KitLog pro

Powered By Kitlog Pro v2.0

Brent Connelly - N913BC
' style=
Date:  5-2-2012
Number of Hours:  1.50
Manual Reference:  24-04
Brief Description:  Match drilled shear clips to Baggage Bulkheads

Spencer and Patrick helped take the tailcone down from the storage position hanging to the top of the garage tonight. Clecoed the baggage bulkheads to the tail and drilled the shear clips. Tail was very dusty from hanging up in the garage since last summer.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.