KitLog pro

Powered By Kitlog Pro v2.0

Brent Connelly - N913BC
' style=
Date:  8-10-2011
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Day 2 unpacking wing crates and inventory of parts

Continued unpacking the wing kit - completed that and broke down the largest crate. Also began doing the inventory by sub-kit, getting through the first five of them.

Only concern is that I found moisture - actually a fair about of water soaked into the cardboard in the bottom of the large crate. I thought I felt some moisture in some of the packing paper last night. I didn't find any damage as only some of the aluminum sheets were affected. The lighting kit box was not affected. I'll write a note to Vans and report it. They used ABF freight this time.
' style=

Misc parts

Misc parts

' style=

Wing skins

Wing skins

' style=

Moisture in large crate soaked into some of the cardboard

Moisture in large crate soaked into some of the cardboard

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.