KitLog pro

Powered By Kitlog Pro v2.0

RV-7
Work Logs Found: 13
Category Work Time: 50 Hours
 Date
Hours
Work Log Summary

Details

 09-23-2018
3.00
Baffes 1
Details
       

 09-22-2018
5.00
Manfold pressure, engine vent, ring gear
Details
       

 09-09-2018
4.00
Sensor wire routing
Details
       

 09-08-2018
2.00
Fabricate engine ground straps
Details
       

 09-01-2018
4.50
Route EGT and CHT wiring
Details
       

 08-26-2018
3.50
Modify throttle fitting for clearance
Details
       

 08-19-2018
4.50
Install throttle and mixture brackets
Details
       

 08-18-2018
6.00
Install heat muff and prop gov fitting
Details
       

 08-12-2018
3.00
Initial fit of alternator and fan belt
Details
       

 08-05-2018
3.50
Install EGT and CHT probes
Details
       

 08-04-2018
5.50
Install exhaust stack (first time)
Details
       

 07-14-2018
5.00
Prep and install prop governer
Details
       

 04-30-2018
0.10
Engine arrived
Details
       










Copyright © 2001-2019 Matronics. All Rights Reserved.