
 | Replaced Forward Upper Fuse Skin 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 09-08-2012 
 | 0.25 
 | More tank painting 
 |  | 
	|      | 
	| 
 | 
	
	| 09-08-2012 
 | 0.75 
 | Attached guide blocks to roll bar 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-08-2012 
 | 0.50 
 | 8/31/12 NOTIFICATION 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-06-2012 
 | 0.75 
 | Fabricated two guide blocks for canopy frame 
 |  | 
	|      | 
	| 
 | 
	
	| 09-06-2012 
 | 1.00 
 | Added sealant to canopy rib assembly 
 |  | 
	|       | 
	| 
 | 
	
	| 09-06-2012 
 | 0.25 
 | Added finish paint to parts of tank and fill tube 
 |  | 
	|      | 
	| 
 | 
	
	| 09-05-2012 
 | 0.75 
 | Primed exterior of fuel tank 
 |  | 
	|       | 
	| 
 | 
	
	| 09-05-2012 
 | 1.25 
 | Fabricated L/R latch handles for canopy frame 
 |  | 
	|       | 
	| 
 | 
	
	| 09-03-2012 
 | 5.00 
 | Completed Canopy Fitting 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-03-2012 
 | 1.00 
 | Cleaned and organized workshop 
 |  | 
	|     | 
	| 
 | 
	
	| 09-02-2012 
 | 6.50 
 | Fit canopy to frame 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-01-2012 
 | 0.45 
 | Resinstalled back window to fuselage 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 09-01-2012 
 | 0.50 
 | Placed canopy onto the canopy frame/fuselage 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-01-2012 
 | 3.75 
 | Installed canopy onto fuselage 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-01-2012 
 | 1.00 
 | Began pressure test on fuel tank 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-31-2012 
 | 1.50 
 | Moved aircraft across garage 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 08-31-2012 
 | 2.00 
 | Installed tunnel access brackets 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 08-31-2012 
 | 0.50 
 | Did more access panel priming 
 |  | 
	|      | 
	| 
 | 
	
	| 08-31-2012 
 | 2.00 
 | Began working on canopy frame 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-27-2012 
 | 1.50 
 | Workshop cleanup misc activites 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 08-26-2012 
 | 1.50 
 | Temp install of tank into fuselage 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-26-2012 
 | 3.00 
 | Finished assembly of fuel tank 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-25-2012 
 | 2.00 
 | Installed fuel window. 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-25-2012 
 | 1.00 
 | Fitted Fuel Float arm to tank 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 08-19-2012 
 | 1.50 
 | Misc deburring and priming of covers ect... 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 08-19-2012 
 | 2.50 
 | Additional Fuel Tank Sealing 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-18-2012 
 | 2.50 
 | Sanded and cut tail cone fairings 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-18-2012 
 | 3.75 
 | First round of tank sealing 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-18-2012 
 | 0.50 
 | Began prep for tank sealing 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-17-2012 
 | 1.50 
 | Preparation and deburing of alum. parts 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 08-17-2012 
 | 1.50 
 | Additional prep of tank parts 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 08-16-2012 
 | 3.00 
 | Assembled, match drilled and deburred tank 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 08-13-2012 
 | 1.75 
 | Deburred, Primed Fuel Tank Parts 
 |  | 
	|       | 
	| 
 | 
	
