KitLog pro

Powered By Kitlog Pro v2.0

Brent Connelly - N913BC
' style=
Date:  6-18-2011
Number of Hours:  2.50
Manual Reference:  11-05
Brief Description:  Began preping the parts for the AST attachment

Moved ahead in plans to prepare several of parts for the AST attachment. Separated, deburred, skuffed and primed all of them. No problems.

Doublers - needed to hammer them flat. Seem reasonably flat given the crude method employed.

F1287 J and A separated and preped.

F1287 D Left and Right

And cut the 5/16" tubing to the two lengths specified. Used tub cutter and scotchbrite wheel to fine tune the lenghts. Seem right on.
' style=

Misc attachment parts

Misc attachment parts

' style=

Doublers

Doublers

' style=

Primed everything

Primed everything

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.