KitLog pro

Powered By Kitlog Pro v2.0

RV-7
' style=
Date:  7-14-2018
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Prep and install prop governer

Prepping the engine for install ... the big missing piece is the prop governer. Removed the com er plate and prepped the flane. Installed and torqued the four governor bolts to spec, 180-220 in-lbs
' style=

Accessory end of the engine

Accessory end of the engine

' style=

Prop governer out of the box

Prop governer out of the box

' style=

Locked and loaded!

Locked and loaded!

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.