	| 08-12-2012 
 | 1.50 
 | Tapped roll bar for Aft Window screws 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-12-2012 
 | 1.00 
 | Fabricated Brake Lines 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-12-2012 
 | 3.00 
 | Began Fabricating Fuel Tank 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-11-2012 
 | 3.00 
 | Completed Aft Window preparation 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-10-2012 
 | 1.50 
 | Match Drilled Aft Window to Roll Bar 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-09-2012 
 | 2.00 
 | Clecoed Turtle Decks & Aft Window to Fuse 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 08-08-2012 
 | 0.50 
 | Tested trim tab wires and finished harness 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 08-08-2012 
 | 1.00 
 | Began to unpacked Seats / Interior Kit 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-06-2012 
 | 0.50 
 | Riveted nutplates to fork for nose fairing 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 08-06-2012 
 | 2.00 
 | Installed nose wheel to aircraft 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-05-2012 
 | 2.50 
 | Packed bearings and installed wheels 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-05-2012 
 | 1.00 
 | Installed Axels to Main Gear legs 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-05-2012 
 | 3.00 
 | Began install of nose gear 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-04-2012 
 | 6.00 
 | Installed both main gear legs to fuselage 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-04-2012 
 | 2.00 
 | Installed & inflated tubes in main wheels 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-03-2012 
 | 2.00 
 | Worked on nose and main wheels 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-03-2012 
 | 1.00 
 | Installed Engine Mount Standoff 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-02-2012 
 | 1.50 
 | Riveted Detent Bracket Assembly 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-01-2012 
 | 1.50 
 | Flap Handle and F-1261 spacers 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-01-2012 
 | 0.25 
 | Attached Pitch Servo Push Rod 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 07-30-2012 
 | 0.50 
 | Roll Servo Push Rod 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 07-30-2012 
 | 1.75 
 | Flaperon Push Rods and torque arms 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 07-29-2012 
 | 2.00 
 | Contructed both Flapperon Push Rods 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 07-29-2012 
 | 1.00 
 | Completed install of control stick h/w 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 07-28-2012 
 | 2.00 
 | Installed control stick hardware 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 07-27-2012 
 | 1.50 
 | Tailcone ADAHRS D Sub connector & OAT, pitot tube 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 07-27-2012 
 | 0.75 
 | Installed noise filter zip ties/RTV to fuel pump a 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 07-27-2012 
 | 0.75 
 | Installed noise filter to left strobe wing connect 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 07-27-2012 
 | 2.00 
 | Installed flapperon mixer and flap handle to fusel 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 07-27-2012 
 | 1.00 
 | Fed aft pitot line & trim control line through fus 
 |  | 
	|       | 
	| 
 | 
	
	| 07-27-2012 
 | 1.00 
 | Added tops to control system blocks with washers/n 
 |  | 
	|     | 
	| 
 | 
	
	| 07-26-2012 
 | 4.50 
 | Riveted Tailcone to Fuselage 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 07-19-2012 
 | 1.50 
 | Attached tailcone 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 07-18-2012 
 | 1.25 
 | Additional control rod fabrication 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 07-17-2012 
 | 2.00 
 | Fabrication of more control system parts 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 07-15-2012 
 | 1.00 
 | Primed and prepared parts for tailcone/flapperon c 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 07-15-2012 
 | 1.00 
 | Control Mod Attach & Vent. Holes 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 07-14-2012 
 | 1.00 
 | Installed Outside Temp Probe and wiring 
 |  | 
	|     | 
	| 
 | 
	
	| 07-14-2012 
 | 1.50 
 | Installed most of Wing/Fuse Connectors 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 07-14-2012 
 | 1.50 
 | Installed Headphone Jacks 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 07-14-2012 
 | 1.50 
 | Installed brake clamp & prepared parts 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 07-14-2012 
 | 1.00 
 | Finished wiring install of PTT for Control Sticks 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 07-13-2012 
 | 1.50 
 | Installed Ray Allen PTT & Grips 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 07-13-2012 
 | 0.50 
 | Installed Over Rudder Wireway 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 07-10-2012 
 | 0.50 
 | Worked on wire flange prep 
 |  | 
	|     | 
	| 
 | 
	
	| 07-10-2012 
 | 1.50 
 | Installed Rudder Petals into Fuselage 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 07-10-2012 
 | 0.50 
 | Attached brake reservoir 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 07-09-2012 
 | 2.00 
 | Misc Fuse Wiring additions 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 07-07-2012 
 | 2.00 
 | Wire Harness 00045 & misc installations. 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 07-07-2012 
 | 1.50 
 | Installed Cockpit Light 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 07-07-2012 
 | 2.00 
 | Additional AP servo wiring 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 07-06-2012 
 | 3.50 
 | Worked on control sticks. 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 07-05-2012 
 | 4.50 
 | Wiring and spar pin switch testing 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 07-05-2012 
 | 1.50 
 | Fabricated the Fuselage Pin Assembly 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 07-04-2012 
 | 3.00 
 | Installed fans & WH-00046 Wire Bundle 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 07-03-2012 
 | 1.75 
 | Began Finish Kit Build 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 07-02-2012 
 | 2.50 
 | Finished Finish Kit Inventory 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 07-01-2012 
 | 3.00 
 | Continued Hardware Inventory 
 |  | 
	|       | 
	| 
 | 
	
