KitLog pro

Powered By Kitlog Pro v2.0

306TD Web Site
Work Logs Found: 61
Category Work Time: 202 Hours
 Date
Hours
Work Log Summary

Details

 03-20-2022
0.25
Completed Service Directive SD-00001
Details
       

 03-14-2022
0.25
Finished all but clevis pin
Details
     

 03-13-2022
0.50
Started disassembly of Servo Motor for Service Dir
Details
     

 03-12-2022
3.50
Tailcone Skin Stiffening Clips SB00053
Details
       

 01-20-2020
4.50
Empennage Kit Complete - Stabilator Fairing Final
Details
       

 01-19-2020
2.00
Stabilator Tip Fairings
Details
       

 12-24-2019
6.00
Stabilator Tip Fairings
Details

 12-22-2019
5.00
Attach Trim Servo Assembly to Tail Cone
Details
       

 12-21-2019
5.00
Pitch Trim Servo Motor Wiring and Pushrod assmebly
Details
       

 11-27-2019
2.00
Start Servo Tray
Details
       

 11-26-2019
8.00
Stabilator Assembly Attachment to Tailcone
Details
     

 11-26-2019
1.00
2nd Day Entry Safety Wire AST Hinge Pins
Details

 11-24-2019
2.00
V-Stab Assembly and Rudder Attachment
Details
     

 11-24-2019
4.00
Completed Vertical Stabilizer Modifications for IF
Details
       

 11-09-2019
3.00
V-Stab Tip Fairing Modification for VOR Antenna
Details
     

 11-09-2019
2.50
Empennage Fairing Installation
Details
     

 10-27-2019
4.50
Completed Tailcone
Details
     

 10-20-2019
5.00
Tail Cone Skin Riveting and Top Skin Prep
Details
       

 10-19-2019
1.00
Upper Skins and Snap Bushings
Details
     

 10-19-2019
1.00
Static Air System and Aft Pitot Line
Details
     

 10-19-2019
4.00
Routing Pull Strings for Control Cables and Static
Details
     

 10-13-2019
8.00
Started Assembling the Tail Cone
Details
       

 10-13-2019
0.50
Continuation of previous log entry
Details
       

 10-09-2019
2.50
Fit Stabilator Assembly to F-1211 Assembly
Details

 10-05-2019
6.00
Completed Fuselage Bulkhead Assembly
Details
       

 09-29-2019
3.50
Fuselage Bulkhead Continuation
Details

 09-28-2019
4.50
Fselage Bulkhead
Details
       

 08-31-2019
5.00
Continued F-1211G and started Bulkhead
Details
       

 08-24-2019
5.00
Fabricate F-1211G Tail Skid Bracket
Details
       

 08-18-2019
5.50
Preparing and Assembling Tail Cone Frames
Details
       

 08-17-2019
5.00
Preparing Tail Cone Skins
Details
     

 03-24-2019
1.00
Attach aft skins HS-1217
Details

 03-23-2019
6.00
Completed Stabilator Assembly
Details

 03-23-2019
2.00
Attach Skin Splice and Aft Ribs
Details
     

 02-15-2019
6.00
Horizontal Stab Skin Installation
Details
       

 02-02-2019
1.00
Primed interior surfaces of the Main Horizontal St
Details

 01-20-2019
1.00
Preparing HS-01201-1 Main Skins
Details

 12-29-2018
6.00
Complete Stabilator Skeleton Assembly
Details
       

 12-25-2018
2.00
Stab Hinge Drilling and Stabilizer Rib Preparation
Details
     

 12-24-2018
3.00
Horizontal Stabilator Ribs and Rib Clips
Details

 12-23-2018
2.00
Continuing Horitontal Stabilator
Details
       

 12-23-2018
5.00
Continued Spar Box Assembly
Details

 12-22-2018
6.00
Rebuild Anit Servo Tabs
Details

 12-15-2018
4.00
Attaching Fwd and Aft Spar to Spar Cap Assembly
Details
       

 12-08-2018
6.00
Begin Working on Stabilator
Details
       

 12-02-2018
2.00
Anti Servo Tabs first attempt, scrapping work
Details
       

 12-01-2018
1.25
Started Building Anti Servo Tabs
Details

 11-17-2018
2.50
Completion of Rudder Skeleton Assembly
Details
       

 11-17-2018
4.50
Completed Rudder Assembly
Details
       

 11-16-2018
1.25
Rudder Skeleton Assembly
Details
       

 11-14-2018
1.50
Rudder Spar, Spar Caps, and Hinge Prep
Details

 11-10-2018
7.00
Completed Vertical Stabalizer Section Six
Details
       

 11-09-2018
1.00
Vertical Stabalizer Front Skin Remove Waste Materi
Details

 11-09-2018
3.00
Completed V-stab Skeleton Assembly
Details
       

 11-07-2018
0.75
Final Prep & Primed VS1202 and VS1212A-L&R
Details

 11-05-2018
0.75
Riveted Upper Spar both Left and Right
Details

 11-04-2018
4.00
Riveted Rudder Hinges and Final Drilled Spar Caps
Details
       

 10-13-2018
1.50
Upper and Lower Hinge Assemblies
Details
     

 10-13-2018
4.00
Spar and Spar Cap Preparation
Details
       

 10-07-2018
3.50
Completed Inventory of Subkits 1-6
Details
     

 10-06-2018
2.00
Unpacking Empennage Kit and Inventory of Parts
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.