Date:  10-2-2011
Number of Hours:  6.00
Manual Reference:  15-03
Brief Description:  Finished Fluting, Priming and began riveting aft r

Long day but necessary to finish preparing the aft ribs. Flutting and priming too most of the time. After completing all of them, organized garage and began attaching some of the doubler and hinge brackets. Did some match drilling and a little riveting. Finally finsihed page 15-03!

Later in the week will probably prime some of the spar/rib attachments (that came unprimed from Vans) before attaching the aft ribs to the left spar.
' style=

Completed 26 aft ribs today

Completed 26 aft ribs today

' style=

Hinge Bracket Assembly match drilled to aft rib

Hinge Bracket Assembly match drilled to aft rib

' style=

Riveted doubler to two of the aft ribs

Riveted doubler to two of the aft ribs

' style=