	| 06-30-2012 
 | 5.00 
 | Unpacked Finish Kit 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 06-16-2012 
 | 1.00 
 | Finished install of roll/pitch servos to fuselage 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 06-11-2012 
 | 2.00 
 | Prepared wiring and temp install pitch servo 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 06-10-2012 
 | 2.50 
 | Wing Electical Brackets 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 06-10-2012 
 | 2.50 
 | Autopilot servo assemblies 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-25-2012 
 | 2.50 
 | Completed Map Box Assembly 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-24-2012 
 | 0.25 
 | Sealed WD-1233 L/R Steps 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 05-24-2012 
 | 0.75 
 | Riveted hardware to panels 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 05-24-2012 
 | 1.75 
 | Misc Tailcone attach section steps 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 05-22-2012 
 | 2.00 
 | Additional Panel Section prep 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-20-2012 
 | 5.00 
 | Panel Attach Strips and Began Map Box 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-19-2012 
 | 3.00 
 | Oil Tank Braces and Upper Fuse Skin 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-17-2012 
 | 1.50 
 | Riveted Panel Base to Fuselage 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-17-2012 
 | 0.75 
 | Match Drilled Upper Firewall per template 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 05-16-2012 
 | 1.00 
 | Drilled changes to Panel Base for Skyview 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-16-2012 
 | 1.50 
 | Added nutplates to Panel Flange 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 05-15-2012 
 | 2.00 
 | Additional work on Panel Base and related parts 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-14-2012 
 | 2.50 
 | Continued work on upper fuselage parts prep 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-13-2012 
 | 4.50 
 | Additonal work on upper fuselage parts 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-12-2012 
 | 0.50 
 | Painted oil tank braces with red enamal 
 |  | 
	|     | 
	| 
 | 
	
	| 05-11-2012 
 | 2.50 
 | Further preparation of upper fuse parts 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-10-2012 
 | 3.00 
 | Began working on Upper Fuse parts for panel 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-08-2012 
 | 2.75 
 | Attached F-1201A assembly to fuselage 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-07-2012 
 | 2.50 
 | Re-fabricated hinges for doubler. 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-06-2012 
 | 2.75 
 | Match drilled piano hinges 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 05-05-2012 
 | 1.50 
 | Final riveted baggage assembly to fuselage 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-05-2012 
 | 0.50 
 | Fabricated wires for seat attachments 
 |  | 
	|     | 
	| 
 | 
	
