KitLog pro

Powered By Kitlog Pro v2.0

RV-7
Work Logs Found: 495
Category Work Time: 2357 Hours
 Date
Hours
Work Log Summary

Details

 05-02-2020
7.00
Test ELT, Swing compass, calibrate fuel gauges
Details
       

 04-30-2020
2.00
Pitot/static and transponder checks
Details
     

 04-26-2020
8.00
Inspection prep, compass, prop cycle
Details
       

 04-25-2020
7.00
Inspection prep
Details
       

 04-18-2020
7.00
Boots and Seals
Details
       

 04-11-2020
7.00
Idle circuit adjustments and taxi test
Details
       

 04-05-2020
6.00
Weight and Balance
Details
       

 04-04-2020
8.00
W&B Prep; fuel flow test at injectors
Details
       

 03-29-2020
5.00
First engine start!
Details
       

 03-28-2020
6.00
New fuel level sensors, rudder connections
Details
       

 03-22-2020
5.00
Fuel flow testing
Details
       

 03-16-2020
4.00
Fuel tank flushing
Details
       

 03-14-2020
7.00
Aileron stops, clips, fairing
Details
       

 03-12-2020
2.00
New tailwheel fork
Details
       

 03-08-2020
4.00
Calibrate the electronic compass
Details
       

 03-07-2020
3.00
Torque and safety prop
Details
       

 02-23-2020
4.00
Fit root fairings
Details
       

 02-16-2020
7.00
Wing walk and wingtip tuneup
Details
     

 02-15-2020
9.00
Plumbing and wing tips
Details
       

 02-09-2020
8.00
Wing pushrod and fuel plumbing
Details
       

 02-01-2020
9.00
Wing fitup
Details
       

 01-29-2020
3.00
Wings on!
Details
       

 01-25-2020
6.00
Plumbing and wing install prep
Details
       

 01-20-2020
8.00
Finalize pitot plumbing
Details

 01-12-2020
7.00
Install pitot
Details
       

 12-29-2019
9.00
Rebuild left elevator II
Details
     

 12-27-2019
7.00
Rebuild left elevator I
Details
       

 12-07-2019
6.00
Fit tailwheel
Details
       

 12-02-2019
8.00
!! Hangar rash !!
Details
       

 12-01-2019
6.00
Rivet on top deck
Details
       

 11-30-2019
2.00
Add N Number
Details
     

 11-27-2019
6.00
Attach and adjust trim tab
Details
       

 11-25-2019
6.00
Finalize rudder stops
Details
       

 11-17-2019
8.00
Install tail
Details
       

 11-07-2019
5.00
Upgrade hangar lighting
Details
     

 11-01-2019
6.00
Move to airport!
Details
       

 10-20-2019
4.00
Bleed brakes
Details
     

 10-19-2019
4.00
Add washer under lower engine mount to raise nose
Details
       

 10-12-2019
5.00
Fit cowl and measure gaps
Details
       

 10-05-2019
8.00
Misc FF tasks
Details
       

 09-15-2019
5.00
Cyl 2 baffle mods
Details
       

 09-08-2019
8.00
Baffle wraps
Details
       

 09-07-2019
6.00
Cowling smooth prime II
Details
     

 09-01-2019
7.00
Rudder stops; roll servo
Details
       

 08-25-2019
9.50
Baffles IV + brakes
Details
       

 08-04-2019
8.00
Fabricate front baffles III
Details
       

 07-28-2019
6.00
Fabricate front baffles II
Details
       

 07-14-2019
5.00
Add non-slip tape to brake pedals
Details
       

 07-13-2019
7.00
Fab front baffles
Details
       

 07-05-2019
6.50
Fit spinner II
Details
       

 07-04-2019
8.00
Fit spinner I
Details
       

 06-30-2019
8.60
Remove CS plug; start to fit spinner
Details
       

 06-29-2019
9.00
R wingtip, data plate, faap hing pin keepers
Details
       

 06-02-2019
4.50
