Date:  12-15-2013
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Misc Final PA items

Added safety wire to the carb cables which were adjusted last week as part of the balancing.

Topped up the coolant reservoir.

Tested the pitot tube/airspeed system per plans. Needed to fabricate some clear tubes with a syringe. Perfect test. Virtually no leaks and a very slow decline in the indicated airspeed. Will need to test the static system (didn't have any putty on had to do that today)

Installed N913BC decal onto the vertical stab.
' style=

Added safety wire to throttle cable carb attachments

Added safety wire to throttle cable carb attachments

' style=

Added 3

Added 3" numbers to v-stab.

' style=

Performed pitot pressure test

Performed pitot pressure test