	| 05-05-2012 
 | 3.00 
 | Began working on upper forward fuselage 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-03-2012 
 | 0.50 
 | Riveted ADAHRS brackets 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-03-2012 
 | 2.50 
 | Assembled the baggage bulkhead 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-02-2012 
 | 1.00 
 | Updated static system lines for Skyview 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 05-02-2012 
 | 1.50 
 | Match drilled shear clips to Baggage Bulkheads 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-01-2012 
 | 2.75 
 | Completed Sect 28 Fuel System 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 04-30-2012 
 | 2.25 
 | Completed aft fuel return line 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 04-29-2012 
 | 4.75 
 | Completed the 3/8" fuel lines 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 04-28-2012 
 | 2.50 
 | Began fabrication of fuel system 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 04-22-2012 
 | 4.50 
 | Finished assembly of rudder petals and brakes 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 04-21-2012 
 | 4.75 
 | Began assembly of Rudder Petals & Brakes 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 04-20-2012 
 | 2.00 
 | Riveted Seat Backs and Painted 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 04-20-2012 
 | 1.50 
 | Final riveted roll bar to fuselage 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 04-19-2012 
 | 3.50 
 | Seat back preparation 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 04-18-2012 
 | 1.25 
 | More interior painting and bulkhead part preparati 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 04-18-2012 
 | 1.00 
 | Began preparing seat back parts. 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 04-17-2012 
 | 2.75 
 | Prepared and primed more bulkhead parts 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 04-15-2012 
 | 3.75 
 | Riveted and Painted Roll Bar 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 04-14-2012 
 | 4.00 
 | Prepared and assembled Roll Bar Assembly 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 04-13-2012 
 | 2.25 
 | Match drilled roll bar and deburred 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 04-12-2012 
 | 2.50 
 | Assembled Roll Bar Assembly 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 04-11-2012 
 | 3.25 
 | Finished Vent Door and Lwr Cowl Hinges 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 04-10-2012 
 | 3.00 
 | Finished riveting side skins 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 04-09-2012 
 | 2.00 
 | Riveted right fuselage skin 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 04-08-2012 
 | 6.00 
 | Finished deburing and primed skins - re-attached. 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 04-07-2012 
 | 4.00 
 | Debured and primed skins and Longerons. 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 04-06-2012 
 | 2.00 
 | Match Drilled Longerons & Skins 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 04-05-2012 
 | 2.75 
 | Prepared and Clecoed Side Skins to Fuselage 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 04-04-2012 
 | 3.00 
 | Attached side frame pieces to fuselage 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 04-03-2012 
 | 3.25 
 | Prepared various parts for side skin attachment 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 04-02-2012 
 | 2.50 
 | Match Drilled Longerons to Canopy Decks 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 04-01-2012 
 | 4.00 
 | Fabricated both Longerons 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-31-2012 
 | 0.50 
 | Cut Longerons to 82 3/8 inches 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 03-31-2012 
 | 2.00 
 | Completed forward lower fuse 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-30-2012 
 | 3.50 
 | Nearing completion of fwd lower fuse 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-29-2012 
 | 3.25 
 | Continued to add nutplates etc.. to forward fuse 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 03-28-2012 
 | 3.50 
 | Began assembly and additonal parts prep 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-27-2012 
 | 3.00 
 | Deburred and prepared fwd fuse parts 
 |  | 
	|     | 
	| 
 | 
	
	| 03-26-2012 
 | 0.50 
 | Finished section 21 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 03-26-2012 
 | 1.00 
 | Collected section 22 parts and began deburring 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 03-24-2012 
 | 2.50 
 | Prepared bulkhead and installed steps 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-24-2012 
 | 3.00 
 | Prepared and installed step floors 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-24-2012 
 | 2.00 
 | Baggage bulkhead, pump bracket and AP bracket 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-22-2012 
 | 3.50 
 | Prepared and clecoed bottom skin to fuselage 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-21-2012 
 | 3.00 
 | Primed and installed corner skins 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-20-2012 
 | 3.00 
 | Prepared parts for corner skins and main skin 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 03-18-2012 
 | 4.50 
 | Completed Floor Seat Bulkhead and Control Assembly 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-17-2012 
 | 3.00 
 | Riveted Bulkhead Assembly Parts 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-17-2012 
 | 3.00 
 | Completed assembly and attachment of bulkhead 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-16-2012 
 | 3.50 
 | Riveted Floors to Mid Fuse and worked on bulkhead 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-16-2012 
 | 5.00 
 | Riveted Bottom Skin & prepared step parts 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-15-2012 
 | 2.50 
 | Prepared bulkhead 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 03-14-2012 
 | 2.50 
 | Prepared parts for bulkhead 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 03-13-2012 
 | 2.50 
 | Re-riveted Seat Floors and Ribs 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-12-2012 
 | 2.75 
 | Seat Ribs & Floors Riveted Backwards 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-11-2012 
 | 1.50 
 | Riveted seat ribs together 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-11-2012 
 | 1.50 
 | Cut seat hinges and prepared them and floors 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-10-2012 
 | 6.50 
 | Prepared and assembled seat rib assembly 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-09-2012 
 | 3.25 
 | Riveted Mixer Arm & Began Seat Ribs 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-08-2012 
 | 2.50 
 | Riveted Bearing Assembly & Parts Prep 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-07-2012 
 | 3.50 
 | Further baggage ribs and parts preparation 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-06-2012 
 | 3.00 
 | Riveted baggage floor skins 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-05-2012 
 | 2.50 
 | Riveted Baggage Floor 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-04-2012 
 | 1.00 
 | Finished Step 2 20-04 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 03-04-2012 
 | 3.50 
 | Began Section 21 with Spencer's help 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-03-2012 
 | 3.00 
 | Finished Inventory & Organizing 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 03-03-2012 
 | 6.50 
 | Begain contruction of center bulkhead 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-02-2012 
 | 3.50 
 | Continued Hardware Inventory 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 03-01-2012 
 | 3.75 
 | Fuselage Kit Arrives - Inventory Begun 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 02-12-2012 
 | 0.00 
 | Tested interior paint options (Part 2) 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 02-12-2012 
 | 0.50 
 | Tested interior paint options (Part 1) 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 02-12-2012 
 | 1.25 
 | Framed worktable 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 12-29-2011 
 | 1.50 
 | Moved Wings from garage to storage unit for winter 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 12-17-2011 
 | 4.50 
 | Finished assembly of both flapperons 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 12-15-2011 
 | 2.50 
 | Riveting flapperon skins to spar 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 12-14-2011 
 | 3.00 
 | Continued to assemble the flapperon 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 12-13-2011 
 | 2.50 
 | Assembled actuation and pivot brackets 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 12-11-2011 
 | 6.00 
 | Fabricated actuation and pivot brackets and began 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 12-10-2011 
 | 5.00 
 | More deburring and priming of flapperon parts 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 12-07-2011 
 | 2.50 
 | More deburring and priming of flapperon skins 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 12-06-2011 
 | 2.00 
 | Removed vinyl and began deburing nose and trailing 
 |  | 
	|     | 
	| 
 | 
	
