KitLog pro

Powered By Kitlog Pro v2.0

Brent Connelly - N913BC
' style=
Date:  10-7-2012
Number of Hours:  4.00
Manual Reference:  32-11
Brief Description:  Install rudder cable & built rigging stop

Installed the rudder cable plastic sleeve into the fuselage with the four additional and two existing cushion clamps. Very time consuming as the work is done in a very small space. Fed the cables back into the tailcone and then wired the plastic sleeve to the cable end.

Built the Rudder Pedal Rigging Stop. Will now need to install the rudder to complete the install.
' style=

Rudder Cable plastic sleeve near control column.

Rudder Cable plastic sleeve near control column.

' style=

Rudder Pedal Rigging Stop

Rudder Pedal Rigging Stop

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.