KitLog pro

Powered By Kitlog Pro v2.0

RV-7
Work Logs Found: 27
Category Work Time: 92 Hours
 Date
Hours
Work Log Summary

Details

 12-14-2013
2.00
Leak tested the tanks
Details
       

 11-17-2013
3.00
Install left tank baffle
Details
       

 11-16-2013
3.50
Install right rear baffle
Details
       

 11-09-2013
4.50
Riviting the tanks .. 5
Details
       

 11-03-2013
4.00
Anti hangup fixtures and trap door
Details
       

 11-02-2013
4.00
Capacitaive fuel sender install
Details
       

 10-27-2013
4.50
Riveting the tanks .. 4
Details

 10-26-2013
5.00
Riveting the tanks .. 3
Details
       

 10-24-2013
1.00
Riveting the tanks .. 2
Details

 10-20-2013
4.00
Riveting the tanks .. 1
Details
       

 10-19-2013
1.00
Forward inboard tank bracket (do over)
Details
     

 10-17-2013
1.50
Prep of inboard tank ribs
Details
       

 10-13-2013
6.00
Sealing right tank inside ribs
Details
       

 10-12-2013
4.50
Sealing left tank inside ribs
Details
       

 10-06-2013
4.00
Stiffener install
Details
       

 10-05-2013
6.50
Final tank prep
Details
       

 10-03-2013
1.00
Dimpled right skin
Details
     

 09-29-2013
5.00
Caps and drains and senders
Details
       

 09-22-2013
4.00
Fabricate forward attach bracket
Details
       

 09-22-2013
4.50
Drilling the z brackets - left wing
Details
       

 09-21-2013
5.00
Drilling the z-brackets - Right wing
Details
       

 09-14-2013
5.50
Initial fit of tanks on spars
Details
       

 09-13-2013
1.50
Fabricate tank stiffiners
Details
     

 09-12-2013
2.00
Initial install of brackets to spars
Details
       

 09-10-2013
1.00
Riveting nutplates onto Z-brackets
Details
       

 09-08-2013
2.00
Drilling brackets to spars
Details
       

 09-07-2013
2.00
Starting the tanks
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.