KitLog pro

Powered By Kitlog Pro v2.0

Brent Connelly - N913BC
' style=
Date:  11-3-2012
Number of Hours:  3.50
Manual Reference:  34-15
Brief Description:  Layup of top fairing

After losing most of this week due to Hurricane Sandy (lost power for three days but no major damage) managed to get back to the fairing layup today. Added the top section and also mixed up some epoxy/microballoon mixture and filled in some of the low spots on the previous side layups.
' style=

Mid way through the top fairing layup

Mid way through the top fairing layup

' style=

Added peel ply to the top fairing to aid in sanding later

Added peel ply to the top fairing to aid in sanding later

' style=

Added microballoon/epoxy mixture to each side of the fairing

Added microballoon/epoxy mixture to each side of the fairing

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.