KitLog pro

Powered By Kitlog Pro v2.0

Brent Connelly - N913BC
' style=
Date:  3-16-2012
Number of Hours:  3.50
Manual Reference:  21-08 to 21-10
Brief Description:  Riveted Floors to Mid Fuse and worked on bulkhead

Riveted the floor assembly to the mid fuselage tonight. Not too difficult riveting the ribs from the bottom channel. Also riveted the cap and two upright brackets that will hold the wings in place. Then got going on assembly of the bulkhead brackets with the bearing. One of the two is not as loose moving as the other but I don't think this will be problem once fully installed. Finally began assembling the other parts to the fuselage

Will need to go and fit the two wing recepticals to the wings themselves tomorrow (down in the storage locker)
' style=

Underside of fuselage

Underside of fuselage

' style=

Caps riveted to mid fuse

Caps riveted to mid fuse

' style=

Assembled bracket with bearing

Assembled bracket with bearing

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.