Install wing tip lighting
Details
       

 05-19-2019
4.00
Fab air filter retainer clip; install oil cooler
Details
       

 05-12-2019
7.00
Add Cyl3 baffle mod
Details
       

 04-14-2019
6.00
Panted inside of cowl
Details
       

 04-13-2019
3.00
Finish snorkel; add alt air intake
Details
       

 03-25-2019
4.00
Complete layup of snorkel mod
Details
       

 03-24-2019
5.00
Shape plug and layup snorkel on engine
Details
       

 03-23-2019
6.00
Rework snorkel for fit to baffle deck
Details
       

 03-15-2019
7.00
Lay up plug flange
Details
       

 03-12-2019
2.00
Seal snorkel plug
Details
     

 03-10-2019
6.00
Snorkel fitting 1
Details
       

 03-09-2019
4.00
Snorkel fitting - tooling
Details
       

 02-14-2019
0.10
FAA Registration issued!
Details

 02-06-2019
0.10
N430WB registration sent to FAA
Details

 01-27-2019
6.00
Brake lines, gear leg fairings 1
Details
       

 01-26-2019
4.00
Cowl ramp mod 4
Details
       

 01-21-2019
3.00
Cowl ramp mod 3
Details
       

 01-20-2019
4.00
Cowl ramp mod 2
Details
       

 01-19-2019
4.00
Cowl ramp mod 1
Details
       

 01-13-2019
3.00
Sand down oil door rim
Details
       

 12-31-2018
4.50
Fill in rim around oil door
Details
       

 12-23-2018
5.00
Cowl fitting 7 - side joggles
Details
       

 12-09-2018
6.50
Install prop gov linkage; cowl flanges
Details
       

 12-02-2018
3.50
Fit top cowl intake ramps
Details
       

 12-02-2018
3.00
Cowl Fitting 5
Details
       

 11-18-2018
5.00
Fit oil door
Details
       

 11-10-2018
3.50
Cowl fitting 5
Details
       

 11-04-2018
5.00
Hang the prop! + Cowl fitting 4
Details
       

 11-03-2018
4.00
Cowl fitting 3
Details
       

 10-21-2018
6.50
Cowl fitting 2
Details
       

 10-20-2018
4.00
Cowl fitting 1
Details
       

 10-13-2018
2.00
Install rudder cable exit fairings
Details
     

 09-23-2018
3.00
Baffes 1
Details
       

 09-22-2018
5.00
Manfold pressure, engine vent, ring gear
Details
       

 09-09-2018
4.00
Sensor wire routing
Details
       

 09-08-2018
2.00
Fabricate engine ground straps
Details
       

 09-01-2018
4.50
Route EGT and CHT wiring
Details
       

 08-26-2018
3.50
Modify throttle fitting for clearance
Details
       

 08-19-2018
4.50
Install throttle and mixture brackets
Details
       

 08-18-2018
6.00
Install heat muff and prop gov fitting
Details
       

 08-12-2018
3.00
Initial fit of alternator and fan belt
Details
       

 08-05-2018
3.50
Install EGT and CHT probes
Details
       

 08-04-2018
5.50
Install exhaust stack (first time)
Details
       

 07-15-2018
6.00
Install engine
Details
       

 07-14-2018
5.00
Prep and install prop governer
Details
       

 07-08-2018
6.00
Install wheels on landing gear
Details
       

 07-04-2018
2.50
Prepping throttle bracket
Details
       

 06-30-2018
4.50
Fix up wiring squawks on panel
Details

 06-17-2018
4.00
Install ANL fuses and current shunts 2
Details
       

 06-16-2018
3.00
Install ANL fuses and current shunts 1
     

 06-09-2018
3.00
Targa strip 2
       

 06-03-2018
3.00
Targa strip 1
     

 05-20-2018
8.50
Install aft canopy, vents
Details
       

 05-19-2018
6.00
Tunnel cover, aft canopy install prep
Details
       

 05-06-2018
4.50
