KitLog pro

Powered By Kitlog Pro v2.0

Brent Connelly - N913BC
' style=
Date:  3-28-2012
Number of Hours:  3.50
Manual Reference:  22-02 to 22-03
Brief Description:  Began assembly and additonal parts prep

Continued preparing additional small parts along with corner skins and then began attaching nutplates to various sections. Managed to begin full assembly of the fwd fuselage late in the evening and all of a sudden, its looking like the front section fo the cabin (almost). Had to drill out several nutplates that I installed incorrectly. This section is more confusing than it looked and I need to take it slow to avoid mistakes.
' style=

Nutplates being installed on tunnel assembly

Nutplates being installed on tunnel assembly

' style=

Tunnel assembly, bottom firewall skin and floor coming together

Tunnel assembly, bottom firewall skin and floor coming together

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.