	| 12-05-2011 
 | 2.00 
 | More priming and prep of the flapperon nose skins 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 12-04-2011 
 | 1.50 
 | Finished preparing flapperon ribs 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 12-04-2011 
 | 0.00 
 | 9" Band Saw 
 |  | 
	|      | 
	| 
 | 
	
	| 12-04-2011 
 | 0.00 
 | 6" Drill Press 
 |  | 
	|      | 
	| 
 | 
	
	| 12-03-2011 
 | 3.00 
 | Put wings on stand and begain deburring flapperon 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 12-01-2011 
 | 2.00 
 | Completed intallation of wing root electrical conn 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 11-30-2011 
 | 2.00 
 | Began working on new wing electical interconnecto 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 11-28-2011 
 | 3.00 
 | Finished installing wing tip lights 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 11-27-2011 
 | 2.00 
 | Begain working on the flapperon actenuators 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 11-27-2011 
 | 1.00 
 | Applied resin/flox mixture to wing tip extensions 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 11-26-2011 
 | 1.00 
 | Practised making up flox/epoxy mixture 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 11-26-2011 
 | 3.50 
 | Match drilled wing tip extensions and worked on el 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 11-25-2011 
 | 1.50 
 | Trimmed and filed W-1222-R/L wing extensions 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 11-24-2011 
 | 2.75 
 | Completed riveting final right wing tip sheets 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 11-22-2011 
 | 2.00 
 | Completed deburing, filing and priming W-1204D-R f 
 |  | 
	|     | 
	| 
 | 
	
	| 11-20-2011 
 | 3.50 
 | Right wing doubler and wing tip 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 11-20-2011 
 | 2.00 
 | Cut openings for wing tip lights 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 11-19-2011 
 | 2.50 
 | Right wing leading edge skin 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 11-19-2011 
 | 2.50 
 | Right wing landing light. 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 11-18-2011 
 | 2.00 
 | Riveted several right wing tip parts 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 11-17-2011 
 | 2.50 
 | Deburred and primed skins and parts for right wing 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 11-16-2011 
 | 0.00 
 | Molex crimp tool 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 11-16-2011 
 | 2.00 
 | Finished riveting last main skin to right wing 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 11-15-2011 
 | 2.75 
 | Attached final main skins on right wing 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 11-13-2011 
 | 7.00 
 | Finished riveting bottom skins and begain working 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 11-12-2011 
 | 4.00 
 | Almost completed right wing bottom skin riveting 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 11-11-2011 
 | 3.00 
 | Continued working on bottom right wing skins 
 |  | 
	|       | 
	| 
 | 
	
