KitLog pro

Powered By Kitlog Pro v2.0

Brent Connelly - N913BC
' style=
Date:  5-24-2013
Number of Hours:  6.00
Manual Reference:  49-02 to 49-06
Brief Description:  Installed cooling door and oil tank

Fabricated the stainless steel hinge pieces and the longer hinge pin. Deburred and installed hinge to cooler door and deburred / primed the brackets for the door assembly. Installed the door and applied RTV sealant per plans. Waiting on that to set up before finishing the door and radiator install.

Installed the oil tank per plans and fabricated the vent tube. Installed the tube and needed to add a clamp to one of the bolts holding the gascolator in place. Tight place to work. Began working on the install of the coolant overflow tank
' style=

Tape holding door closed as RTV sealant sets up

Tape holding door closed as RTV sealant sets up

' style=

Oil tank installed

Oil tank installed

' style=

Drain tube for fuel pump and oil tank vent

Drain tube for fuel pump and oil tank vent

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.