KitLog pro

Powered By Kitlog Pro v2.0

Brent Connelly - N913BC
' style=
Date:  3-24-2012
Number of Hours:  2.50
Manual Reference:  21-17 to 21-18
Brief Description:  Prepared bulkhead and installed steps

Worked on various attach angles and nutplates to install the steps on the step bulkhead. Slow going but pleased with results. Removed both steps per instructions and can install them later. Will also need to fill in the gap on each step per plans, but again can get to that later.
' style=

Temporarily Installed Steps

Temporarily Installed Steps

' style=

Left Step

Left Step

' style=

Right Step

Right Step

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.