KitLog pro

Powered By Kitlog Pro v2.0

Brent Connelly - N913BC
' style=
Date:  5-10-2011
Number of Hours:  3.50
Manual Reference:  07-03 to 07-04
Brief Description:  Measured rudder to V-stab & primed frame

Not as productive a night as hoped. First measured the rudder spar against the v-stabilizer and tried to figure out how many washers would be needed to hold it in there firmly per manual. Took a lot longer than I thought as the washers were not easy to insert. Eventually got a great fit.

Primed and started riveting the spar, but had some difficulty getting the AN470 rivets to squeeze as well as I wanted. Ended up drilling out three of them, but rest seemed acceptable. Not a perfect job, but good enough. Starting using the Cleveland squeezer for first time and I might need more practise. Still a much better tool than the cheap one I was using up to now.

After riveting the hinge brackets to the spar I fear that I reversed them - so they might not fit exactly to the v-stabilizer with the washers I had measured out earlier. So, eventually attaching it to the v-tail might be a little more challenging down the road. I think I'll re-attach it tomorrow night to confirm the washers are correct.

Ran out of time tonight, but should have no problem finishing up rudder tomorrow.
' style=

Frame parts and inside skin primed

Frame parts and inside skin primed

' style=

Began rivited frame together

Began rivited frame together

' style=

Acceptable rivets, not perfect

Acceptable rivets, not perfect

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.