Flap positioner
Details
       

 05-05-2018
5.50
Coax and pitot routing
Details
       

 04-30-2018
0.10
Engine arrived
Details
       

 04-28-2018
7.00
Aeilron trim, copilot stick connector redux
       

 04-22-2018
5.50
Install pushrods, tailwheel
Details
       

 04-15-2018
6.50
Antenna install
Details
       

 04-08-2018
6.00
Add connector for copilot removable stick
Details
       

 04-01-2018
4.50
Panel smoke test
Details
     

 03-04-2018
8.00
Terminate panel wiring 2
Details
       

 02-25-2018
8.00
Terminate panel wiring 1
Details
       

 02-24-2018
7.00
Populate panel!
Details
       

 02-19-2018
2.50
Apply lettering to panel
Details
       

 02-18-2018
5.50
Fab and install fuel line from fuel flow to firewa
       

 02-11-2018
6.00
Closeout of tunnel, fuel pump, fuel flow
Details
       

 02-10-2018
4.50
Prime panel and terminate fuse block wiring
Details
       

 02-04-2018
4.00
Terminate cable bundle from tunnel to tray
Details
       

 02-03-2018
3.00
Terminate grounds to forest of tabs
Details
       

 01-28-2018
4.50
Lace wiring in tunnel
Details
       

 01-21-2018
3.50
Completion of subpanel
Details

 01-20-2018
4.00
Tunnel wiring
Details

 01-17-2018
0.10
Ordered engine and prop
Details

 01-07-2018
6.50
Panel fit-up
Details
     

 01-06-2018
7.50
Fab panel connector bracket and priming
Details
       

 01-01-2018
8.50
Air vent and headseat brackets
Details
       

 12-27-2017
7.00
Power and ground wiring I
Details
       

 12-26-2017
7.00
Tray cable termination
Details
       

 12-23-2017
6.00
Tray cable termination 1
Details
       

 12-22-2017
7.00
Completion of tray electronics install
Details
     

 12-17-2017
5.00
Battery backup and CO detector
Details
       

 12-03-2017
7.50
Tray wiring
Details
     

 11-26-2017
1.00
Tray wiring 1
Details
 

 11-25-2017
9.00
Finish GAD27 wiring; start the tray
Details
       

 11-22-2017
6.00
GAD27 wiring
Details
     

 11-21-2017
6.00
GAD27 wire arrangement
Details
       

 11-20-2017
4.50
GAD27 wiring prep
Details
     

 10-07-2017
7.00
Tray fit-up and firewall feedthrough
Details
       

 09-30-2017
6.50
GPS20A and pitch servo install
Details
       

 09-24-2017
6.50
GPS20A bracket install
Details
     

 09-23-2017
3.00
Wing root wire termination - left
Details
       

 09-10-2017
3.00
Wing root wire termination - right
Details
       

 09-04-2017
6.50
Antenna stiffeners and fwd static line
Details
       

 09-02-2017
4.00
Forward wiring runs
Details
       

 08-12-2017
6.50
Fit panel center support
Details
       

 03-26-2017
5.00
GAD27 Mount
Details
       

 03-25-2017
2.00
Wingtip filling 6
Details
     

 03-25-2017
1.50
Drill GPS antenna mount
Details
       

 03-19-2017
2.00
Wingtip fitting 5
Details
       

 03-19-2017
3.50
Magnetometer shelf
Details
       

 03-12-2017
2.00
Wheel assembly
Details
       

 03-12-2017
3.50
GPS antenna plate
Details
       

 03-05-2017
3.00
Wingtip fitting 4
Details
       

 03-05-2017
3.00
Wingtip fitting 4
       

 03-04-2017
3.00
Wingtip fitting 3
Details
     

 02-26-2017
8.00
Wingtip fitting 2
Details
       

 02-19-2017
7.00
Wingtip fitting 1
Details
       

 02-11-2017
6.50
Cowling prep - filling 3
Details
       

