KitLog pro

Powered By Kitlog Pro v2.0

Brent Connelly - N913BC
' style=
Date:  4-20-2012
Number of Hours:  1.50
Manual Reference:  24-03
Brief Description:  Final riveted roll bar to fuselage

Spencer helped install the rollbar assemble to the fuselage. Used some boelube and install was snug but really slid on easily. Riveted the rollbar to the brackets and am considering doing some touch up painting to cover the rivet heads with the interior grey color at some point.

Pulled parts for next section I will work on - rudder/break petals.
' style=

Rollbar/fuselage covered in plastic

Rollbar/fuselage covered in plastic

' style=

Pulled parts for petal assembly

Pulled parts for petal assembly

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.