Powered By Kitlog Pro v2.0
306TD Web Site
RV-12is
All
Work Logs Found:
166
Category Work Time:
634 Hours
Date
Hours
Work Log Summary
Details
03-20-2022
0.25
Completed Service Directive SD-00001
Details
03-14-2022
0.25
Finished all but clevis pin
Details
03-13-2022
0.50
Started disassembly of Servo Motor for Service Dir
Details
03-12-2022
3.50
Tailcone Skin Stiffening Clips SB00053
Details
01-23-2022
1.50
Finishing Baggage Floor Cover
Details
01-15-2022
2.00
Started Preparing Baggage Floor Cover and Doubler
Details
01-08-2022
6.00
Completion of the Fuselage Kit and section 29iS
Details
01-01-2022
4.00
Attaching the Upper Forward Fuselage Skin
Details
12-30-2021
5.00
Battery Box and Sealing Firewall
Details
12-28-2021
4.00
Panel Shelf
Details
12-27-2021
4.00
Continuing the Upper Fwd Fuselage
Details
12-26-2021
6.00
Attaching the Upper Firewall Assembly
Details
12-24-2021
6.00
Continuing the Upper Firewall Assembly
Details
12-21-2021
4.00
Starting the Upper Firewall Assembly
Details
12-20-2021
8.00
Finish Rudder Pedals and Run Brake Lines
Details
12-19-2021
4.00
Continuing Rudder Pedals
Details
12-18-2021
2.00
Rudder Pedals
Details
11-28-2021
6.00
Complete Fuel Lines
Details
11-27-2021
3.00
Continuing Fuel Lines
Details
11-27-2021
3.00
Continuing Fuel Lines
Details
11-25-2021
5.00
Starting Fuel Lines
Details
11-22-2021
6.00
Seatbacks
Details
11-22-2021
2.00
Completed Seat Backs
Details
11-20-2021
2.00
Finish section 24iS
Details
11-20-2021
6.00
Completion of Section 24iS/U-05-06
Details
11-13-2021
2.00
Completing the Rollbar Assembly and Braces
Details
11-13-2021
2.00
Completing Rollbar
Details
11-13-2021
3.00
Completed Rollbar
Details
10-31-2021
4.00
Starting Rollover Structure
Details
10-31-2021
2.00
Complete section 23iS Side Skins
Details
10-30-2021
4.00
Finished Riveting Side Skins, installed Vents
Details
10-30-2021
2.00
Complete Vent Door Installation
Details
10-29-2021
6.00
Installing Side Skins
Details
10-28-2021
6.00
Making Skin Spar Cutouts and Prepping Side Skins
Details
10-27-2021
6.00
Longeron attachment and Arm Rests
Details
10-26-2021
6.00
Mid Fuse Brace
Details
10-25-2021
6.00
Start Side Skin Section - Longerons
Details
10-24-2021
3.00
Prepped new F-01272-1 and Fwd Lower Fuse
Details
10-24-2021
3.00
Complete section 22is
Details
10-10-2021
2.00
Starting the Fwd Channel Tunnel
Details
10-10-2021
4.00
Staring Fwd Lower Fuselage
Details
10-03-2021
2.00
Completion of section 21iS
Details
10-03-2021
4.00
Attaching F-01213-L-1 & -R-1 in Section 21iS
Details
10-02-2021
3.00
Separating bottom parts and cleco'ing bottom skin.
