Brief Description: Installed cooling door and oil tank
Fabricated the stainless steel hinge pieces and the longer hinge pin. Deburred and installed hinge to cooler door and deburred / primed the brackets for the door assembly. Installed the door and applied RTV sealant per plans. Waiting on that to set up before finishing the door and radiator install.
Installed the oil tank per plans and fabricated the vent tube. Installed the tube and needed to add a clamp to one of the bolts holding the gascolator in place. Tight place to work. Began working on the install of the coolant overflow tank