KitLog pro

Powered By Kitlog Pro v2.0

Brent Connelly - N913BC
' style=
Date:  11-2-2011
Number of Hours:  2.50
Manual Reference:  15-06
Brief Description:  Began Assembly of Right Wing

Decided to begin assembly of the right wing and then do the wing tip lighting on both wings at the same time.

Riveted most of the aft ribs to the main spar tonight. Hopefully will move pretty fast on this wing given that the left wing is still fresh in my mind.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.