Details
10-02-2021
4.00
Lower Fuselage Corner Skins
Details
09-23-2021
4.00
Lower Fuselage forward of seat ribs part 2
Details
09-23-2021
2.00
Lower Fuselage Forward of Seat Ribs
Details
09-19-2021
3.00
Continuing Bulkhead forward to seat rib bulkhead
Details
09-19-2021
3.00
Continuing 21iS/U-13 to 15 part 2
Details
09-18-2021
4.00
Continuing Seat Ribs and Attaching to Bulkhead
Details
09-18-2021
2.00
Attaching Seat Ribs and Floors to Bulkhead
Details
09-13-2021
2.00
Bearing Bracket Assemblies
Details
09-12-2021
4.00
Starting Seat Ribs
Details
09-12-2021
4.00
Continuing Seat Rib Preparation
Details
09-11-2021
4.00
Continuing Mid-Fuse Ribs
Details
09-11-2021
2.00
Completing the Flaperon Mixer Arm
Details
09-05-2021
5.00
Baggage Ribs
Details
09-04-2021
6.00
Start Section 21 Baggage Floors
Details
08-29-2021
5.75
Completing Section 20
Details
08-29-2021
0.25
Complete section 20 final step
Details
08-28-2021
6.00
Starting Fuselage Kit
Details
08-22-2021
6.00
Prepare Parts
Details
08-21-2021
6.00
Prepare Parts
Details
08-16-2021
3.00
Delivery of Fuselage Kit
Details
03-28-2021
2.00
Installed nav/position/strobe on Right Wing
Details
03-27-2021
5.00
Right wing fiberglass extension for nav/position/s
Details
03-21-2021
5.00
Starting the Right nav/position/strobe
Details
03-20-2021
5.00
Starting the Right Wing Tip Close Out
Details
02-28-2021
4.00
Starting on the Right Flaperon
Details
02-28-2021
3.00
Finishing the Right Flaperon
Details
02-21-2021
4.00
Complete Left Flaperon
Details
02-20-2021
5.00
Work on Left Flaperon
Details
02-14-2021
3.00
Starting Flaperons - Left
Details
02-06-2021
3.00
Attached and tested Left Nav/Pos/Strobe
Details
01-31-2021
5.00
Attach Fiberglass Extension for Left nav/position/
Details
01-30-2021
5.00
Starting the Left Nav/Position/Strobe Light
Details
01-24-2021
5.00
Starting the Wing Tip Close out on Left Wing
Details
01-23-2021
8.00
Finishing Left Landing Light
Details
01-17-2021
4.00
Continue the left landing light
Details
01-10-2021
5.00
Installing Landing Light Left Wing
Details
01-09-2021
2.00
Starting the Wing Tip Parts
Details
01-03-2021
5.00
Upper Right Wing Skins
Details
01-02-2021
4.00
Finish Lower Right Wing Skins
Details
01-01-2021
5.00
Right Wing Skins
Details
12-31-2020
8.00
Finish Right Nose Ribs and Wiring Harness
Details
12-27-2020
3.00
Attach Nose Ribs to Right Wing Skeleton
Details
12-26-2020
3.00
Finish Framing Right Wing
Details
12-24-2020
3.00
Framing the Right Wing Skeleton
Details
12-23-2020
6.00
Complete Left Wing Skins
Details
12-21-2020
2.00
Repair Per Van's Engineering Instructions
Details
05-24-2020
8.00
Left Wing top skins and quit
Details
05-23-2020
8.00
Finish Lower Skins and Time to Call Support
Details
05-17-2020
8.00
Starting the Left Wing Skins
Details
05-09-2020
8.00
Stall Warning and AOA installation Left Wing
Details
05-09-2020
5.00
AOA and Stall Warning
Details
03-09-2020
3.00
Complete Left Main Ribs and Most Left Nose Ribs
Details
03-08-2020
8.00
Finish Preping Wing Ribs and Start Framing Left Wi
Details
03-08-2020
1.00
2nd half of today's entry
Details
03-07-2020
8.00
Wing Rib Preparation
Details
03-02-2020
6.00
Complete Section 14 Rear Spar Assemblies
Details
02-23-2020
5.00
Flaperon Hinge Brackets and Hinge Assemblies
Details
02-15-2020
2.00
Continue Stub Spar Assemblies Left and Right
Details
02-02-2020
1.00
Prepping the W-1210B-L &-R Stub Spar Doublers
Details
02-02-2020
3.00
Completion of Section 13 Wing Spar Assemblies
Details
02-01-2020
2.00
Section 13 Wing Spar Beginning
Details
01-20-2020
4.50
Empennage Kit Complete - Stabilator Fairing Final
Details
01-19-2020
2.00
Stabilator Tip Fairings
Details
12-24-2019
6.00
Stabilator Tip Fairings
Details
12-22-2019
5.00