 02-05-2017
5.00
Cowling prep - filling 2
Details
     

 02-04-2017
6.50
Cowling prep - filling 1
Details
       

 01-28-2017
2.00
Static tubing clips
Details
     

 01-28-2017
3.00
Baffle prep - airbox fram
Details
     

 01-16-2017
6.00
Oil cooler prep
Details
     

 01-15-2017
5.00
Baffle work 1
Details
     

 01-02-2017
7.50
Install tailcone top skin 1
Details
       

 01-01-2017
6.50
Install canopy positioner
Details
       

 12-30-2016
4.00
Canopy fairing 4
Details
     

 12-29-2016
0.10
Canopy in action
Details
       

 12-29-2016
7.00
Canopy fairing 3
Details
       

 12-28-2016
4.00
Canopy fairing 2
Details
       

 12-26-2016
4.50
Canopy fairing 1
Details
       

 12-24-2016
4.00
Firewall prep 1
Details
       

 12-18-2016
6.50
Install battry box and contactors
Details
       

 12-18-2016
2.00
Firewall forward kit arrives
Details
     

 12-11-2016
4.00
Cabin work
Details
       

 12-03-2016
5.50
Canopy fairing complete
Details
       

 11-20-2016
5.00
Canopy fairing, static port, main gear releif
Details
       

 11-19-2016
8.50
Canopy fairing 6 / engine mount
Details
       

 11-13-2016
4.50
Canopy fairing 5
Details
       

 11-06-2016
4.00
Canopy fairing 4
Details
       

 11-01-2016
3.50
Canopy fairing 3
Details
       

 10-29-2016
4.50
Canopy fairing 2
Details
       

 10-23-2016
7.00
Canopy fairing 1 / latch
Details
       

 10-22-2016
8.50
First canopy lift
Details
       

 10-09-2016
6.00
Install avionics shelf
Details
       

 10-08-2016
8.50
Aft avionics shelf
Details
       

 09-25-2016
7.00
Canopy bonding
Details
       

 09-22-2016
7.50
Prep for canopy bonding
Details
       

 09-17-2016
6.00
Rivet canopy frame
Details
       

 09-11-2016
3.50
Clamps for canopy bonding
Details
     

 09-11-2016
4.00
Canopy frame fit check
Details
       

 09-10-2016
3.50
Pre-rivet canopy frame gussets
Details
     

 09-05-2016
3.50
Priming and painting canopy parts
Details
       

 09-03-2016
3.00
Priming canopy frame
Details
     

 08-28-2016
7.50
Fitting canopy frame gussets
Details
       

 08-27-2016
5.00
Riveting canopy frame and hoop
Details
       

 08-21-2016
4.50
Initial fit of rear canopy
Details
       

 08-20-2016
7.50
Canopy fitup - lexan IV
Details
       

 08-14-2016
6.00
Canopy fitup - lexan III
Details
       

 08-13-2016
8.00
Canopy fitup - lexan II big cut
Details
       

 08-11-2016
8.00
Canopy fitup - lexan I
Details
       

 08-07-2016
8.00
Canopy fitup V - redux
Details
       

 07-31-2016
7.50
Canopy fitup IV - redux
Details
       

 07-30-2016
8.00
Canopy fitup III - redux
Details
       

 07-17-2016
4.50
Canopy hoop joiner plate
Details
     

 07-12-2016
5.00
Flap arm install
Details
       

 07-10-2016
5.00
Canopy fitup III - redux
Details
       

 07-03-2016
7.00
Canopy fitup II - redux
Details
       

 06-26-2016
7.50
Canopy fitup I - redux
Details
       

 05-29-2016
6.00
Canopy fitup V
Details
       

 05-22-2016
5.00
Canopy fitup IV
Details
       

 05-21-2016
8.00
Gas strut brackets, rear canopy fitup
Details
       

 05-15-2016
6.00
Prep for more canopy work
Details
       

 05-14-2016
6.00
Drill canopy hinge brackets
Details
       

 05-08-2016
6.70

       

