Date
|
Hours
|
Work Log Summary

|
Details

|
04-07-2013
|
6.0
|
Engine mount picture and Prop.
|
Details
|
 |
|
04-06-2013
|
4.0
|
Mounting Engine
|
Details
|
|
|
04-02-2013
|
8.0
|
Windscreen
|
Details
|
|
|
03-31-2013
|
6.0
|
Demister and Front Windscreen
|
Details
|
|
|
03-29-2013
|
3.0
|
Panel wiring
|
Details
|
|
|
03-29-2013
|
2.0
|
Demister Fan Installation, working seats for insid
|
Details
|
|
|
03-29-2013
|
3.0
|
Brake lines to brakes
|
Details
|
|
|
03-24-2013
|
8.0
|
Upper Fuslage attached
|
Details
|
|
|
03-23-2013
|
8.0
|
Construcion of Avionics Bench mockup
|
Details
|
|
|
03-16-2013
|
8.0
|
Door Windows
|
Details
|
|
|
03-12-2013
|
2.0
|
Right rear window
|
Details
|
 |
|
03-10-2013
|
8.0
|
Cutting the windows and fitting
|
Details
|
|
|
03-09-2013
|
8.0
|
Fit FPE Panel to airframe
|
Details
|
|
|
03-05-2013
|
0.0
|
Panel has Arrived
|
Details
|
|
|
03-02-2013
|
8.0
|
Creating the Mounting strip for Milspec Fasteners
|
Details
|
|
|
02-24-2013
|
8.0
|
Cabin Cover Mounted
|
Details
|
|
|
02-22-2013
|
2.0
|
Panel Express: Updated!!!
|
Details
|
  |
|
02-17-2013
|
8.0
|
Avionics trays and cowl strips
|
Details
|
|
|
01-31-2013
|
2.0
|
First of the panel printouts
|
Details
|
 |
|
01-27-2013
|
4.0
|
Front seat side panels
|
Details
|
|
|
01-12-2013
|
8.0
|
Front side internal panels
|
Details
|
 |
|
01-09-2013
|
0.0
|
Rear seat foams
|
Details
|
|
|
01-06-2013
|
3.0
|
Servos for Cabin Heat
|
Details
|
|
|
01-05-2013
|
6.0
|
Cabin Roof - Headlining Upholstery
|
Details
|
|
|
12-30-2012
|
6.0
|
Doors - Upholstery
|
Details
|
|
|
12-28-2012
|
3.0
|
Investigation - Avionics switches
|
Details
|
|
|
12-27-2012
|
4.0
|
New Grips and Cabin Doors
|
Details
|
|
|
12-26-2012
|
6.0
|
Fixing Doors ready for covering
|
Details
|
|
|
12-24-2012
|
4.0
|
Magnetometer Shelf - Tailcone
|
Details
|
|
|
12-23-2012
|
8.0
|
Overhead Console - Reforming and sanding
|
Details
|
|
|
12-18-2012
|
4.0
|
Overhead Console - Sanding
|
Details
|
|
|
12-16-2012
|
8.0
|
Overhead Console - Forming
|
Details
|
|
|
12-09-2012
|
2.0
|
Overhead Console - design and manufacture
|
Details
|
|
|
11-25-2012
|
8.0
|
Engine Baffling
|
Details
|
|
|
11-24-2012
|
4.0
|
Aileron Trim
|
Details
|
 |
|
11-17-2012
|
8.0
|
Passenger seats down, rear seatbelt passthrough in
|
Details
|
|
|
11-11-2012
|
8.0
|
Baggage area down, some wiring secured
|
Details
|
|
|
11-10-2012
|
8.0
|
Wiring runs from tailcone to panel
|
Details
|
|
|
10-30-2012
|
8.0
|
Rearrange workshop, engine mount and front wheels
|
Details
|
|
|
10-29-2012
|
4.0
|
Wheel mounting hardware
|
Details
|
|
|
10-28-2012
|
4.0
|
Assembly of the wheels
|
Details
|
|
|
10-27-2012
|
4.0
|
Correcting Front Wheel and Wheel assembly
|
Details
|
|
|
10-27-2012
|
4.0
|
Correcting Front Wheel and Wheel assembly
|
Details
|
|
|
10-13-2012
|
5.0
|
Door Struts
|
Details
|
|
|
09-29-2012
|
8.0
|
Adjusting Doors for McMaster Seals
|
Details
|
|
|
09-25-2012
|
2.0
|
Firewall Forward Stuff arrives
|
Details
|
|
|
09-23-2012
|
3.0
|
Pull down spray booth
|
Details
|
|
|
09-23-2012
|
12.0
|
Fitting of the doors to the Cabin top.
