KitLog pro

Powered By Kitlog Pro v2.0

The RV-10 Dream
' style=
Date:  1-19-2014
Number of Hours:  24.00
Manual Reference:  
Brief Description:  Front and rear fairings

Over the course of the last two weekends I have been struggling (ie very fiddly) with completing the wheel spats.

Getting them to firstly align with the centreline of the aircraft, and then ensure they are aligned with each other.

Stingline.....plumbob....stringline measure.... re-measure....Stingline.....plumbob....stringline measure.... re-measure....Stingline.....plumbob....stringline measure.... re-measure....Stingline.....plumbob....stringline measure.... re-measure....Stingline.....plumbob....stringline measure.... re-measure....

ad nauseum...

I cut the holes maybe a little too big for the leg access, however given they will be covered should be fine. May need to glass them back again, however, not a bigissue.

In the end however, all created and aligned. Now to do the leg fairings and the fairing boots.
' style=

All three shoes

All three shoes

' style=

Left  :-)

Left :-)

' style=

Right spat

Right spat

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.