 05-07-2016
7.00
Servo, skin, roll bar
Details
       

 05-01-2016
7.50
Avionics tray
Details
       

 04-30-2016
6.00
Canopy fitup III
Details
       

 04-10-2016
5.00
Canopy fitup II
Details
       

 04-09-2016
6.00
Canopy fitup I
Details
       

 04-02-2016
5.00
Install canopy latch connect
Details
       

 03-12-2016
2.50
Wingtip filling 1
Details
       

 03-12-2016
6.50
Rear canopy latch and initial front canopy fit
Details
       

 03-06-2016
8.50
JDAirParts canopy latch 1
Details
       

 03-05-2016
7.50
JDAirParts canopy latch 1
Details
       

 02-28-2016
8.00
Canopy release mechanism 2
Details
       

 02-27-2016
9.00
Pump cover and canopy bearing blocks
Details
       

 02-22-2016
4.00
Storing the finishing kit parts
Details
     

 02-21-2016
8.00
Fuel line cover bracket and new fuse cart
Details
       

 02-14-2016
4.50
Finishing kit arrives!
Details
       

 02-13-2016
7.50
Roll trim installation
Details
       

 02-07-2016
6.00
Andair fuel filter brackets
       

 02-06-2016
5.00
Priming and painting cabin parts
Details
     

 01-30-2016
3.00
Roll trim prep
Details
     

 01-23-2016
8.50
Fuel pump mounting and plumbing
Details
       

 01-17-2016
8.00
Fuel line install 2
Details
       

 01-16-2016
7.50
Fuel line install 1
Details
       

 01-10-2016
6.00
Cabin and fuel valve
Details
       

 01-03-2016
4.50
Fit forward deck
Details
       

 12-30-2015
5.00
Vent brackets
Details
     

 12-28-2015
6.00
Panel fitup
Details
       

 12-26-2015
5.00
Panel edging 2
Details
       

 12-19-2015
5.00
Panel edging
Details
     

 12-13-2015
7.50
Canopy frame mount brackets 2
Details
       

 12-12-2015
7.00
Canopy frame mount brackets 2
       

 12-06-2015
8.00
Canopy frame mount brackets
Details
       

 12-06-2015
1.00
Canopy frame assembly
Details
       

 11-25-2015
1.00
Canopy frame cleanup
Details
     

 11-24-2015
8.00
Fabricate canopy frame
Details
       

 11-23-2015
0.10
Ordered finishing kit
Details

 11-23-2015
6.00
Drilled the lower rudder attach holes
Details
     

 11-22-2015
7.00
Elevator attach drillings
Details
       

 11-07-2015
6.00
Initial install of elevator pushrod
Details
       

 11-01-2015
6.00
Drilling of elevator horns
Details
       

 10-31-2015
4.50
Elevator pushrod fabrication
Details
       

 10-25-2015
7.00
Install tubing for brake lines
Details
       

 10-24-2015
6.50
Right side tank vent.
Details
       

 10-18-2015
7.00
Install control column
Details
       

 10-11-2015
0.10
Wing aft spar adjuster
Details
       

 10-11-2015
8.50
Install fuel tank brackets; adjust gap between top
Details
       

 10-10-2015
9.00
Wing incidence setting and rear spar drilling
Details
       

 10-10-2015
0.20
Wing incidence jig
Details
       

 10-10-2015
0.10
Aft spar drill jig
Details
       

 10-04-2015
9.50
Left wing flap trimming
Details
       

 10-03-2015
7.00
Left wing control surface alignmnet
Details
       

 09-27-2015
7.00
Right wing control surface alignment
Details
       

 09-26-2015
5.00
Initial install of the ailerons and flaps.
Details
       

 09-20-2015
6.00
Wing aft spar install shim, seat pan cover
Details
       

 09-20-2015
0.20
Drift pins and temporary main bolts
Details
     

 09-13-2015
7.00
Make fwd cover parts, prime/paint, fit up panel
Details
       

 09-12-2015
5.00
Top skin dimpling 2
Details
     

 09-12-2015
7.50
First wing install!
Details
       

 09-07-2015
7.00
Top skin dimpling 1
Details
       

 09-05-2015
6.00
Seat pan drilling for hinges (redo)
Details
     

 08-30-2015
6.00
Baggage floor install
Details
       

 08-29-2015
7.00
Full baggage panel fitup
Details
       

 08-23-2015
7.60
Baggage back panel completion, nutplate install
Details
       

 08-22-2015
8.00
Fit and drill top skins, baggage side panels, bagg
Details
       

 08-15-2015
7.50
Final assembly of flap housing and elevator bellcr
Details
       

 07-19-2015
6.50
Assembly, fit of flap housing
Details
       

 07-11-2015
6.00
Riveting F-705 and canopy deck
Details
       

 07-05-2015
6.00