Attach Trim Servo Assembly to Tail Cone
Details
12-21-2019
5.00
Pitch Trim Servo Motor Wiring and Pushrod assmebly
Details
11-27-2019
2.00
Start Servo Tray
Details
11-26-2019
8.00
Stabilator Assembly Attachment to Tailcone
Details
11-26-2019
1.00
2nd Day Entry Safety Wire AST Hinge Pins
Details
11-24-2019
2.00
V-Stab Assembly and Rudder Attachment
Details
11-24-2019
4.00
Completed Vertical Stabilizer Modifications for IF
Details
11-09-2019
3.00
V-Stab Tip Fairing Modification for VOR Antenna
Details
11-09-2019
2.50
Empennage Fairing Installation
Details
10-27-2019
2.00
Configure V-Stab for AV-532L and Cable
Details
10-27-2019
4.50
Completed Tailcone
Details
10-20-2019
5.00
Tail Cone Skin Riveting and Top Skin Prep
Details
10-19-2019
1.00
Upper Skins and Snap Bushings
Details
10-19-2019
1.00
Static Air System and Aft Pitot Line
Details
10-19-2019
4.00
Routing Pull Strings for Control Cables and Static
Details
10-19-2019
1.00
Installed VOR Antenna Cable into Tail Cone
Details
10-13-2019
8.00
Started Assembling the Tail Cone
Details
10-13-2019
0.50
Continuation of previous log entry
Details
10-09-2019
2.50
Fit Stabilator Assembly to F-1211 Assembly
Details
10-05-2019
6.00
Completed Fuselage Bulkhead Assembly
Details
09-29-2019
3.50
Fuselage Bulkhead Continuation
Details
09-28-2019
4.50
Fselage Bulkhead
Details
08-31-2019
5.00
Continued F-1211G and started Bulkhead
Details
08-24-2019
5.00
Fabricate F-1211G Tail Skid Bracket
Details
08-18-2019
5.50
Preparing and Assembling Tail Cone Frames
Details
08-17-2019
5.00
Preparing Tail Cone Skins
Details
08-11-2019
4.00
Moved all parts and tools to the hanger
Details
03-25-2019
2.00
Receive and Inventory Wing Kit
Details
03-24-2019
1.00
Attach aft skins HS-1217
Details
03-23-2019
6.00
Completed Stabilator Assembly
Details
03-23-2019
2.00
Attach Skin Splice and Aft Ribs
Details
02-15-2019
6.00
Horizontal Stab Skin Installation
Details
02-02-2019
1.00
Primed interior surfaces of the Main Horizontal St
Details
01-20-2019
1.00
Preparing HS-01201-1 Main Skins
Details
12-29-2018
6.00
Complete Stabilator Skeleton Assembly
Details
12-25-2018
2.00
Stab Hinge Drilling and Stabilizer Rib Preparation
Details
12-24-2018
3.00
Horizontal Stabilator Ribs and Rib Clips
Details
12-23-2018
2.00
Continuing Horitontal Stabilator
Details
12-23-2018
5.00
Continued Spar Box Assembly
Details
12-22-2018
6.00
Rebuild Anit Servo Tabs
Details
12-15-2018
4.00
Attaching Fwd and Aft Spar to Spar Cap Assembly
Details
12-08-2018
6.00
Begin Working on Stabilator
Details
12-02-2018
2.00
Anti Servo Tabs first attempt, scrapping work
Details
12-01-2018
1.25
Started Building Anti Servo Tabs
Details
11-17-2018
2.50
Completion of Rudder Skeleton Assembly
Details
11-17-2018
4.50
Completed Rudder Assembly
Details
11-16-2018
1.25
Rudder Skeleton Assembly
Details
11-14-2018
1.50
Rudder Spar, Spar Caps, and Hinge Prep
Details
11-10-2018
7.00
Completed Vertical Stabalizer Section Six
Details
11-09-2018
1.00
Vertical Stabalizer Front Skin Remove Waste Materi
Details
11-09-2018
3.00
Completed V-stab Skeleton Assembly
Details
11-07-2018
0.75
Final Prep & Primed VS1202 and VS1212A-L&R
Details
11-05-2018
0.75
Riveted Upper Spar both Left and Right
Details
11-04-2018
4.00
Riveted Rudder Hinges and Final Drilled Spar Caps
Details
10-13-2018
1.50
Upper and Lower Hinge Assemblies
Details
10-13-2018
4.00
Spar and Spar Cap Preparation
Details
10-07-2018
3.50
Completed Inventory of Subkits 1-6
Details
10-06-2018
2.00
Unpacking Empennage Kit and Inventory of Parts
Details
SITE NAVIGATION
Contact Builder
RV-12is Home
Category
# Logs
# Hours
All
166
634
Avionics
2
3
Empennage
61
202
Fuselage
59
232
Miscellaneous
2
7
Wings
42
190
Copyright © 2001-2025 Matronics. All Rights Reserved.