Since the HS1205 Forward Outbd Ribs, the HS-1207 Outbd Main Ribs, and the HS-1208 Aft Ribs were already installed in the proper configuration for these fairings, removal and replacing was not necessary.
Trimmed extra material from the recessed area of the HS-1225 (right) Stabilator Tip Fairing per the dimension 15/32nds given in figure 2 reference page. Then sanded the last 1/16 inch. Using a file, created relief notches in the recessed area on the HS-1225 Fairing where the recessed area interfered with rivet shop heads, rib flutes and stabilator structure per figure 3 same page.