Seat fabrication and fuse bracket install
Details
       

 07-04-2015
7.00
Priming and painting seast and crotch strap mounts
Details
       

 07-01-2015
5.00
Flap linkage install and flap housing parts
Details
       

 06-26-2015
7.50
Upper firewall gussets canopy deck
Details
       

 06-13-2015
7.00
Drilling the aft deck
Details
       

 06-07-2015
7.50
Rolling the canoe!
Details
       

 06-06-2015
3.00
Rotisserie prep
Details

 05-31-2015
4.00
Final fuse riveting, part 2
Details
     

 05-25-2015
7.00
SB 14-01-31 Horizontal Stab 3
Details
       

 05-24-2015
8.00
SB 14-01-31 Horizontal Stab 2
Details
       

 05-23-2015
4.00
SB 14-01-31 Horizontal Stab 1
Details
       

 05-17-2015
5.00
Riveting and seat priming
Details

 05-09-2015
5.00
Getting ready for the rotisserie
Details
       

 04-26-2015
6.00
Final fuse riveting, part 1
Details
       

 04-25-2015
8.00
Finishing the seat fit-up
Details
       

 04-19-2015
8.00
Building up the seats
Details
     

 04-12-2015
6.50
Forward fuse riveting, where I can.
Details
     

 04-11-2015
6.00
Loading and tapeing rivets
Details

 03-29-2015
8.00
Fuse reassembly2
Details
       

 03-28-2015
6.00
Fuse reassembly1
Details
       

 03-21-2015
7.50
Fuse reassembly prep
Details
       

 03-15-2015
6.50
Misc. cabin painting and prep
Details
     

 03-14-2015
8.50
Painting the interior cabin surfaces
Details
       

 03-07-2015
8.50
D&D fuse side skins, priming of fwd fuse parts
Details
       

 03-01-2015
5.50
Dimpling, deburring, and prepping fuse skins
Details
       

 02-28-2015
7.00
Fuse disassembly for dimpling, etc
Details
     

 02-21-2015
3.00
Beginning final drilling prior to dipmling
Details
     

 02-08-2015
3.50
Fitting up rudder and brake pedals
Details
       

 02-01-2015
4.00
Riveting brake pedals
Details
       

 01-31-2015
5.00
Forward tank mount stiffeners and brake pedals
Details
     

 01-25-2015
6.50
Drilling firewall to fuse brackets
Details
       

 01-24-2015
6.00
Forward fuse stiffeners and longerons
Details
       

 01-11-2015
6.00
Initial mounting of the firewall
Details
       

 01-04-2015
5.00
Making the conical bends
Details
       

 01-02-2015
6.00
Initial mating of center section and tail cone
Details
       

 01-01-2015
4.50
Drilling crotch strap brackets
Details
       

 12-30-2014
7.00
Riveting tailcone and center section
Details
       

 12-29-2014
5.00
Assembling center section 2
Details
       

 12-28-2014
5.00
Starting to rivet center section
Details
       

 12-26-2014
5.50
Priming center section components
Details
       

 12-20-2014
4.00
Set spacing on passthru spar
Details
       

 12-14-2014
6.00
Began assy of center fuselage
Details
       

 12-07-2014
4.00
Prepping cener seat ribs.
Details
       

 12-06-2014
4.00
Fuselage riveting 2
Details

 11-26-2014
5.50
Fuselage riveting 1
Details

 11-25-2014
5.00
Riveted the tailhweel assy
Details
       

 11-23-2014
4.00
Priming tailcone skins
Details
       

 11-22-2014
5.50
Prepping tailcone for priming
Details
       

 11-16-2014
6.50
Cleco and drill tailcone
Details
       

 11-15-2014
4.00
Fabricate tailwheel assembly 2
Details

 11-09-2014
6.00
Fabricate tailwheel assy
Details
       

 11-08-2014
6.00
Making the big bend
Details
       

 11-02-2014
2.00
Begin initial assembly of tail cone
Details
       

 11-01-2014
7.00
Rearrange shop and fabricate saw horses

 10-18-2014
8.50
Rivet F-704 spar feedthru and firewall
Details
       

 10-12-2014
6.00
Rivet fuselage bulkheads thru F-706
Details
       

 10-05-2014
6.00
Primed fuselage bulkheads
Details
       

 10-04-2014
3.00
Final fuselage bulkhead prep
Details

 09-07-2014
5.00
F-704 and F-705 bulhead work
Details

 08-31-2014
5.00
F-705 bulkhead prep
Details

 08-27-2014
1.00
Co-pilot stick grip prep
Details
       

 08-17-2014
0.25
Loose bars on F-704F
Details
       

 08-17-2014
6.00
Firewall bulkhead assy 2
Details
       

 08-16-2014
4.00
Firewall bulkhead assy 1
Details
       

 08-13-2014
7.50
Assemble flap actuaor, elevator bellcrank
