KitLog pro

Powered By Kitlog Pro v2.0

Brent Connelly - N913BC
' style=
Date:  3-22-2012
Number of Hours:  3.50
Manual Reference:  21-16
Brief Description:  Prepared and clecoed bottom skin to fuselage

Long but productive evening doing all the prep work on the bottom skin ending up with it being clecoed to the fuselage structure. Lots of deburing which took time and used blue painter's tape to isolate the places on the bottom surface that needed to be primed. (see second picture). All the ten triangle shaped doublers are to be attached to the outside surface of the bottom skin so all those places needed priming. Also primed the bottom edge of both corner skin sections where the bottom skin is riveted. Pleased with results.
' style=

Primed inside surface of bottom skin

Primed inside surface of bottom skin

' style=

Nutplated installed on five access ports

Nutplated installed on five access ports

' style=

Initial clecoing of skin to fuselage

Initial clecoing of skin to fuselage

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.