Brief Description: Prepared bulkhead and installed steps
Worked on various attach angles and nutplates to install the steps on the step bulkhead. Slow going but pleased with results. Removed both steps per instructions and can install them later. Will also need to fill in the gap on each step per plans, but again can get to that later.