Details
       

 07-20-2014
3.50
Installed right inboard bottom skin
Details

 07-19-2014
3.50
Final prep of right wing for bottom skinning
Details

 07-05-2014
5.50
Rivet on right top skin
Details
       

 07-01-2014
3.00
Parts inventory and sorting
Details
       

 06-30-2014
3.00
Fuse kit arrives!
Details
       

 06-22-2014
6.50
Left outboard bottom skin riveting
Details
     

 06-21-2014
6.00
Left inboard bottom skin riveting
Details
       

 05-31-2014
5.00
Left wing internals
Details
       

 05-05-2014
0.10
Fuse kit on order
Details

 04-05-2014
6.00
Finished up right aileron .. control surfaces done
Details
       

 03-30-2014
2.00
Right aileron assembly and screw-up
Details
       

 03-29-2014
6.00
Aileron assembly
Details
       

 03-23-2014
6.50
Flaps done; ailerons in work
Details
       

 03-22-2014
5.50
Flap assembly
Details
       

 03-20-2014
1.50
Control surface riveting
Details
       

 03-17-2014
0.50
Aileron and flap rivet prep
Details

 03-16-2014
4.00
Aileron skin dimpling and priming
Details

 02-09-2014
4.00
Finnished flap prep
Details
       

 02-08-2014
4.00
Drilling the flaps
Details

 02-02-2014
6.00
Attaching the flaps
Details
       

 01-19-2014
6.00
L wing skin prep, aileron brackets
Details

 01-18-2014
2.00
Prepping for L wing skin riveting
Details

 01-12-2014
5.50
Finished left top skins; started ailerons
Details
       

 01-11-2014
4.50
L wing top skins
Details
       

 12-31-2013
4.50
Tank fitting and top skins cleco
Details
       

 12-30-2013
3.00
Riveted topside LE to spar
Details
       

 12-29-2013
3.50
Rivet right LE to spar
Details
       

 12-28-2013
3.00
Stall warner and landing lights installed
Details
       

 12-27-2013
4.50
Etch and prime skins
Details
       

 12-24-2013
3.00
Drilling dimple relief countersinks in the spar
Details
     

 12-23-2013
2.50
Main wing skin prep .. part 3
Details

 12-22-2013
4.50
Main wing skin prep .. part 2
Details
       

 12-21-2013
3.00
Main wing skin prep .. part 1
Details
     

 12-14-2013
2.00
Leak tested the tanks
Details
       

 12-14-2013
2.50
Assy the leading edges .. pt 2
Details

 12-08-2013
6.00
Assy the leading edges .. pt 1
Details
       

 12-07-2013
5.00
Prepping for LE riviting
Details

 12-01-2013
1.50
Beginning LE dimpling
Details

 11-17-2013
3.00
Install left tank baffle
Details
       

 11-16-2013
3.50
Install right rear baffle
Details
       

 11-09-2013
4.50
Riviting the tanks .. 5
Details
       

 11-03-2013
4.00
Anti hangup fixtures and trap door
Details
       

 11-02-2013
4.00
Capacitaive fuel sender install
Details
       

 10-27-2013
4.50
Riveting the tanks .. 4
Details

 10-26-2013
5.00
Riveting the tanks .. 3
Details
       

 10-24-2013
1.00
Riveting the tanks .. 2
Details

 10-20-2013
4.00
Riveting the tanks .. 1
Details
       

 10-19-2013
1.00
Forward inboard tank bracket (do over)
Details
     

 10-17-2013
1.50
Prep of inboard tank ribs
Details
       

 10-13-2013
6.00
Sealing right tank inside ribs
Details
       

 10-12-2013
4.50
Sealing left tank inside ribs
Details
       

 10-06-2013
4.00
Stiffener install
Details
       

 10-05-2013
6.50
Final tank prep
Details
       

 10-03-2013
1.00
Dimpled right skin
Details
     

 09-29-2013
5.00
Caps and drains and senders
Details
       

 09-22-2013
4.00
Fabricate forward attach bracket
Details
       

 09-22-2013
4.50
Drilling the z brackets - left wing
Details
       

 09-21-2013
5.00
Drilling the z-brackets - Right wing
Details
       

 09-14-2013
1.50
Tank cradle
Details
     

 09-14-2013
5.50
Initial fit of tanks on spars
Details
       

 09-13-2013
1.50
Fabricate tank stiffiners
Details
     

 09-12-2013
2.00
Initial install of brackets to spars
Details
       

 09-10-2013
1.00
Riveting nutplates onto Z-brackets
Details
       

 09-08-2013
2.00
Drilling brackets to spars
Details
       

 09-07-2013
2.00
Starting the tanks
Details

 09-07-2013
1.00
Drilling the LE and starting the tanks
Details

 09-02-2013
6.00
Left outboard leading edge
Details
       