	| 11-10-2011 
 | 1.50 
 | Prepared, primed and clecoed inboard skin to right 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 11-09-2011 
 | 2.00 
 | Finished landing light ribs 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 11-08-2011 
 | 2.50 
 | Worked on Landing Light brackets and wiring 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 11-06-2011 
 | 6.00 
 | Began lighting kit installation for right wing 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 11-05-2011 
 | 0.50 
 | Finsihed Riveting Nose Ribs on Rgiht Wing 
 |  | 
	|      | 
	| 
 | 
	
	| 11-05-2011 
 | 4.50 
 | Built EAA Wing Stand 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 11-03-2011 
 | 2.50 
 | Riveted most of ribs to right wing spar 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 11-02-2011 
 | 2.50 
 | Began Assembly of Right Wing 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 11-01-2011 
 | 2.50 
 | Essentially Finished Left Wing - need to install w 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 10-29-2011 
 | 5.00 
 | Riveting more of left wing and prepared additional 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 10-28-2011 
 | 3.00 
 | Began Assembling / Riveting the left wing tip part 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 10-27-2011 
 | 2.00 
 | Finished left wing doubler and began working on wi 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 10-26-2011 
 | 1.50 
 | Finished riveting top skins to left wing and began 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 10-25-2011 
 | 2.00 
 | Riveted most of remaining top skins to left wing 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 10-19-2011 
 | 2.50 
 | Clecoed last of the large skins to the left wing 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 10-18-2011 
 | 2.25 
 | Riveted W-1201B-L and begain preparing last two la 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 10-16-2011 
 | 5.00 
 | Riveted last skin to bottom of left wing and attac 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 10-15-2011 
 | 3.50 
 | Prepared W-1202-L skin 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 10-14-2011 
 | 3.00 
 | Riveted W-1203-L skin to left wing and began prep 
 |  | 
	|       | 
	| 
 | 
	
	| 10-13-2011 
 | 2.50 
 | Riveted W-1201-L skin to left wing 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 10-11-2011 
 | 2.50 
 | Finished priming and clecoed first skin to left wi 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 10-10-2011 
 | 3.50 
 | Preparing first two left wing skins 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 10-09-2011 
 | 1.00 
 | Tested fit of 1202-L skin and stall warning assemb 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 10-08-2011 
 | 4.50 
 | Installed Stall Warning Sub-Assembly and wiring fo 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 10-07-2011 
 | 3.00 
 | Completed riveting ribs to Left Wing 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 10-05-2011 
 | 2.50 
 | Attached Aft Ribs to Left Spar 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 10-02-2011 
 | 6.00 
 | Finished Fluting, Priming and began riveting aft r 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 10-01-2011 
 | 4.00 
 | Finsihed scuffing and cleaning deburred aft ribs 
 |  | 
	|     | 
	| 
 | 
	
	| 09-29-2011 
 | 1.75 
 | Scuffed all the right aft ribs 
 |  | 
	|     | 
	| 
 | 
	
	| 09-25-2011 
 | 1.00 
 | Finished deburring Aft Ribs 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 09-24-2011 
 | 2.50 
 | Contined Deburring Aft Ribs 
 |  | 
	|     | 
	| 
 | 
	
	| 09-20-2011 
 | 2.00 
 | Continued deburing aft ribs 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 09-18-2011 
 | 2.50 
 | More deburring of Aft Ribs 
 |  | 
	|       | 
	| 
 | 
	
	| 09-17-2011 
 | 2.50 
 | Deburring of Aft Ribs 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-15-2011 
 | 0.50 
 | Deburred several aft ribs 
 |  | 
	|     | 
	| 
 | 
	
