KitLog pro

Powered By Kitlog Pro v2.0

Brent Connelly - N913BC
' style=
Date:  3-26-2012
Number of Hours:  0.50
Manual Reference:  21-20
Brief Description:  Finished section 21

Installed six bolts in fuselage with Spencer helping. Needed to buy a 6mm deep socket set in order to install them. Two of the nuts needed to be tapped as they were just too tight to install.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.