|
Details
|
|
|
09-16-2012
|
12.0
|
PlaneAround Door Latch
|
Details
|
|
|
09-09-2012
|
12.0
|
Mounting and trimming the doors
|
Details
|
|
|
09-09-2012
|
4.0
|
Door Handles pre-assembly
|
Details
|
|
|
09-02-2012
|
5.0
|
Right Hand Door PLUS Navs and strobes
|
Details
|
|
|
09-01-2012
|
5.0
|
Left Hand Door Epoxying 2 halves
|
Details
|
|
|
08-25-2012
|
4.0
|
Canope and glassing
|
Details
|
|
|
08-19-2012
|
4.0
|
Glassing the Overhead Consol.
|
Details
|
|
|
08-12-2012
|
4.0
|
Preparing the doors
|
Details
|
|
|
08-11-2012
|
4.0
|
Overhead Consol
|
Details
|
|
|
07-01-2012
|
4.0
|
Cabin Countersinking, Pitch Servo installation
|
Details
|
  |
|
06-23-2012
|
6.0
|
Canope Flanges
|
Details
|
|
|
06-17-2012
|
4.0
|
Canope bolt fitting
|
Details
|
  |
|
06-09-2012
|
8.0
|
Canope trimming
|
Details
|
  |
|
06-05-2012
|
0.0
|
Car got banged Up
|
Details
|
|
|
06-03-2012
|
4.0
|
Triming of Canope
|
Details
|
|
|
06-02-2012
|
8.0
|
Workshop Reorganisation
|
Details
|
|
|
05-27-2012
|
6.0
|
Duckworks lights lense fiting
|
Details
|
|
|
05-26-2012
|
6.0
|
Wingtip Lenses
|
Details
|
|
|
05-20-2012
|
4.0
|
AOA Installation
|
Details
|
|
|
05-19-2012
|
8.0
|
Wing Tips
|
Details
|
|
|
05-13-2012
|
16.0
|
AP Servo installation and Right Wing Skin
|
Details
|
 |
|
05-11-2012
|
1.0
|
AOA and Autopilot
|
Details
|
|
|
05-06-2012
|
4.0
|
Left Wing Tip
|
Details
|
|
|
04-29-2012
|
10.0
|
Closing up wings
|
Details
|
 |
|
04-21-2012
|
4.0
|
Constructed AOA path through right wing
|
Details
|
 |
|
04-15-2012
|
8.0
|
Stall warning
|
Details
|
|
|
04-14-2012
|
2.0
|
Finishing off pitot line
|
Details
|
|
|
04-09-2012
|
8.0
|
Fitting Gretz Pitot
|
Details
|
|
|
04-08-2012
|
8.0
|
Fit Conduit to wings
|
Details
|
|
|
04-01-2012
|
2.0
|
Mounting of Lights
|
Details
|
|
|
04-01-2012
|
6.0
|
Bell Cranks and Aileron
|
Details
|
|
|
03-31-2012
|
8.0
|
Flap Seals, Control Rods,
|
Details
|
|
|
03-29-2012
|
0.0
|
More Engine photos... with the chrome!!!
|
Details
|
|
|
03-27-2012
|
3.0
|
Duckworks Lighting assembly
|
Details
|
 |
|
03-25-2012
|
10.0
|
Painting
|
Details
|
  |
|
03-20-2012
|
1.0
|
My Engine...
|
Details
|
 |
|
03-18-2012
|
8.0
|
Almost completed the Duckworks light installations
|
Details
|
|
|
03-17-2012
|
6.0
|
Duckworks lighting
|
Details
|
|
|
03-11-2012
|
2.0
|
Fuel Tank Sender Units
|
Details
|
|
|
03-10-2012
|
8.0
|
Fuselage up, Wings Down
|
Details
|
|
|
03-09-2012
|
8.0
|
Engine Colour
|
Details
|
|
|
02-19-2012
|
8.0
|
Engine and Paint
|
Details
|
|
|
02-12-2012
|
2.0
|
Under seat holes for Comms
|
Details
|
 |
|
02-11-2012
|
4.0
|
Fitting purge return line
|
Details
|
|
|
02-04-2012
|
8.0
|
Panel Pre-fabrication
|
Details
|
|
|
01-26-2012
|
4.0
|
Fuel Tubing to Firewall
|
Details
|
|
|
01-22-2012
|
4.0
|
Panel Design
|
Details
|
 |
|
01-21-2012
|
4.0
|
Fired up HID's
|
Details
|
|
|
01-07-2012
|
4.0
|
Tunnel Insulation
|
Details
|
|
|
01-05-2012
|
2.0
|
Engine purchase is complete
|
Details
|
|
|
12-30-2011
|
8.0
|
Installed Andair Extention
|
Details
|
|
|
12-26-2011
|
8.0
|
Test fitting of the seats
|
Details
|
|
|
12-17-2011
|
4.0
|
Pitot Tube installation
|
Details
|
|
|
12-04-2011
|
5.0
|
Andair Fuel Selector installation
|
Details
|
|
|
12-03-2011
|
4.0
|
Re-drilling Control Column and fit
|
Details
|
|
|
11-27-2011
|
3.0
|
Mock-up of panel
|
Details
|
|
|
11-26-2011
|
4.0
|
Creation of Control inserts
|
Details
|
 |
|
11-19-2011
|
10.0
|
Control Column Fitment
|
Details
|
|
|
10-29-2011
|
0.0
|
Holidays in Fiji
|
Details
|
|
|
10-08-2011
|
4.0
|
Access panel
|
Details
|
|
|
10-01-2011
|
4.0
|
Comm Antenna mounting plate
|
Details
|
 |
|
09-25-2011
|
10.0
|
Fitting of Rudder Pedals, Brakes, Fuel Pump and Fi
|
Details
|
|
|
09-17-2011
|
10.0
|
Finishing off and riveting down baggage area
|
Details
|
|
|
08-27-2011
|
8.0
|
Riveting down Floor Panels
|
Details
|
|
|
08-21-2011
|
10.0
|
Fittment of the Baggage Door
|
Details
|
|
|
08-04-2011
|
8.0
|
Completed conduit
|
Details
|
|
|
08-03-2011
|
4.0
|
Conduit runs for wiring
|
Details
|
|
|
08-02-2011
|
8.0
|
The actual attachment
|
Details
|
|
|
07-31-2011
|
2.0
|
Setting the tailcone ready for riveting
|
Details
|
|
|
07-09-2011
|
4.0
|
Getting Fuse down ready for joining
|
Details
|
|
|
07-03-2011
|
16.0
|
Tail cone almost complete
|
Details
|
|
|
06-24-2011
|
8.0
|
Final riveting of tail cone.