	| 09-14-2011 
 | 1.50 
 | Trimmed flanges and deburred aft ribs 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 09-08-2011 
 | 1.25 
 | Added nutplates to nose ribs 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-07-2011 
 | 1.25 
 | Finished Fluting and Priming Nose Ribs 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-06-2011 
 | 2.00 
 | Flute and prime most nose ribs 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-05-2011 
 | 2.50 
 | Cleaned all nose ribs with acetone and began to fl 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 09-04-2011 
 | 4.00 
 | Finished deburing and skuffed up all the ribs for 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 09-03-2011 
 | 6.00 
 | Rib deburing 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-02-2011 
 | 2.75 
 | Deburred several 1208R nose ribs 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 09-01-2011 
 | 0.30 
 | Riveted Rear Spar per section 14 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 09-01-2011 
 | 1.50 
 | Begain preparing nose ribs 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-31-2011 
 | 1.75 
 | Deburing and primed both rear spar webs 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-30-2011 
 | 1.50 
 | Riveted hinge brackets and began to debur spar 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 08-29-2011 
 | 1.00 
 | Countersunk and primed hinge brackets 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 08-28-2011 
 | 0.50 
 | Replacement hinge bracket parts prep 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 08-18-2011 
 | 3.00 
 | Riveting of Hinge Assembly and Hinge Brackets 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-17-2011 
 | 3.50 
 | More Section 14 parts prep and priming 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-16-2011 
 | 1.75 
 | Prepared L/R Sub Spar Assembly pieces 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-14-2011 
 | 0.50 
 | Pulled parts for section 14 and cleaned up workspa 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-14-2011 
 | 2.50 
 | Completed riveting attach angles to spars in secti 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-14-2011 
 | 1.50 
 | Built mini stand to hold wing spars in place for c 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-13-2011 
 | 4.75 
 | Began spar assembly 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-12-2011 
 | 3.00 
 | Completed fulll inventory and parts storage 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-10-2011 
 | 1.50 
 | Day 2 unpacking wing crates and inventory of parts 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-09-2011 
 | 1.60 
 | Began to unpack wings crates 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 08-01-2011 
 | 0.00 
 | Visit to AirVenture 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 07-08-2011 
 | 3.00 
 | Finished preparing and riveted tips to rudder and 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 07-07-2011 
 | 1.50 
 | Removed material from R-1206 & VS-1213 tips 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 07-04-2011 
 | 1.00 
 | Hung completed tailcone to garage ceiling 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 07-04-2011 
 | 2.00 
 | Completed Trim/Servo Assembly 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 07-03-2011 
 | 1.00 
 | Prepared parts for Trim/Servo assembly 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 07-02-2011 
 | 2.50 
 | Clecoed and riveted topskin to tailcone 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 07-02-2011 
 | 2.00 
 | Added spade connectors to the leads from servo 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 07-01-2011 
 | 1.50 
 | Match drilled and prepared top tailcone skin 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 06-24-2011 
 | 3.25 
 | Riveted F1280 and F1279 L/R skins to frame 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 06-24-2011 
 | 1.00 
 | Completed static system - attached tubes 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 06-19-2011 
 | 0.50 
 | Primed inner surface of F-1279 L/R skins 
 |  | 
	|       | 
	| 
 | 
	
	| 06-19-2011 
 | 1.50 
 | Assembled servo tray 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 06-18-2011 
 | 1.00 
 | Riveted nutplates to F12106  Fwd Skin Rib 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 06-18-2011 
 | 2.50 
 | Began preping the parts for the AST attachment 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 06-18-2011 
 | 2.00 
 | Began preping the 1279 L/R skins for tailcone 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 06-17-2011 
 | 3.00 
 | Trim wire and static system install 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 06-17-2011 
 | 1.00 
 | Clecoed F-1280 R/L to tailcone 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 06-17-2011 
 | 1.00 
 | Began prep of snap bushing bracket and F-12106 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 06-16-2011 
 | 2.50 
 | Prepared 1280 L R Side Skins 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 06-12-2011 
 | 2.00 
 | Riveted aft hinge and aft skins to stabilator 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 06-12-2011 
 | 1.50 
 | Measured and glued washers for F-1211 assembly to 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 06-12-2011 
 | 0.50 
 | Clecoed F-1211 assemble to the tailcone 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 06-11-2011 
 | 4.50 
 | Assembled and riveted skins to stabilator skeleton 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 06-10-2011 
 | 1.50 
 | Drilled and deburred stab hinges 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 06-09-2011 
 | 1.00 
 | Began working on replacement AST hinges 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 06-08-2011 
 | 3.00 
 | Riveted bottom and side skins on tailcone 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 06-07-2011 
 | 1.25 
 | Primed 1281 L/R tail skins 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 06-06-2011 
 | 0.00 
 | Confirmation from FAA on tail number reservation 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 06-06-2011 
 | 3.50 
 | Clecoed bottom skins and began working on 1281 L/R 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 06-05-2011 
 | 1.75 
 | Began working on bottom tail skins 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 06-05-2011 
 | 5.00 
 | Assembled and riveted bulkhead 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 06-04-2011 
 | 2.00 
 | Prepared bulkhead and other parts. 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 06-03-2011 
 | 1.50 
 | Prepared bulkhead doubler - primed and painted par 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 06-02-2011 
 | 2.50 
 | Riveted fuselage and fabricated skid bracket 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-30-2011 
 | 4.00 
 | Began working on tailcone 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-30-2011 
 | 1.00 
 | Added lead weights to counterbalance arm 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-28-2011 
 | 0.50 
 | Stored stabilator parts in overhead loft 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 05-27-2011 
 | 2.00 
 | Prepared Stabilator Skins 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-27-2011 
 | 8.00 
 | Assembled Stabilator Skeleton Assembly 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-24-2011 
 | 3.00 
 | HS-1203 spar arrived - completed steps passed over 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-23-2011 
 | 0.00 
 | Torque wrench arrived from Sears 
 |  | 
	|      | 
	| 
 | 
	