 09-01-2013
2.00
Fitting the right bottom skins
Details

 08-31-2013
2.50
Fitting the left bottom skins
Details

 08-30-2013
2.50
Fittng the top skins
Details
       

 08-24-2013
6.50
Buildup of wing skeleton
Details
       

 08-18-2013
6.00
Wing rib prep and priming
Details
       

 08-17-2013
10.00
First box assembly
Details
       

 08-12-2013
2.00
Flat ribs!
Details
       

 08-11-2013
2.00
Rear wing spar fitout
Details
       

 08-03-2013
2.00
Wing tiedown hardware install
Details
       

 07-31-2013
2.00
Tiedown mounts
Details
     

 07-28-2013
2.00
Spar nutplates done
Details

 07-27-2013
8.00
Back to work!
Details
       

 07-25-2013
2.50
Let the wing build begin!
Details
       

 07-13-2013
6.00
Wing stand
Details

 07-05-2013
5.00
Epennage closeout and storage
Details
       

 04-30-2013
0.00
Wing kit on order!
Details

 04-24-2013
0.50
Filling of VS tip and Rudder
Details

 04-23-2013
1.00
VS tip work
Details

 04-22-2013
0.50
VS tip work
Details

 04-15-2013
1.50
Rudder tip fiberglass
Details

 04-06-2013
0.50
Filling end of HS tips
Details
     

 03-31-2013
2.50
HS tip do-over
Details
       

 03-25-2013
0.50
Elevator tip fill (again)
Details
     

 03-24-2013
2.00
Elevator tip filling an shaping
Details
       

 03-19-2013
0.50
Elevator tips fill
Details
       

 03-17-2013
1.50
Elevator tip install
Details
       

 03-16-2013
1.50
HS fiberglass
Details
     

 03-12-2013
1.00
HS fiberglass
Details
       

 03-11-2013
1.50
HS fiberglass
Details

 03-04-2013
1.00
Checking elevator horn alignment
Details
     

 03-03-2013
4.00
Final fitting of the elevators
Details
       

 03-02-2013
4.75
Rolling the elevator LE
Details
       

 02-24-2013
3.00
Trim tab final assembly
Details
       

 02-21-2013
2.00
Trim tab buildup
Details

 02-19-2013
2.00
Riveting the left skin
Details

 02-18-2013
2.00
Riveting the left elevator
Details
       

 02-13-2013
2.00
Making riblets, part II
Details
     

 02-12-2013
2.00
Making riblets
Details
       

 02-10-2013
3.50
Starting left elevator
Details
       

 02-09-2013
5.50
Right rudder closeup
Details
       

 02-03-2013
3.00
Right elevator prep
Details
     

 02-02-2013
2.00
Bending elevator trailing edges
Details
       

 01-28-2013
1.50
Elevator stiffener riveting
Details
       

 01-27-2013
2.00
Elevator skin priing
Details

 01-22-2013
0.50
Elevator stiffener cleaning
Details

 01-19-2013
6.00
Riveted the rudder TE and formed LE
Details
       

 01-18-2013
1.00
Gluing the trailing edge wedge
Details
       

 01-15-2013
2.50
Rudder riveting
Details
     

 01-14-2013
1.00
Rudder riveting prep
Details
       

 01-13-2013
1.50
Riveting the rudder horn
Details
       

 01-12-2013
1.00
Rudder assembly
Details

 01-09-2013
1.50
Rudder assembly
Details

 01-08-2013
2.00
Fitting the rudder horn
Details
       

 01-07-2013
1.00
Fitting rudder skins
Details
       

 01-06-2013
1.00
Riveting rudder stiffeners
Details

 01-05-2013
0.50
Rudder skin priming
Details

 01-01-2013
0.50
Rudder skin priming
Details

 12-31-2012
2.00
Rudder skin prep
Details
     

 12-30-2012
3.50
Rudder skin dimpling
Details
       

 12-29-2012
4.50
HS complete
Details
       

 12-28-2012
3.50
Priming notes
Details
       

 12-27-2012
3.00
Priming .. fail!
Details

 12-24-2012
5.00
Starting VS
Details
       

 12-23-2012
3.50
HS completion
Details
       

 12-22-2012
6.50
HS assembly
Details
       

 12-20-2012
0.50
HS assembly
Details

 12-19-2012
1.00
HS spar assembly
Details
       

 12-18-2012
0.50
Priming HS parts
Details

 12-16-2012
4.00
Priming HS parts
Details
       

 12-15-2012
2.50
First primer experience
Details
     

 12-12-2012
3.50
HS assemby stress
Details
       

 12-11-2012
1.50
Drilling HS skins
Details
       

 12-10-2012
0.30
HS skin fitting
Details

 12-09-2012
5.00
Rib flange straightening tool
Details
       

 12-08-2012
5.50
HS parts prep
Details
       

 12-07-2012
1.50
Shop setup
Details

 12-05-2012
2.50
Empennage has entered the building!
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.