|
Details
|
|
|
06-19-2011
|
12.0
|
Riveting the tail cone
|
Details
|
|
|
06-16-2011
|
16.0
|
Parts cleaning and priming
|
Details
|
|
|
06-12-2011
|
16.0
|
Parts Dimpling
|
Details
|
 |
|
06-05-2011
|
16.0
|
Riveting and sealing the elevators
|
Details
|
|
|
06-02-2011
|
16.0
|
Tail cone construction, drilling and strip down
|
Details
|
|
|
05-29-2011
|
16.0
|
Drilling and cleco's
|
Details
|
|
|
05-26-2011
|
5.0
|
Starting the empennage
|
Details
|
|
|
05-22-2011
|
18.0
|
Cleaning, preping and priming
|
Details
|
|
|
05-15-2011
|
16.0
|
Deburring and dimpling
|
Details
|
  |
|
05-08-2011
|
4.0
|
Preparing elevator ribs
|
Details
|
 |
|
05-07-2011
|
16.0
|
Completing the HS
|
Details
|
|
|
04-30-2011
|
13.0
|
Painting and assembly of parts
|
Details
|
|
|
04-23-2011
|
30.0
|
Preparing HS
|
Details
|
|
|
04-17-2011
|
8.0
|
Riveted Rudder together
|
Details
|
|
|
04-10-2011
|
12.0
|
Riveting the VS together
|
Details
|
|
|
04-05-2011
|
16.0
|
Parts preparation and priming
|
Details
|
|
|
03-27-2011
|
8.0
|
Painting process - Primer
|
Details
|
|
|
03-20-2011
|
8.0
|
Spray Booth Setup
|
Details
|
|
|
02-06-2011
|
2.0
|
Started Horoizontal Stabiliser
|
Details
|
|
|
02-05-2011
|
10.0
|
Drilled, deburred, set edge
|
Details
|
 |
|
01-23-2011
|
11.5
|
Rudder
|
Details
|
|
|
01-22-2011
|
2.0
|
Preparation for priming
|
Details
|
|
|
01-16-2011
|
5.0
|
Match drilling and dimpling
|
Details
|
|
|
01-11-2011
|
8.0
|
Drilling and Deburring
|
Details
|
|
|
01-02-2011
|
2.0
|
Cutting first flanges
|
Details
|
|
|
12-30-2010
|
4.0
|
Vans Toolbox Practice Kit
|
Details
|
|
|
12-12-2010
|
5.0
|
Dimpling, Rivets and Workspace
|
Details
|
|
|
11-27-2010
|
12.0
|
Lift Fuselage and Wings and cleanout
|
Details
|
|
|
11-20-2010
|
8.0
|
Building and hanging Gantry
|
Details
|
|
|
10-24-2010
|
0.0
|
Backyard complete....
|
Details
|
|
|
09-26-2010
|
10.0
|
Shed and Empennage Kit
|
Details
|
|
|
09-19-2010
|
16.0
|
Shed and Wing Stand
|
Details
|
|
|
09-13-2010
|
12.0
|
THE KIT ARRIVES
|
Details
|
|
|
09-11-2010
|
16.0
|
Carport and garage continue
|
Details
|
|
|
09-06-2010
|
0.0
|
Garden and Carport moving along nicely
|
Details
|
|
|
08-20-2010
|
0.0
|
Re-Development of the garden and garage
|
Details
|
|
|
07-26-2010
|
5.0
|
Collecting tools required for build
|
Details
|
|
|
06-23-2010
|
0.0
|
Plans Arrived
|
Details
|
|
|
02-27-2010
|
10.0
|
Build Work Benches
|
Details
|
|