KitLog pro

Powered By Kitlog Pro v2.0

Brent Connelly - N913BC
' style=
Date:  10-28-2012
Number of Hours:  3.25
Manual Reference:  34-14
Brief Description:  Began layup of canopy fairing left and right sides

Epoxy glassed the sides of the fairing today. Used the black dye in the epoxy per internet tip. Overall, pleased with the work. Looks like there are places above and below the foam on the arms that are sunken in just a little where I'll need to add some epoxy/microballoon mixture to fill when this is all done.

Will wait for this to dry and then begin working on the strip across the top of the canopy.
' style=

Right side after two glass sheets

Right side after two glass sheets

' style=

Left after two sheets

Left after two sheets

' style=

Completed and peel ply attached

Completed and peel ply attached

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.