	| 05-22-2011 
 | 5.00 
 | Deburred, primed ribs and began preping parts for 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-21-2011 
 | 1.50 
 | Sourced ribs for spar and began deburing them 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-20-2011 
 | 2.50 
 | Riveted spar and began adding nutplates 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-19-2011 
 | 3.00 
 | Primed and began assembling spar 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-18-2011 
 | 3.00 
 | Began preparing stabilizer spar parts 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-17-2011 
 | 0.50 
 | Organized parts for stabilizer spar 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 05-14-2011 
 | 0.00 
 | Hillary learning to build an airplane! 
 |  | 
	|       | 
	| 
 | 
	
	| 05-14-2011 
 | 4.50 
 | Finished right and left ASTs 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-13-2011 
 | 1.00 
 | Removed plastic and preped anti-servo tab parts 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-11-2011 
 | 2.00 
 | Finished Rudder 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-10-2011 
 | 3.50 
 | Measured rudder to V-stab & primed frame 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-09-2011 
 | 2.50 
 | Began work on rudder 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-08-2011 
 | 0.00 
 | Vertical Stablizer (some more pictures) 
 |  | 
	|       | 
	| 
 | 
	
	| 05-08-2011 
 | 6.00 
 | Finished Vertical Stabilizer 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-07-2011 
 | 0.00 
 | Went Flying - finished biannual in N9081H (C172) 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 05-06-2011 
 | 0.00 
 | Hand rivet squeezer 
 |  | 
	|      | 
	| 
 | 
	
	| 05-05-2011 
 | 4.00 
 | Primed and riveted V-frame structure 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-04-2011 
 | 0.20 
 | Reserved N number 
 | Details 
 | 
	|     | 
	| 
 | 
	
	| 05-03-2011 
 | 3.50 
 | Spar Cap deburring, countersink & priming 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-02-2011 
 | 3.50 
 | First day building - hinge bracket and spar cap 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 05-01-2011 
 | 1.50 
 | Built framed screen for painting 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 04-30-2011 
 | 3.50 
 | Unpack / Inventory parts 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 04-29-2011 
 | 1.50 
 | Updated garage workshop - lights, bins 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 04-29-2011 
 | 2.00 
 | Began to unpack kit #1 from Vans crate 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 04-28-2011 
 | 0.00 
 | Tail kit arrives from Fed Ex 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 04-27-2011 
 | 0.00 
 | Workshop Overview 
 | Details 
 | 
	|       | 
	| 
 | 
	
	| 04-18-2011 
 | 0.00 
 | Pneumatic rivet puller 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 04-18-2011 
 | 0.50 
 | Ordered RV-12 Kit from Vans 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 04-18-2011 
 | 0.00 
 | Favorite deburring tools 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 11-16-2010 
 | 0.00 
 | Rivet gun 
 | Details 
 | 
	|      | 
	| 
 | 
	
	| 11-16-2010 
 | 0.00 
 | Air drill 
 |  | 
	|      | 
	| 
 | 
	
	| 10-15-2010 
 | 0.00 
 | Kobalt Compressor 
 | Details 
 | 
	|       |