Trimmed extra material from the recessed area of the HS-1225 (left) Stabilator Tip Fairing per the dimension 15/32nds given in figure 2 reference page. Then sanded the last 1/16 inch. Using a file, created relief notches in the recessed area on the HS-1225 Fairing where the recessed area interfered with rivet shop heads, rib flutes and stabilator structure per figure 3 same page.
Incomplete, final sanding still needed.
Moved Empennage from Bench to Stand and relocated to the side of the hangar to prepare room for Wing Kit.